Presentation is loading. Please wait.

Presentation is loading. Please wait.

REACTIVE POWER MANAGEMENT IN SOUTHERN GRID

Similar presentations


Presentation on theme: "REACTIVE POWER MANAGEMENT IN SOUTHERN GRID"— Presentation transcript:

1 REACTIVE POWER MANAGEMENT IN SOUTHERN GRID

2 OVERVOLTAGE PHENOMENON IN SOUTHERN REGION GRID

3 OVERVOLTAGE PHENOMENON IN SOUTHERN GRID
RESOURCES REACTORS (LINE AND BUS) MORE DETAILS TRANSFORMER TAPS CAPACITORS GENERATORS SYNCHRONOUS CONDENSORS CAPABILITY CURVES DROPPING LINES ON O/V LOSS IMPLICATIONS SWITCHABLE LINE REACTORS IMPACT OF LOW FAULT LEVEL OFF PEAK AND PEAK FAULT LEVELS LOW UNIT COMMITMENT IN OFF-PEAK OUT OF 10,500 MW HYDRO – ONLY 500 MW AT OFF PEAK OUT OF 85 UNITS > 50 MW:- HARDLY 6-8 RUN AT OFF-PEAK SC/POWER HANDLED RATIO KOLAR FILTER REACTIVE ENERGY LOW VOLTAGE REACTIVE ENERGY HIGH VOLTAGE REACTIVE ENERGY BALANCE

4 VOLTAGE SCROLL GRAPHS MAY 2004 APR 2004 MAR 2004 FEB 2004 JAN 2004
REACTIVE ENERGY SETTLEMENT RING MAIN SCHEME KOODANKULAM SCHEME VOLTAGE SCROLL GRAPHS MAY 2004 APR 2004 MAR 2004 FEB 2004 JAN 2004 DEC 2003 NOV 2003 OCT 2003 SEPT 2003 AUG 2003 JULY 2003 JUNE 2003 MAY 2003 APR 2003 MAR 2003

5 ICT TAP POSITION AS ON 02 - JULY - 04

6 REACTIVE ENERGY DRAWAL DURING LOW VOLTAGE CONDITION
June-04 In Mvarh

7 REACTIVE ENERGY DRAWAL DURING HIGH VOLTAGE CONDITION
June-04 In Mvarh

8 KOLAR FILTER OPERATION WITH RESPECT TO POWER FLOW

9 UTILISATION OF KADAMPARAI PUMP STORAGE SCHEME:
ENERGY IN MUs 2000 2001 2002 2003 2004 GENERATOR MODE PUMP MODE JAN 4 7 18 39 38 44 58 FEB 6 15 14 46 21 MAR 3 32 51 APR 9 35 40 26 MAY 1 37 43 41 48 JUN 29 45 55 JUL 25 28 47 49 AUG 42 54 SEP 11 36 OCT 20 19 NOV 17  23 24  DEC  49 53  TOTAL 179 143 130 446 507 193 215

10 CITY RING MAIN SCHEMES

11 CITY RING MAIN NETWORK BANGALORE CITY RING MAIN IN PLACE
CHENNAI RING MAIN PLANNED HYDERABAD-SECUNDERABAD TWO 400 KV STATIONS AT PRESENT THIRD TOUCH POINT AND RING MAIN TO BE PLANNED TRIVANDRUM PRESENTLY A SINGLE TOUCH POINT --UNDER CONSTRUCTION

12 BANGALORE 400 KV RING MAIN FROM GOOTY KOLAR NELAMANGALA HOODY
SOMANAHALLI

13 CHENNAI RING MAIN TO NELLORE TO CHITOOR ALMATHI SRIPERUMBUDUR TO KOLAR
MELKOTTAIYUR

14 KOODANKULAM SCHEME

15 KOODANKULAM EVACUATION
400 KV D/C QUAD LINE TO TIRUNELVELI 2nd 400 KV D/C QUAD TO TIRUNELVELI ON SEPARATE ROUTE LILO OF 400 KV D/C TIRUNELVELI 400 KV D/C TIRUNELVELI-UDUMALPET LINE 400 KV D/C TIRUNELVELI-COCHIN-THRISSUR LINE 400 KV D/C TIRUNELVELI-EDAMON LINE 400 KV D/C TIRUNELVELI-COCHIN-THRISSUR LINE AND THE 400 KV D/C TIRUNELVELI-EDAMON LINE WOULD BE ON THE SAME MULTI-CIRCUIT TOWER USING ROW OF EXISTING 220 KV EDAMON-KAYATHAR LINE. 400 KV D/C TIRUNELVELI-EDAMON LINE TO BE CHARGED AT 220 KV INITIALLY. 400 KV D/C TIRUNELVELI-EDAMON LINE WOULD LATER BE EXTENDED TO TRIVANDRUM

