Presentation is loading. Please wait.

Presentation is loading. Please wait.

PlanPlus (http://planningonline.gov.in)

Similar presentations


Presentation on theme: "PlanPlus (http://planningonline.gov.in)"— Presentation transcript:

1 PlanPlus (http://planningonline.gov.in)
A tool for Decentralized, Participatory & Integrated District Planning

2 Planning As Is TFC BRGF NREGS Plan Gram Panchayat
Planning currently done in silos (scheme-based) May not match with the local needs (not demand driven) Convergence of funds not happening. Ineffective Utilization of funds Lack of collaboration among planning units – Resulting in duplication and ineffective planning Gram Panchayat NREGS TFC BRGF Own Funds Funding NREGS Plan TFC BRGF Plans

3 Objective Facilitates the Decentralized Planning process in Local Language by Supporting Need Based Planning rather than Scheme-based planning Facilitating convergence of funds from different central and state sponsored schemes to address the needs of the people Facilitating integration of plans prepared by various planning units into a single district plan document Helping in monitoring the execution of the plan Generating various graphs for analysis and decision support Helping in the preparation of Perspective Plans and deriving the annual draft and action plans from perspective plans

4 Stakeholders Rural Local Bodies Urban Local Bodies
District / State Level Line Departments DPCs / Planning board Citizens State Government Departments Central Government Departments

5 National Informatics Centre

6 PlanPlus Sections Requirement Section Resource Envelope Section
Capturing Information on Wish List, Works(location, proposed cost, proposed duration, asset/beneficiary, output) and Projects Resource Envelope Section Information about Resource Envelope Available with Planning Unit (Perspective Allocation/ Expected Allocation / Actual Allocation) Planning Section Creating Perspective, Annual Draft Plan and Annual Action Plan, Allocating available resources to Prioritized works

7 PlanPlus Sections Technical Appraisal Section
Scrutinize Plans submitted by Planning Units and offer comments on cost, duration and methodology Administrative Approval Section Scrutinize Plans for administrative approval DPC Approval Scrutinize Plans cleared by TAC and accord/endorse approval and integrate it with District Annual Plan – DPC Plan Execution Monitoring Record Execution Details of Works Approved in the Action Plan – Planning Unit Report Section Generate various reports that reflect Plan-Unit wise Plans, Scheme Plans, Physical & Financial Progress etc.

8 Requirement Section Stakeholder – Planning Unit

9 Suggestion Box PlanPlus captures the needs identified through SWOT analysis/Gram Sabha/Ward Sabha or even by individual citizen. These suggestions are forwarded to the planning units The planning units can decide if there is a need to take up the suggested need as a work in any of the Plans National Informatics Centre

10 Suggestion from Citizen

11 Suggestion From a Planning Unit

12 Work Category PlanPlus allows each State to define categories of works
Egs. Include Construction of CC Road, Laying of water pipeline etc. Each work category is associated with a specific work focus area such as roads, drinking water etc. Each work category is mapped to specific outputs

13 National Informatics Centre

14 Mapping of Assets to Work Category
National Informatics Centre

15 Works Planning Process begins with the structuring of unstructured wish-list into structured works by each Planning Unit Work Details include among other parameters the following: Work For - Whether the work is for specific section of the population such as SC, ST, Women etc. Work Focus Area – What is the focus area of the work? The list includes the 29 and 18 functions allocated to Panchayats and urban local bodies under the Constitution. This will help in generating the sectoral plan Estimated Cost Estimated Duration Proposed Output – Asset, Training, Staff Augmentation etc.

16

17 Asset Details

18 National Informatics Centre

19 Capacity Building National Informatics Centre

20 Staff Augmentation National Informatics Centre

21 Project A project is a logical collection of related works, possibly belonging to different sectors A project may have two or more works It is not mandatory for every work to be included in a project Helps in bringing about sectoral integration and ensures maximum impact of the interventions in different sectors National Informatics Centre

22 National Informatics Centre

23 Sources of Funding Stakeholder – Central Govt. /State Govt
Sources of Funding Stakeholder – Central Govt./State Govt. / Local Govt.

