Micropiles and self drilling rods in soil and rock engineering
Part 10-2aa Micropiles and self drilling rods in soil and rock engineering V-2009 (rev. XI-2012) (Part 10-2aa, PP 2007, animation+p/r : compr.) Copyright notice Unauthorised copying of this presentation as whole or in parts in any form or by any means, electronic, photocopying, recording or otherwise, without prior written permision is prohibited. ready
2
Example 2: underpinning of cathedral
in Koszalin (Poland) ready
3
Location of the project
ready
4
Köslin (today Koszalin) before “rendez-vous” with Soviet Army in 1945
ready Köslin (today Koszalin) before “rendez-vous” with Soviet Army in 1945
5
Köslin before “rendez-vous” with Soviet Army in 1945
ready
6
Köslin (today Koszalin) in 1945
ready Köslin (today Koszalin) in 1945
7
excavation for catristy Underpinning system with TITAN micropiles
cathedral excavation for catristy ready Underpinning system with TITAN micropiles
8
Excavation for catristy
ready
9
new underground catristy
the cathedral new underground catristy Underpinning system of the cathedral before excavation for new underground catristy – plan ready
10
TITAN – micropiles, anchors and soil nails.
Rotary or rotary - ”light percussive” drilling methods (”slow and low pressure jet-grouting”) Example of self-drilling rods ready
11
TITAN self-drilling rods with sacrificial drill bits
ready
12
final shape of grouted pile body
cement grout final shape of grouted pile body drill rod = pile shaft drill bit cuttings soil TITAN micropile ready
13
performed by Najder engineering (2004)
anchoring plate pile shaft D = 1,54 ddrill TITAN micropile performed by Najder engineering (2004) ready
14
press ready
15
Load transmission to new micropiles – longitudinal concrete beams
cellar street excavation stones (grouted) concrete beam steel bar concrete beam micropile micropile prestressing forces press ready
16
Underpinning system of the cathedral
before excavation for new underground catristy – cross-section press ready
17
Shoring system – “Berlin wall” (details)
ready
18
Lowest part of the brick wall and existing foundation of the cathedral
after local excavation ready
19
Drilling of Titan micropiles outside the cathedral
ready
20
Underpinning system of the cathedral foundation
longitudinal concrete beam prestressed bar inside the plastic casing grouting hose for corrosion protection of the prestressed bar Underpinning system of the cathedral foundation ready
21
top plate on Titan micropile Titan micropile – details
ready
22
Underpinning system of the cathedral foundation – cont.
longitudinal beam prestressed bar inside the plastic casing Underpinning system of the cathedral foundation – cont. ready
23
longitudinal concrete beam prestressed bar Underpinning system of the cathedral foundation – prestressing of GWS bars press ready
24
top plate on Titan micropile
grouting hose for corrosion protection of the prestressed bar prestressed bar inside the plastic casing top plate on Titan micropile Titan micropile Underpinning system of the cathedral foundation (interior of the church) press ready
25
new underground catristy
the cathedral new underground catristy Underpinning system of the cathedral before excavation for new underground catristy – plan ready
26
Secant-pile-wall by Titan micropiles
ready
27
Excavation for the catristy (shoring system of modified “Berlin wall”)
ready
28
Final construction works at the catristy
ready
29
“Catacombs” almost ready
30
The same place in 2011 (11 years later)
ready
31
Thank You for Your attention!
THE END Thank You for Your attention! ready