Calibration: preparation for pa
C. Zampolli Calibration: preparation for pa 07/01/2013 C. Zampolli
2
Calibration strategy – CPass0 + CPass1
Chunk 0 Chunk 1 Chunk N Chunk 0 Chunk 1 Chunk N … … Alien job Alien job Alien job Alien job Alien job Alien job Alien job Alien job OCDB snapshot snapshot reconstruction reconstruction ESDs ESDs Calib. train Calib. train QA train Merging + OCDB entires Merging + OCDB entires 07/01/2013 OCDB Update C. Zampolli OCDB Update
3
Run selection Runs are picked automatically from the logbook, with the following criteria: PHYSICS run, Beam ON, GOOD Data Quality flag, GRP pp in DONE, at least one of SDD, T0, TOF, TPC, TRD, number of kCalibBarrel > 0, data migrated, B field ok If TPC TPC pp in DONE If TRD TRD pp in DONE If SPD SPD pp in DONE (SPD should be always there) GOOD Data Quality flag set online in the ACR Runs should last at least 5 minutes NB. In pp: kCalibBarrel = SPI triggers; kCalibOuter = EMCAL + MUON + PHOS triggers In pA: kCalibBarrel defined differently (see later); kCalibOuter = EMCAL + MUON + PHOS triggers 07/01/2013 C. Zampolli
4
pA During standard data taking: During MB-like data taking:
Using high-multiplicity trigger (20 Hz) Still to be set by Trigger experts; using VZERO During MB-like data taking: Downscaling at reconstruction level, according to: min(max(nevents/10,30000),nevents)/nevents If events <= reconstruct all If events >= reconstruct 10% In between, 30000 No kCalibBarrel defined kCalibOuter kept as now More QA from fast MUON + calorimeters reconstruction (kPhysME) 30000 due to >3x higher multiplicity in pA than pp 30000 events 10% of the statistics 07/01/2013 C. Zampolli
5
Trigger Clusters Data taking will be in the same run with two different partitions: Fast cluster without SDD, AOCRDE, EMCAL, FMD, PHOS, MUON, PMD ALL cluster everybody CENT cluster without MUON, PMD MUON cluster MUON + SPD + SSD (?) + T0 + V0 + ZDC Ken's talk at last PB 07/01/2013 C. Zampolli
6
But… Data taking will be in the same run with two different partitions: Fast cluster without SDD, ACORDE, EMCAL (?), FMD (?), PHOS, MUON, PMD ALL cluster everybody CENT cluster without MUON, PMD MUON cluster MUON + SPD + SSD (?) + T0 + V0 + ZDC Events in these clusters could be used for calibration, but the absence of SDD could bias the results, and SDD might not have enough events Only use ALL + CENT Standard pA kCalibBarrel should not be associated to events from Fast cluster MB data taking dedicated alias as discussed in Since an an event can be read out by two clusters, a sort of “exclusive” selection of aliases is needed (e.g. only ALL, not Fast) Ken's talk at last PB 07/01/2013 C. Zampolli
7
CPass calibration code status
V5-03-Rev-03 should have been the “golden” release Some changes needed, new revision foreseen Detector Status Mean Vertex ok SDD TPC TRD TOF Ok T0 ? No reprocessing possible yet 07/01/2013 C. Zampolli
8
TPC calibration dEdx resolution worsens at high rate (~8%), together with space point distortion (3 sigma) So far, only extrapolation can be done Procedure definition need data For space point distortion, a first workaround could be put in place Require manual calibration after PPass (high-pt trees needed) After that, full calibration chain to be re-run (TPC calibration would change) 07/01/2013 C. Zampolli
9
Current “schedule” Monday 7 Jan, Sunday 13 Jan machine and injectors commissioning Monday 14 Jan setting up for pA 4 days of setup (could even be that they declare STABLE BEAMS) Friday 18 Jan Physics 5-7 days of MB (to accumulate 100M events) Then increase in luminosity, different trigger configuration Monday 11 feb (at 6 am) end of pA, start of pp at low energy Each step depends on the previous one Any delay could have consequences on the next steps! E.g.: any delay this week would make pA shift in time pA vs Ap change of period probably better 07/01/2013 C. Zampolli
10
2012 data – what is left LHC12h LHC12i
VPass started over Christmas; almost completed Run (8740 chunks for ~1.3M of MB events) failed in CPass0 merging (EE) LHC12i CPass reprocessing completed over Christmas (checking a few runs) Manual update window to be opened, QA readiness to be assessed deadline next week, then busy times for pA, so maybe VPass will need to be postponed 07/01/2013 C. Zampolli