24 Sources of Funding Stakeholder
Central Government Departments (CSSs, ACAs etc.) State Government Departments (state government schemes)

25 Sources of Funding The software captures details about various Sources of Funding in the form of Centrally Sponsored Schemes/State Government Schemes Details include inter-alia, Scheme Active Period Geographical Coverage Target Group Component Focus Component Funding Pattern (State-wise and year-wise) Permissible/Non Permissible Activities

26 National Informatics Centre

27

28 National Informatics Centre

29 National Informatics Centre

30 National Informatics Centre

31 Resource Envelope Stakeholder –State Govt.

32 Resource Envelope Plan-unit wise resource envelope can be defined for each Source of Funding Resource envelope corresponds to Allocation under various Central and State Government Schemes (Perspective, Expected and Actual budgetary Allocation) Plan unit’s own funds through taxation and various services

33 Funding Sources Own Funds State Line Department Parastatal Bodies PSUs
BRGF NREGS TFC Funding Sources Parastatal Bodies State Line Department PSUs Central Govt. NREGS BRGF TFC Grants State Govt. SFC Grants-in-aid Assigned Revenues Own Funds Tax Revenues Non-tax revenues Service Delivery

34 Tied & Untied Funds Tied Funds Available through schemes/programmes
Can be used only for purposes for which intended Untied Funds Own Funds Untied grants from Central & State Governments such as Central & State Finance Commission Grants, State Budgetary Allocation and schemes of Central & State Governments (eg., BRGF) Can be used for any purpose Can be used for gap filling along with tied funds and used alone where no funding is available through any schemes

35

36

37

38 Planning Process Stakeholder - Planning Units
Facilitates preparation of Perspective Plan, Draft Annual Plan and Annual Action Plan

39 Planning Cycle Five Year Plan Long Term Perspective Annual
Perspective Plan Five Year Plan Long Term Perspective Draft Annual Plan Annual Based on expected allocation Action Plan Based on budgetary allocation Execution Physical & Financial Progress Details Execution status and learnings

40 Street lighting in Gram Panchayat
Identify Resources Street lighting in Gram Panchayat NRWSP TFC BRGF Own Funds

41 Construction of Water Pipeline
Identify Resources Construction of Water Pipeline NRWSP TFC BRGF

42 Planning A plan would consist of one or more works.
PlanPlus automatically includes all works which have been created for the Plan Year. In addition, it also includes spill-over, on-going and resumed works from previous years’ plans in the current Plan. Based on the sector of the work and that of the component, the software automatically shows the amount of expected allocation under different components of different schemes. The Planning unit can allocate funds from different schemes/components to different works One work may be funded by more than one Source of Funding, thereby converging the funds from different funding sources If any permissible activity is defined under a component, then the planner will have to indicate the activity of the component under which the work is being undertaken.

43 Planning (contd.) Works may be included or excluded from the plan as per availability of funds. However, works which are on-going or spill-over cannot be excluded. Works funding can be shared by multiple Planning Units Priority can be set for each work; fund availability is automatically re- calculated A Planning unit has to answer defined Process Checklist based on scheme components from funds are proposed to be taken up The software also informs the planner about fund availability under different schemes under different sectors thereby ensuring maximum utilization of funds

44 Create Plan

45 Allocation of Funds to Works

46 Collaborative Planning

47 Who is doing what in my Gram Panchayat
What are other planning units planning for my GP? Am I duplicating their efforts? Gram Panchayat District Panchayat Block Panchayat Line Departments Urban Local Bodies Parastatal Bodies Others

48 Can I Collaborate? Can I add value to what others are planning in my GP? Is the other planning unit short of funds? Can I contribute? Am I short of funds? Is any other planning unit willing to contribute? Gram Panchayat Zilla Parishad Panchayat Block Line Department Urban Local Bodies Parastatal Bodies

49 Sharing of Work Funding
Provision to share the cost of Work among different Planning Units Planning Unit can demand the amount from multiple planning units Planning Unit giving the amount can accept/reject the demand Mandatory to freeze the amount if the request for demand is accepted.

