Download presentation
Presentation is loading. Please wait.
1
Network evolving 2020 and beyond
Bruno Hoeft / DE-KIT
2
Status and development of X-WiN
pre-GDB – Networking, 10st January Bruno Hoeft
3
IP-Plattform 2016 pre-GDB – Networking, 10st January Bruno Hoeft
4
Connection of big clients (2016)
pre-GDB – Networking, 10st January Bruno Hoeft
5
Connection of big clients (2016)
UNI FREIBURG pre-GDB – Networking, 10st January Bruno Hoeft
6
Außenanbindungen 2016 pre-GDB – Networking, 10st January Bruno Hoeft
7
further Development Generally Fibre platform
Development of X-WiN is carried out on economical criteria New services and technologies must be financed by allocation of costs Considerable network upgrade realised between 2012 and 2016 Fibre platform No significant changes expected before 2025 Optical platform and IP-platform Adoption of 400Gbps and 1 Tbps is expected External peering will be upgraded (GÉANT, Peering) accordingly Deployment of SDN, currently too indistinct, might be consider in future (under observation) DoS-Mitigation at IP-platform is an important DFN-Service Deployment of new aggregation platform planed in 2017 (router at PoP) pre-GDB – Networking, 10st January Bruno Hoeft
8
shared LHCONE + Internet
DE-KIT WAN CERN (T0) FR-CCIN2P3 (T1) IT-INFN-CNAF (T1) NL-T1 (T1) Poland (T2) FZU (Prague) (T2) LHCOPN Current 2 X 10Gbps upgrade planned to 4 x 10Gbps or even higher capacity shared LHCONE + Internet Current 2 X 50Gbps upgrade to 2 X 100Gbps higher upgrade will require deployment changes pre-GDB – Networking, 10st January Bruno Hoeft
9
Network of DE-KIT 2017 DE-KIT local: Storage Workernode
WAN DE-KIT local: Storage multiple 100G connections to the Storage Possibility of Scalable upgrade Workernode Each WN 10Gbps each rack connected with a max. overprovitioning of 1:2 R-ig-I CERN R-ig-II R-grid2 R-grid145 FS R-grid6 … R-grid3 FS 10 Gbps 40 Gbps 100 Gbps Bruno Hoeft
10
summary DFN DE-KIT / GridKa
Conservative approach (routed supper core network) Throughput upgrade as required (and costs covered) DE-KIT / GridKa Local Storage multiple 100G Connections + scalable upgrade Workernodes max overprovitioning of 1:2 LHCOPN 2*10Gbps current Upgrade planned LHCONE 2*100Gbps physical Upgradable to required capacity Point-2-Point to supplement LHCONE routed VRF with bandwidth garantied p2p connection of dedicated big WLCG centers Leave LHCOPN in place surved LHC well may be upgrades as required Extend LHCONE include sites as required and upgrade to apropriate capacity Supplement LHCONE with p2p links between dedicated „big“ WLCG centers Sites shall keep the focus on deploying their lan capacities and wlcg services pre-GDB – Networking, 10st January Bruno Hoeft
11
Network evolving 2020 and beyond
thanks for your attention ? Questions Network evolving 2020 and beyond Bruno Hoeft / DE-KIT
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.