MOPC Meeting Oct , 2016 Little Rock, AR

Similar presentations


Presentation on theme: "MOPC Meeting Oct , 2016 Little Rock, AR"— Presentation transcript:

1 MOPC Meeting Oct. 11-12, 2016 Little Rock, AR
SPP RE Update MOPC Meeting Oct , 2016 Little Rock, AR Ron Ciesiel SPP RE General Manager

2 Violations by Year

3 GO/TO Self Certification, Sept. 2016
New standards effective 7/1/16 with phased-in implementation MOD – Verification of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Capability PRC Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls and Protection PRC – Generator Frequency and Voltage Protective Relay Settings 40% of applicable generation units capability tested or settings verified by 7/1/16 Based on each NERC registration e.g. Entity registers one wind farm; it needs to be fully compliant by 7/1/16

4 GO Self Certification, Sept. 2016
71 violations reported as of 9/30/16 MOD-025-2: 30 violations PRC-019-2: 14 violations PRC-024-2: 27 violations Primarily individually registered wind farms Reasons: Did not understand Implementation Plan Arranging outages for testing Awaiting third-party availability for testing

5 Violations Previous Period
Most Violated Standards Based on rolling 12 months through 9/30/16 [Represents ~ 84% of total violations] SPP RE Rank Standard Description Violations Current Period Violations Previous Period Risk Factor 1 MOD-025 Generator Capability Testing 34 +34 Medium 2 PRC-024 Generator Relay Settings (Hz & V) 29 +29 Med./Lower 3* PRC-005 Protection System Maintenance 19 5 +14 High/Med. 4 PRC-019 Generator Regulating Controls 18 +18 5* CIP-007 Systems Security Management 8 16 -8 6* CIP-004 Personnel & Training 7 +3 CIP-005 Electronic Security Perimeters 12 -5 8* VAR-002 Network Voltage Schedules 6 9* FAC-008 Facility Ratings +1 10* CIP-006 Physical Security - Cyber Assets 3 9 -6 All SPP RE Top 10 Total Incoming 136 56 +80 Chart represents most violated standards at SPP RE NERC 2016 Top 10 most violated standards are noted with an asterisk (*) MOD-025-2, PRC-024-2, and PRC include new requirements for Generators effective July 1, MOD also applies to synchronous condensers. Of the violations in the chart, the following came in through SELF-CERTIFICATION: Mod-025 = 30; PRC-019 = 14; and PRC-024 = 27. The violations in the chart are slightly higher because they also include the SELF-REPORTS that came in ahead of the SELF-CERTIFICATION. The current period is the most recent 12 months. The previous period is the previous 12 months. * NERC Top 10

6 VEGETATION CONTACTS REPORTABLE ACTIONABLE NERC Q2-2016 Q3-2015
(Q LAST OFFICIAL REPORT) SPP RE Q Q3-2010 A category 3 outage report was submitted to SPP RE from RF through the MRRE program in 4Q of Category 3 is a fall-in from outside the right-of-way which is reportable, but not a violation. Two other Regions reported Category 1 outages to NERC for 3Q Category 1 is a grow-in from inside the right-of-way which is actionable as a potential violation.

7 SPP RE Regional Events Q3 Through 9/30/16
Two category 1a. Outage of multiple elements One category 1h. EMS Event

8 SPP RE Misoperation Report as of Q2-16

9 Causes of Misoperations Q2-14 to Q2-16

10 Success Rate by Voltage Category

11 Misoperations by Type

12 Risk-Based Compliance
40 Inherent Risk Assessments (IRA) completed Summary report submitted to NERC 4 Internal Control Assessments completed Removed requirements from auditors’ review Reduced sample size Operations & Planning has completed: 3 of 4 on-site audits 14 off-site audits 9 off-site completed IRAs reduced 4 off-site audits to Spot-Checks CIP has complete 3 of 4 on-site V6 audits that began in July

13 Outreach Workshops Trustee Meetings
201 attendees at Fall Workshop in Oklahoma City Oct. 26, Misoperations Summit, Little Rock Mar , Spring 2017 Workshop: Little Rock June 27-28, CIP 2017 Workshop: Little Rock Oct , Fall 2017 Workshop: Dallas Trustee Meetings Jan. 30, 2017: Dallas Apr. 24, 2017: Tulsa July 24, 2017: Denver Oct. 30, 2017: Little Rock

14 New Standards: January 1, 2017
IRO Reliability Coordinator Data Specifications and Collection (Requirements R1 and R2) TOP Operational Reliability Data (all Requirements except R5)

15 New Standards: April 1, 2017 CIP Cyber Security-Security Management Controls (Requirements 1.2-2) CIP – Cyber Security Configuration change Management and Vunerability Assessments (Requirement 4) EOP – Event Reporting EOP — Geomagnetic Disturbance Operations EOP – Emergency Operations FAC – System Operating Limits Methodology for the Planning Horizon

16 New Standards: April 1, 2017 FAC – System Operating Limits Methodology for the Operations Horizon IRO – Reliability Coordination: Responsibilities IRO – Reliability Coordination: Monitoring and Analysis IRO – Reliability Coordinator Operational Analyses and Real-time Assessments IRO – Reliability Coordinator Data Specification and Collection (Requirement R3) IRO – Coordination Among Reliability Coordinators

17 New Standards: April 1, 2017 IRO-017-1 – Outage Coordination
MOD-029-2a – Rated System Path Methodology MOD – Flowgate Methodology PRC – Undervoltage Load Shedding PRC – Remedial Action Scheme Data and Documentation PRC – Remedial Action Scheme Misoperations PRC – Remedial Action Scheme Maintenance and Testing

18 New Standards: April 1, 2017 PRC – Transmission Relay Loadability TOP – Transmission Operations TOP – Operations Planning TOP – Operational Reliability Data (Requirement R5)

19 New Standards: April 2, 2017 PRC-004-5(i) – Protection System Misoperation Identification and Correction PRC – Undervoltage Load Shedding

20 New Standards: July 1, 2017 CIP Cyber Security – Personnel & Training (Requirements 2.3,4.3, 4.4) CIP Cyber Security - Physical Security of BES Cyber Systems (Requirement 3.1) CIP Cyber Security – Incident Reporting and Response Planning (Requirement 2.1) CIP Cyber Security – Recovery Plans for BES Cyber Systems (Requirement ) CIP Cyber Security Configuration Change Management and Vulnerability Assessments (Requirement 3.1)

21 New Standards: July 1, 2017 MOD — Steady-State and Dynamic System Model Validation

22 New Standards: Oct. 1, 2017 None