50 National Informatics Centre

51 National Informatics Centre

52 Standing Committees Provision to define Plan Unit wise Standing Committees Planning Unit can assign works to the Standing Committee’s Mandatory to assign works to Standing Committee (for both Draft Action Plan and Annual Action Plan) if Standing Committee exist for the Plan Unit.

53 Kerala Planning Workflow

54 Kerala Planning Workflow
Citizens/ NGOs/ Suggest CBOs / Needs/Expectations GramSabhas / Area Sabhas / Planning Units Unstructured wish - list SORs Planning Unit Assign Formulate Projects Prepare Annual Plan ( ULBs & RLBs ) Works to Projects (Prioritization & (Sectoral Integration) (Estimates,time, location etc) source of funding) Forward to TAC Technical Approval Committee Evaluate for Review Technical Scrutiny/ All works approved? (BTAC/DTAC/STAC) Sanction Yes Evaluate for Review DPC All works approved? Administrative Approval Approved Plan Yes National Informatics Centre

55 prepare cost estimates Administrative & Financial Approval
Karnataka Local Body Planning Work Flow Suggest GramSabhas/ Ward Sabhas Needs/Expectations Prioritize RLB/ULB (Standing Committee) Prepare Shelf of works Allocate Funds Line Deptt. Yes Identify More Works Technical Scrutiny Forward (for technical scrutiny & preparation of cost estimates) (AE/EE/CE) Review Evaluate work s & prepare cost estimates All works OK? ZP (General Body) Review Evaluate for Administrative & Financial Approval All works approved? Accord Final Approval DPC Approved Draft Plan

56 General Administrative prepare cost estimates Examine Lower Tier Plan
Rural Local Body WorkFlow – Madhya Pradesh Suggest GramSabhas/ Ward Sabhas Needs/Expectations RLB (Standing Committee / General Administrative Committee) Prioritize Prepare Shelf of works Allocate Funds Forward (for technical scrutiny & preparation of cost estimates) Technical Scrutiny Review Evaluate work s & prepare cost estimates All works OK? Forward Own Plan along with lower tier Plan, if any Higher Tier (JP/ZP) Examine Lower Tier Plan Prepare Own Plan Forward all RLB Plans Accord Final Approval DPC Approved Draft Plan

57 prepare cost estimates
Urban Local Body WorkFlow – Madhya Pradesh Suggest GramSabhas/ Ward Sabhas Needs/Expectations ULB (Standing Committee) Prioritize Prepare Shelf of works Allocate Funds Forward (for technical scrutiny & preparation of cost estimates) Technical Scrutiny Review Evaluate work s & prepare cost estimates All works OK? Accord Final Approval DPC Approved Draft Plan

58 Gram Panchayat WorkFlow – Orissa
Suggest Needs/ Expectations Palli Sabhas Gram Panchayat Prepare Shelf of works Prioritize Allocate Funds Forward (for technical scrutiny & preparation of cost estimates) JE(Block)/ AE(Block) (Technical Approval) Evaluate work s & prepare cost estimates OK Sarpanch/Gram Panchayat (Administrative Approval) Accord Adm. Approval) Review All works OK? Forward Panchayat Samiti Forward GP Plan Zilla Parishad Forward GP Plan DPC Accord Final Approval Approved Draft Plan

59 Panchayat Samiti WorkFlow – Orissa
Suggest Needs/ Expectations Citizen Body Panchayat Samiti Prepare Shelf of works Prioritize Allocate Funds Forward (for technical scrutiny & preparation of cost estimates) JE(Block)/ AE(Block) / EE(DRDA)/ SE(PR Dept.) (Technical Approval) Evaluate work s & prepare cost estimates OK BDO/ PS, Chairman/ Collector Accord Adm. Approval) Review All works OK? Forward Zilla Parishad Forward PS Plan DPC Accord Final Approval Approved Draft Plan

60 Zilla Parishad WorkFlow – Orissa
Suggest Needs/ Expectations Citizen Body Zilla Parishad Prepare Shelf of works Prioritize Allocate Funds Forward (for technical scrutiny & preparation of cost estimates) JE/ AE/ EE/ SE(PR Dept.) (Technical Approval) Evaluate work s & prepare cost estimates OK Secretary, ZP/ Exec. Officer, ZP/ CEO, ZP (Administrative Approval) Accord Adm. Approval) Review All works OK? DPC Accord Final Approval Approved Draft Plan

61 Planning Workflow in PlanPlus
Captures the plan unit wise, state-specific work flows as defined by the State Planning Department. The Plan is routed to various stakeholders as per the defined workflow. Different Workflows can be defined for Draft Annual Plan and Annual Action Plan Versions of the workflow are maintained to ensure consistency in legacy plans.

