1 ELCITA UPDATE April 2017

2 Smart City Project Initiatives for Test bed
M/s Velankani (By Design) have provided 50 Nos of 5 MP Cameras. 14 have been installed & the balance installation is in progress.

3 Smart City Project Initiatives for Test bed
58 Nos of Modified Street light poles have been erected on Infosys Avenue & Pump house road.

4 Smart City Project Initiatives for Test bed
2 more Smart Water Meters has been supplied by M/s GAIA integrated with TCL network.

5 Smart City Project Initiatives for Test bed
Environment Sensor Monitoring : Air Quality Temperature Humidity Ambient Light Sound CO2 NO2 (PAQS)Personal Air Quality Systems Pvt Ltd

6 Smart City Project Initiatives for Test bed
M/s Tejas Network have provided Network design for the Pilot ring main from ELCITA office Via Lord Plaza, Paramount, BHEL & back. They are providing GPON switches for all the Camera poles. M/s Multiproe have started the Installation of Video wall at our command Centre. M/s Wipro Ltd are the integrated partner for Smart City Interface.

7 Smart City Project Initiatives for Test bed
M/s P Park E have supplied 20 Nos parking sensors through LORA network & installation work is in progress. TCL have Supplied one LED street light fixture integrated with LORA Network. Configuration of other applications is in progress apart from Switching On & Off.

8 LOCATION MAP FOR RELOCATING SKYWALK FROM HP to ELECTRONICS CITY SIGNAL (from West Phase to East Phase)

9 PROPOSAL FOR RELOCATING SKYWALK FROM HP to ELECTRONICS CITY SIGNAL (from West Phase to East Phase)

10 PROPOSED 400 KLD STP at KSSIDC COMPLEX

11 Estate Management Modification of existing street light poles with LED lights, Splitters, Camera, Advertisement Board, etc West Avenue 1 –Infosys avenue West Avenue 7 – Wipro Neeladri Road West Avenue 8 – Pump house Road West Avenue 9 – Petrol Bunk Road E – Toilets 20 e-toilets Installed & Operational Estate survey Software Training work in progress

12 Footpath – Completed East Avenue 1 (TCS Road) East lane 1(Hical Road)

13 Footpath & Drain Works – Under Progress
West Avenue-9 (Petrol Bunk Road) - Completed West Avenue-8 (Police Station Side)

14 Wet Mix Laying – East Avenue 1
Road Works – Under progress Wet Mix Laying – East Avenue 1

15 Culvert Works – Completed
RCC Culvert opp SYSCON West Avenue 8 RCC Culvert Opp Namtech – West lane 1

16 Footpath Works – Under Progress
RCC drain (XIME)– East Avenue 2 RCC drain (Siemens)– West Avenue 1

17 Fabrication Work– Completed
Barbed Wire Fencing – East Avenue 2 Providing SS Bar screen at Equalization Tank (300 KLD STP)

18 Footpath using Old Kerbstone (Pump House)
Footpath & Drain Works – Under Progress RCC Slab (West lane 1) Footpath using Old Kerbstone (Pump House)

19 Drain & Compound wall Works – Under progress
Drain work– West Lane 12 (Arvind Mills Road) Compound Wall– Pump House

20 Sump Works – Under Progress
3KL Capacity UG Sump for E- Toilet (Below Fly over East Phase) 3KL Capacity UG Sump for E- Toilet (Edizi Tools)

21 Sump Works – Under Progress
3KL Capacity UG Sump for E- Toilet (HP Avenue) 3KL Capacity UG Sump for E- Toilet (BWSSB)

22 Sump Works – Under Progress
3KL Capacity UG Sump for E- Toilet (We school) 3KL Capacity UG Sump for E- Toilet (Tech Mahindra)

23 Road Marking – Completed
Road Side lane, Speed Hump & Pedestrian Marking (Electronics City West & East Phase)

24 Direction Signage Board– Completed

25 Fabrication Work– Under Progress
Providing Chequer Sheet Cover to Avoid Smell going to the nearby companies

26 Construction of 7KLD STP ESBR Technology at ELCITA office
7KLD STP– Under Progress Construction of 7KLD STP ESBR Technology at ELCITA office

27 Jan - 32tons sold Feb - 37 tons sold March - 41 Tons dry waste sold
Improvement in quantity of dry waste sold after Conveyor. Jan - 32tons sold Feb tons sold March - 41 Tons dry waste sold

28 Compost Santhe organised by GoK
Was part of 40 participants at Vidhana Soudha Stall was visited by the chief minister. Sold compost and got contacts for compost sales.

29 Earth day initiatives Seized single use disposables at E-city were used to create awareness around E-city for non usage. Tree plantation at Maragondanahalli lake and also installation of solar lights.

30 Estate Management Contract Awarded
Proposed construction of Drains, laying of Pavers, Kerb stones and Drain cover slabs from Xime Junction to Tata power rear gate & TCS Gate no 2 to Edizi Tools junction (East Avenue 2 & 4), East Phase Providing and laying of Asphalting using 60/70 grade bitumen from Edizi Tools to TCS gate no 3 via Y-Junction, (East Avenue 1& 4). East Phase Along Café Corner & JP IT Park Road

31 Estate Management Contract Published
Modification of existing street light poles with LED lights, Splitters, Camera, Advertisement Board, etc Providing House Keeping Services to ELCITA within e-city Industrial Township Area.

32 Estate Management Contracts on Anvil
Construction of Concrete Drains, laying of Pavers, Kerb stones and Drain cover slabs Erkadi System to Arvind Mills (West Phase) Construction of 400 KLD STP in KSSIDC Land, West Phase. Construction of 500 KLD STP in KIADB Land, East Phase. Replacing the Existing RMU with New Compact RMU near M/s BHEL Ltd.

33 Thank You