Download presentation
Presentation is loading. Please wait.
1
WATER – WASTEWATER TREATMENT EXPERIENCE
2
2010 New Buffalo WTP - Improvements
Paw Paw Lake Area Headworks Improvements Buchanan WTP - Improvements Grand Rapids Sewer Authority Lift Station 6 & 8 Replacement
3
2011 Three Rivers WTP - Improvements
Riverview Pump Station Improvements Kalamazoo WTP – Coarse Screen Replacement Huntington, IN WTP – Contract A Plainfield Township WTP – 2 Million Gallon Reservoir
4
2012 Dowagiac WWTP – Grit Collector Upgrade
South Bend WWTP – Primary Clarifier Rehab and Equipment Upgrades Dowagiac WWTP – Grit Collector Upgrade Grand Rapids WWTP - Demo & Removal of Sludge Storage Tanks & Appurtenant Structures Coldwater WTP – High Service Pump-Electrical System Plymouth Pine WTP - Improvements
5
2013 Benton Harbor St. Joseph WWTP – Grit Collector
Pinhook WTP – Efficiency Improvements Genesee WWTP – North Vortex Grit Tank at District 3 Three Rivers WWTP – Wood Girder
6
2013 Hastings WWTP - Improvements
Niles WTP – Ferrous Chloride System Replacement Grand Rapids WWTP – Waste Activated Sludge Thickening System CSX Barr Yard WWTP - Improvements
7
2014 Village of Mattawan – Bulk Chemical Storage – Lift Station #1
Wayne Township WTP – Booster Station Battle Creek – Chemical Feed System Modifications Three Rivers – Ferric Chloride Tank Improvements Royal Estates WWTP – Lagoon Battle Creek WWTP – Solids Handling Building
8
2014 Kalamazoo WWTP – Screw Pump Replacement
Ligonier WWTP - Improvements Kalamazoo WWTP – RAS Pump Replacement Hartford WWTP – System Improvements
9
2015 Hillsdale WWTP – System Improvements
Benton Harbor St. Joseph WWTP – Headworks & Misc. Improvements Benton Harbor St. Joseph WWTP – Aeration Tunnel Top Slab Concrete Repairs Dowagiac WWTP - Improvements
10
2015 Kalamazoo WTP – Franklin Pump Station Improvements
Bath Lift Station 208 & 209 Rehabilitation
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.