62 Technical Scrutiny Scrutinize Plans submitted by Planning Units and offer comments on cost, duration and methodology Once an optimal Plan has been prepared by a planning unit, it may get forwarded for technical clearance At the time of technical clearance, the Plan may be forwarded to more than one approving entity based on the sector and cost of the work. The Plan is returned back to the Planning Unit if any work requires modification to meet technical (for eg., revision of cost estimates) The Planning Unit must modify as per the clearance requirement and forward it back for clearance If all works are cleared, the Plan is forwarded to the next level as defined in the process flow of the planning unit.

63 Administrative Approval
At different stages of planning process, administrative approval may be required at different levels. The privilege for administrative approval can be given to a user for one or more planning units Based on the workflow, the plan of the planning unit will be automatically forwarded to the approving authority

64 National Informatics Centre

65 DPC Approval Review and Consolidate the plans of local bodies in view of district priorities Accord clearance for the plans of each planning unit in the district after examining the plans in a holistic manner Generate the District plan - DPC

66 Plan Review/Consolidation by DPC
The DPC can generate sectoral views of the Plan (to be reviewed by sectoral committees) and take decisions (scrutinise, review and approve) on each work included in the Plan The DPC can either approve a Plan (if all works are approved) or return the Plan to the planning unit for review/modification The DPC can look at the plan unit wise plan report which provides a detailed analysis of the Plan of the selected planning unit

67 Records Execution of Works Approved in the Plan
Planning Execution Records Execution of Works Approved in the Plan National Informatics Centre

68 Plan Execution Planning Unit can Record Execution of Works Approved in the Action Plan Frequency of Recording is event-based Expenditure on the Work can be recorded Component Wise Work-wise outputs to be Achieved can recorded

69 Fund Receipt Details

70 Work Execution Status

71 Expenditure Details

72 Physical Progress

73

74

75

76

77

78

79 Reports Annual Plan of respective Plan Units Integrated District Plan
History of the Plan as it goes through the cycle of revisions Status of approval of different works Expected Fund utilization Sectoral Plan Scheme Plan Sectorwise Scheme plan and vice versa Sectorwise BRGF allocation Gap filling by BRGF

80 National Informatics Centre

81 National Informatics Centre

82 National Informatics Centre

83 Plan Unit Report

84 District Plan Report Template
National Informatics Centre

85 District Plan Report National Informatics Centre

86 District Plan Document
Anatapur, Andhra Pradesh Dhenkanal, Orissa

87 Customizing PlanPlus PlanPlus is a highly generic software making it easy to customize it to specific requirements Provides complete local language support in UNICODE Captures the state-specific workflows as defined by the State Planning Department Can be easily extended to facilitate the preparation of state and central government plans. Is web-based but can be installed locally also Based on Open source tools and technologies National Informatics Centre

88 Capacity Building No. of trainings – 4 No. of people trained - 172
National Workshops No. of trainings – 4 No. of people trained - 172 State Level No. of trainings – 88 No. of people trained District Level Trainings No. of trainings – 292 No. of people trained – 7820 Total Trainings No. of trainings – 386 No. of people trained – 10526

89 Capacity Building Workshops No. of Workshops
Total No. of People Trained National Level 4 172 State Level 88 2534 District Level 292 7820 Total 386 10526 Training Details available at Demo Site for hands-on available at Computer Based Tutorial (CBT) available both online as well as for download from both demo as well as actual site

90 Implementation Status
Plan Year No. of District Plans Total No. of Approved Plans No. of BRGF Planning Units adopted Planplus. 37 21344 34612 66 35512 53952 63 38583 57249

91 Thank You


Download ppt "PlanPlus (http://planningonline.gov.in)"