Download presentation
Presentation is loading. Please wait.
1
Operation Restore Griffon
RIMPAC 2014 CTG 17.2 Operation Restore Griffon
2
Fleet Survey Team CONOP
Mission Statement: Conduct underwater survey of approaches and channel to Oyster Bay. Scheme of Manuever Phase 1: Deploy (NLT 10 JUL) Phase 2: Arrival and establish C2 Phase 3: Survey Operations Priority 1: Channel Priority 2: Pier Assessment Phase 4: Redeploy/ re-task COMMS Plan: P: UHF radio A: Iridium C: Marine Band E: Cell (Degraded) LOG Plan 5x PAX 2x Pallet positions (2x Jet Ski) Survey Area: 2.4 sq km Estimate: 48 hours to complete Initial data delivered in 24 hours Requirements: Unit requires FP assets (CTG 17.3) CTF 17 will provide berthing/ provisions/fuel, airlift
3
Fleet Survey Team
4
Diving Survey CONOP Mission Statement:
Conduct underwater assessment of pier and berthing area. Scheme of Manuever Phase 1: Deploy (NLT 10 JUL) Phase 2: Arrival and establish C2 Phase 3: Diving Operations Pier assessment Under water Construction Team (UCT-2) Salvage assessment (MDS Co 1-8) Phase 4: Redeploy/ re-task COMMS Plan: P: UHF radio A: Iridium C: Marine Band E: Cell (Degraded) LOG Plan 8x PAX Mobile Diving and Salvage (MDS Co 1-8) 6x PAX (UCT-2) 3x Pallet positions (SCUBA gear) Survey Area: 2x Identified wrecks in channel Salvage survey only 7x damaged piers Inspection only Requirements: Unit requires FP assets (CTG 17.3) CTF 17 will provide berthing/ provisions/fuel, airlift
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.