Continuing Professional Marine Engineering Services
Town of Ponce Inlet
2
HISTORY OF THE FIRM Calvin, Giordano & Associates, Inc.
We are a well-established multi-disciplinary firm that has been located in South Florida for 80 years. Since 1937, the company has grown from a small, two-person surveying firm to over 360 employees, providing 25+ municipal services. Municipal/Agency Experience (not limited to): Town of Bay Harbor Islands, FL City of Dania Beach, FL City of Pembroke Pines, FL Town of Medley, FL City of Delray Beach, FL City of Tamarac, FL Town of Surfside, FL City of Fort Lauderdale, FL City of West Palm Beach, FL Village of Key Biscayne City of Greenacres, FL City of Weston, FL City of Homestead, FL City of Hallandale Beach, FL Monroe County, FL City of Miami Gardens, FL City of Hollywood, FL South Broward Drainage District, FL City of Sunny Isles Beach, FL City of Lauderdale Lakes, FL Town of Davie, FL City of Key West, FL City of Lauderhill, FL Town of Lake Park, FL City of Marathon, FL City of Miramar, FL Town of Mangonia Park, FL City of Boca Raton City of North Lauderdale, FL Town of Palm Beach City of Cooper City, FL City of Oakland Park, FL City of Coral Springs, FL City of Pahokee, FL
3
ORGANIZATIONAL CHART
4
SCOPE OF WORK To provide turn-key services professional services for the analysis of existing and proposed amenities that are being exposed to an aggressive marine environment. To include analysis, procuring funding sources, permitting, design, project management and construction administration. Dredging & Marine Design & Permitting Site Development Improvements Seawall Design & Constriction Administration Boat Ramp, Floating Dock & Similar Projects Ability to Obtain Grant Funding Other as Required 8 miles of tidally influenced shoreline within Town limits including both private & publically maintained. Array of marinas, public & private boat ramps, parks, floating docks, private & commercial docks.
5
Core team members and experience
Chris giordano, msc, ccm, Director of Management Services EXPERIENCE THAT COUNTS Chris gained his marine experience directly after college working in the field and office for a marine construction firm and continues his marine experience at CGA. Licensed Marine Contractor & Certified Construction Manager Project Take-offs, Plan QA/QC, Project Estimating & Project Management. Gained irreplaceable real world experience Worked directly with permitting agencies for kick offs, permit mods, permit adherence and permit close outs. Completed over $200 Million in municipal marine work; mostly dredging. New Smyrna Beach Emergency Dune Restoration Dredging & Renourishment MSA 434/434C Reconstruction Sunny Isles Beach Pier 12 Years of Experience Education: BSEET, Electrical Engineering Technology, Concentration on Computer Systems. University of Central Florida, 2005
6
Core team members and experience
DAVID FRODSHAM, PE, Project Manager PROJECT EXPERIENCE David is a licensed Professional Engineer at CGA with 9 years of experience in coastal/marine engineering performing Design, Permitting, and Construction Administration Seawall Assessment, Design, Permitting & Construction Administration Grant Acquisition for Marine Projects through FDEP, Florida Inland Navigation District, Community Block Development Grant Programs Permitting experience through USACE, SJRWMD, FDEP & Local Municipalities Boat Ramp & Marina Layout & Design Emergency Response Engineering & Permitting Coastal Assessments & Plume Modeling Overseas coastal work in Panama, Bahamas & Caymans 9 Years of Experience Education: B.S., Civil Engineering Penn State University 2005 M.S., Engineering Management University of Louisville 2009
7
Core team members and experience
SANDRA LEE, AICP CEP, LEED AP BC+D, CFM Director, Environmental PROJECT EXPERIENCE Over 20 years of experience with environmental projects, permitting & design. MA Biology/Ecology BA Biology/Botany, Magna Cum Laude Florida DEP Qualified Stormwater Inspector Association of Floodplain Managers No. US-07579 LEED AP BC+D AICP No 20 Years of Experience Education: M.A. Biology/Ecology, Magna Cum Laude St. Cloud State University, Minnesota B.A. Biology/Botany,
