SWIMMING POOLS CONSTRUCTED AND REPAIRED
DDS SWIMMING POOLS CONSTRUCTED AND REPAIRED ALL COMPLETE CONSTRUCTION WORK GUARANTEED
2
POOL REPAIR AND REMODELLING
Remove tiles Repair pool Re-model steps Fibreglass
3
REMOVE TILES TO LOCATE PROBLEM
5
WATER SEEPS BEHIND TILES AND CAUSES EROSION
7
HOLES FORM AND THE POOL LOSES LARGE AMOUNTS OF WATER DAILY
8
ALL TILES REMOVED READY TO RE-SKIM
13
STEPS ARE RE-SHAPED
15
SKIMMED AND READY FOR THE TILE BAND
17
TILE TOP EDGE NOW COMPLETE READY TO FIBREGLASS
18
FIBREGLASS ON THE WALLS BEGIN
19
FIBREGLASSING THE WALLS AND FLOOR
21
POOL COMPLETED AND FILLED WITH WATER
26
Complete new build TAKE APPROXIMATELY WEEKS FROM START TO FINISH DEPENDING ON SIZE AND SHAPE OF POOL REQUIRED
27
Ground dug out ready for block work
28
Outer block wall constructed
29
Inner block wall with steel rod reinforcement
30
Pool and steps rendered
31
Tile top edge
32
Fibre work begins on walls and steps
34
Fibre work complete
35
Pool finished and ready for water
36
Pool full of water Diving board fitted
38
Fibreglass over tiles – pool repair
39
This process is used when customers have a leak in their pool floor/walls but do not want to remove tiles.
49
PLEASE SPEAK TO US. WE OFFER FREE ADVICE ON THE CONSTRUCTION, REPAIR AND MAINTENANCE OF SWIMMING POOLS.
50
WE CAN ALSO DESIGN AND CONSTRUCT YOUR PATIOS AND BANTABAS FOR OUTSIDE LIVING