16 MULTI-CIRCUIT TOWER ON 220 KV EDAMON-KAYATHAR CORRIDOR
NLMNG CHITOOR KOLAR HOODY ALMATHI HASSAN SP-BUDUR S’HALLI HOSUR MELKOTTAIYUR MYSORE BAHOOR KOZHIKODE SALEM NEYVELI ARASUR NLY-EXP PUGALUR JAYAMKONDAM THRISSUR UDUMALPET TRICHY KARAIKUDI COCHIN MADURAI MULTI-CIRCUIT TOWER ON 220 KV EDAMON-KAYATHAR CORRIDOR EDAMON KOODANKULAM TRANSMISSION SYSTEM AS APPROVED IN 17TH STANDING COMMITTEE MEETING HELD AT BANGALORE IN SEP03 TIRUNELVELI TRIVANDRUM KOODANKULAM

17

18 AC Harmonic Filters - Kolar
Total MVAR: 1701 Cap.

19 Salient Features Rectifier Talcher, Orissa Inverter Kolar, Karnataka
Distance  1400 km Rated Power MW Operating Voltage 500 kV DC Reduced Voltage 400 kV DC Overload Two Hour, 50C 1.1 pu per pole Two Hour, 33C pu per pole Half an hour, 50/33C 1.2/1.3 pu per pole Five Seconds pu per pole

20 SHORT CKT LEVEL

21 ICT TAP POSITION AS ON 04 - JUNE - 04

22 GENERATORS ON SYNCH CONDENSOR MODE: ADVANTAGES
IMPROVED SHORT CIRCUIT LEVELS CAN BE CONVERTED TO GENERATOR MODE IN SHORT NOTICE EXCELLENT REACTIVE SOURCE REDUCED LOSSES CONTROL VOLTAGE FLUCTUATIONS NEXT: IDUKKI 3 QUADRANT OPN

23 NEXT: GENERATORS ON SYNCH CONDENSOR
3 QUADRANT OPERATION MW MVAR NEXT: GENERATORS ON SYNCH CONDENSOR

24 SYNCHRONOUS CONDENSOR OPERATION: IN OPERATION
S. No Name of the Generator Unit No Installed capacity (In MW) Remarks 1 N'Sagar 2 100 Running 3 4 5 6 7 SriSailam LBPH 150 Tested 8 9 10 11 12 Iddukki 130 13 14 NEXT: SYNCH COND POSSIBLE AT

25 SYNCHRONOUS CONDENSOR OPERATION: POSSIBLE AT
SL.NO. POWER STATION INSTALLED CAPACITY TYPE OF SCHEME TYPE OF TURBINE 1 SHARAVATHI 10x103.5 1035 S V.PELTON 2 JOG 4x18+4x12 120 3 VARAHI 2x115 230 4 KUTTIADI 3x25 75 PELTON 5 KUTTIADI EXTENTION 1x50 50 6 PALLIVASAL 3x7.5+3x4 37.5 7 SENGULAM 4x12 48 R 8 SABARIGIRI 6x50 300 9 IDUKKI 3x130+3x130 780 PEPPARA PELTON 10 S 3 3

26 PRICE SIGNALS- GENERATORS BOXED UP IN SR:- MAY04
POWER STATION STATE CAPACITY(MW) FUEL OUT FROM TATA DIESEL KARNATAKA 79 DIESEL 14-May-04 BELLARY DGPP 27 01-May-04 YELEHANKA DIESEL 128 16-May-04 THANRBHAVI 220 NAPTHA SUB-TOTAL 454 BRAHAMPURAM DPP KERALA 107 18-May-04 BSES 157 KASARGODE PCL 22 KAYAMKULAM 360 646 BASIN BRIDGE TAMIL NADU 120 KUTTALAM 64 13-May-04 P.P.NALLUR 330 514 TOTAL 1614

27 REACTIVE ENERGY BALANCE
3717 KMS OF 400KV LINE IS UNCOMPENSATED 8401 KMS OF LINE IS COMPENSATED 4736 KMS (27 LINES) COMPENSATED AT ONE END ONLY TOTAL LINE CHARGING MVAR MVAR LINE REACTORS:- 53 NOS MVAR BUS REACTORS:- 8 NOS MVAR TOTAL MVAR % COMPENSATION INCL B/R 50 % % COMPENSATION EXCL B/R 40 %

28 REACTIVE POWER BALANCE FOR SR -PEAK

29 REACTIVE POWER BALANCE FOR SR – OFF PEAK

30 SWITCHABLE LINE REACTOR

31 SWITCHABLE LINE REACTOR
NEW (SINCE 1990) SWITCHYARD CONFIGURATION PROVIDES FOR CONVERTING L/R AS B/R THIS BECOMES USEFUL DURING SYSTEM RESTORSTION CONTROLLING HIGH VOLTAGE THIS CAN BE EXTENDED TO OTHER S/Y’s MORE FLEXIBILITY DURING RESTORATION

32 LINE REAC AS BUS REAC POSSIBLE @
NSR - BOTH ENDS GTY - BLR @ BOTH ENDS GZK - BOTH ENDS GZK – BOTH ENDS NNA - BOTH ENDS– BOTH CKTS RGM KMM RGM – HYD


Download ppt "REACTIVE POWER MANAGEMENT IN SOUTHERN GRID"

Similar presentations


Ads by Google