8
Core team members and experience
Jason evert, m.s. Senior marine scientist/project manager PROJECT EXPERIENCE Over 20 years of experience with marine related projects. MS Zoology BS Biology, Cum Laude Rosgen Level I – Applied Fluvial Geomorphology Florida DEP Qualified Stormwater Inspector Associated Fisheries Professional Member North American Sturgeon & Paddlefish Society Corporate Member, Society of American Military Engineers 20 Years of Experience Education: M.S. Zoology, University of Florida, 1999 B.S. Biology, Hope College, cum laude, 1993
9
Core team members and experience
Melisa reiter, PWS senior environmental scientist PROJECT EXPERIENCE Over 27 years of experience with marine related projects. BS Marine Science Richard Chinn Wetland Delineation Course SCS Hydric Soils Training – SWFWMD FDEP Qualified Stormwater Management Inspector Society of Wetland Scientists National Association of Environmental Professionals Ecological Society of America 27 Years of Experience Education: B.S. Marine Science, Eckerd College
10
QUALIFICATIONS AND EXPERIENCE
Sunny Isles Beach Pier Pier design, permitting, funding, CEI & project management Surfside Seawall Replacement (I&II) Grant funding acquisition, Project design, permitting, funding, construction administration & project management Sunny Isles Beach Seawall Replacement Project design, permitting, funding, construction administration & project management New Smyrna Beach Emergency Dune Permit modification & project management Church Creek Dredging Dredge design and permitting for City along residential area McKay Creek Channel Improvements Dredge Design and Permitting for County. CEI related issues – seawall Bradenton Municipal Marina Marina design, wavebreak, regulatory permitting and long term monitoring
11
SIMILAR PROJECT EXPERIENCE
Town of Surfside Replacement of 10 Seawalls Our team began by providing the client with a complete Town-Owned seawall assessment. The assessment was provided to Town Staff, Town Council and FIND and garnered approval for replacement of all Town-Owned Seawalls with a full FIND matching grant. Completed in 2 Phases to accommodate Town budgeting Obtained FIND grants in approximately $1 Million Initial Assessment Design & Permitting Grant Application & Management Construction Administration Project Closeout Phase I Completed 2015 & Phase II Completed 2017 within schedule & budget
12
SIMILAR PROJECT EXPERIENCE
Sunny Isles Beach Emergency Seawall Replacement Our Team received a call regarding a failed seawall and coordinated a same-day onsite meeting with the required permitting agencies, our team, the City and contractors. Expedited permitting due to failed seawall 669 linear feet replaced with minimal interruptions to adjacent park Damage Assessment; Noting areas of Upland Concern Permitting Design Project Management Permit & Project Closeout Project Completed 2016 within schedule & budget
13
SIMILAR PROJECT EXPERIENCE
City of Fort Pierce Jetty Park Improvement Project Our team was selected to provide services for the completion of the Jetty Inlet Park Improvements. The improvements consisted of parking, sidewalk, drainage, lighting signage, landscape & irrigation. Managed Multiple Funding Sources Including LAP Construction Engineering & Inspection (CEI) Managed Permit and Funding Project Requirements Contract Administration Project & Permit Close-out
14
SIMILAR PROJECT EXPERIENCE
City of Sunny Isles Beach North Bay Road Bridge Our Team was contacted to take this project over mid-design & permitting. We were able to get the project back on track, complete the design, work through land ownership issues, obtain permits and execute a contract for construction. Complete Design of Bridge Including Adjacent Civil Design Obtain Permits (City, State, County & Federal) Work with City Attorney on Land Ownership Issues Managing Bidding Process and Negotiate Construction Contract. Construction Engineering & Inspection (CEI) Construction Administration & Oversight Project Currently On Schedule to Complete On Time and Within Budget
15
SIMILAR PROJECT EXPERIENCE
City of Riviera Beach Marina District Development CGA provided coastal, utility and drainage improvements for a 20 acre CRA revitalization of Riviera Beach’s Marina District, including: New Marina Events Center Design of 48” outfall pipes and tieback modifications to seawall Lighting permitting through FFWCC Environmental permitting through SFWMD Permeable paver & exfiltration for dry retention Credit for offsite drainage for additional 20 acre improvements to spur business growth
16
SIMILAR PROJECT EXPERIENCE
City of Miami Beach Middle Beach Recreation Corridor We were chosen by the City to design, permit and construction an on grade ADA-accessible pathway that will support the use of bicycles, walking and other non-motorized modes of transportation. The path will connect two existing beach features with a 4 mile paver walkway. Landscape Architecture & Design Electrical Engineering & Design Environmental Permitting (City, State, County & Federal) Construction Administration Project & Permit Close-out
17
SIMILAR PROJECT EXPERIENCE
City of Dania Beach Cove Park Improvements Design of a waterfront park on an archeologically significant site along the navigable Dania Cut Off Canal which required shoreline stabilization as an integral part of the park design. Environmental Planning Environmental & Construction Permitting Civil Engineering Surveying Construction Administration Project Close Out
18
PROJECT EXPERIENCE Boat Ramps & Floating Docks
Freddy Patrick Park in Port Canaveral George English Park in Fort Lauderdale NOTU Naval Area in Port Canaveral Marinas Southpoint Marina Northpoint Marina Courtesy Dock
19
SIMILAR PROJECT EXPERIENCE
Sun West Park – Pasco County, Florida Ms. Reiter was environmental manager responsible for regulatory permitting and design for coastal park, including boat launch facilities, kayaking trails, parking areas, fishing pier, temporary docking, swimming beaches, and interpretive nature/recreational trails. On-site mitigation area design included seagrass transplanted areas, macroalgae and marsh plants. This project directly impacted a total area of wetlands and aquatic resources of 27.4 acres of submerged aquatic resources associated with channel improvements. The project was approved by the Board of Trustees (Governor and Cabinet). The project included new navigational channel dredging along with a significant amount of seagrass impacts. The complex mitigation plan included seagrass habitat creation, estuarine wetland restoration, freshwater mitigation and the redesign/resuse of old limestone mine pits. The park design included the following components: Expand the use of an existing dredge channel, add one boat ramp with 7 lanes, 250 car/trailer parking spaces, manatee observation tower with educational kiosks, interpretive nature trail, and swimming beach. SunWest park is the largest new navigational channel project ever reviewed by the FDEP Southwest District.
20
JMT Personnel Dredge Experience
Dredge Design and Permitting: Church Creek Dredging - City of Largo McKay Creek Channel Improvements - Pinellas County Sunwest Channel - Pasco County Mobel Americana Homeowners Association Pasadena Yacht Club Homeport Marina Harbor Walk Residential Development Santa Rosa Residential Development Bradenton Municipal Marina Internal Support for FDEP JCP Permitting (Key West Channel) NEPA and Feasibility: Charleston Harbor Port Everglades Harbor Lake Worth Inlet Hernando Beach navigation channel USCG Fort Macon Port of Pascagoula Port of Palm Beach Feasibility Study Port Manatee Feasibility Study - Master Plan
21
WHY CHOOSE THE CGA TEAM? Meets or Exceeds all RFP Requirements
Niche Size with a Family Run 360 Employee Firm Big firm financial & insurance capabilities with small firm customer service and attention Real World Constructability Experience in the Immediate Area New Smyrna Beach MSA 434/434C Halifax Harbor North & South Licensed & Experienced Engineers, Scientists & Marine Contractor on our Team Proven Ability to Obtain Grant Funds History of Repeat, Satisfied Customers with Projects That Were On-Time & Within Budget
22
QUESTIONS?