Major MnDOT Highway Improvement Projects West Metro
March 15, 2017 mndot.gov/metro
2
Overview Overview of three major west metro projects
Highway 169 and Nine Mile Creek Bridge (Golden Valley to Edina) I-94 (Minneapolis to Brooklyn Center) I-35W/Lake Street (Minneapolis) Stay connected with project updates Project contacts 3/15/17 mndot.gov/metro/projects.html
3
3 construction projects in 5 years
Highway 169 & Nine Mile Creek Bridge January-September 2017 I-94 – Minneapolis to Brooklyn Center April 2017-July 2018 I-35W and Lake Street - 15th Street to 43rd Street in Minneapolis August November 2021
4
Highway 169 and Nine Mile Creek Bridge
mndot.gov/metro/projects/hwy169hopkins
5
Highway 169 (Jan.-Oct. 2017) Replace Nine Mile Creek Bridge with causeway Road closed from Bren to 5th/Lincoln for nine months Resurface freeway from Highway 62 to Highway 55 Lane/ramp closures from April-September Close southbound ramp at 16th Street for safety reasons Extend acceleration lanes at Cedar Lake Road
6
Nine Mile Creek Bridge Replacement Project
Causeway: A raised road across a low, wet ground supported by fill rather than piers Replacement will take nine months Bridge suffering from major deterioration because of poor drainage
7
Highway 169 alternate routes
3/15/17 Optional Tagline Goes Here | mndot.gov/
8
I-94 Minneapolis to Brooklyn Center
mndot.gov/metro/projects/i94brooklyncntr
9
I-94 Minneapolis to Brooklyn Center Project Schedule
May through August 2017 I-94 reduced to 2 lanes in each direction between Nicollet Avenue and Highway 55 for under-bridge repairs I-94 will be reduced to 2 (possibly 3) lanes in each direction north of Highway 55 Northbound I-35W to westbound I-94 ramp will be closed. Traffic will be detoured to Highway 62 to northbound Highway 100. 3/15/17 mndot.gov/metro/projects/i94brooklyncntr 10
10
I-94 Minneapolis to Brooklyn Center Project Schedule
In August, anticipated 4 weekend directional closures of I-94 (one direction closed, the other remains open) required for asphalt overlay Some parking under freeway bridges will be restricted for bridge repair Ramp closures throughout the project area required for pavement repair. Closures expected to last 2 weeks. Intermittent lane closures required All lanes, tunnel expected to open by end of 3/15/17 mndot.gov/metro/projects/i94brooklyncntr 11
11
I-94 Lowry Tunnel – Staged Construction
CURRENT Lowry Tunnel traffic in both eastbound and westbound lanes Work begins in eastbound Lowry Tunnel, traffic shifted to westbound lanes Concrete repair and tile replacement in Lowry Tunnel May to August One barrel of tunnel closed for about 3 months total Tunnel reduced to two, 10-foot wide lanes each direction Trucks weighing more than 9,000 pounds prohibited. Detour is Highway 62 west to Highway 100 north I-394 east ramp to I-94 east closed during work on eastbound tunnel. Work begins in westbound Lowry Tunnel, traffic shifted to eastbound lanes *Looking from the north end of the tunnel heading east
12
I-94 West ramp from I-35W North closed
Northbound I-35W to Westbound I-94 ramp will be closed during Lowry Tunnel work. Traffic will be detoured to Highway 62 to northbound Highway 100. Closure is about three months. 3/15/17 | mndot.gov/
13
I-94 West Bridge Repairs in Brooklyn Center
Southbound Highway 252 to Eastbound I-94 and Westbound I-694 to Eastbound I-94 roads closed for about two months. Traffic detoured to Highway 100. 2/7/17 | mndot.gov/
14
mndot.gov/metro/projects/i35wminneapolis
I-35W/Lake Street mndot.gov/metro/projects/i35wminneapolis
15
I-35W/Lake Street Project Vision Development
Project developed as partnership Development has been ongoing during the last 20 plus years Project goals: Enhance transit Enhance accessibility Preserve the existing infrastructure Developed in Partnership with: Hennepin County City of Minneapolis Metro Transit. 3/15/17 mndot.gov/metro/projects/i35wminneapolis 14
16
3/15/17 15
17
I-35W/Lake Street Project Timeline
Project Phase Date Bids opened June 7, 2017 Construction begins August 2017 Construction completed November 2021 Access to I-35W restricted during construction. When SB I-35W is being constructed and traffic is shifted to the NB side of the roadway. All ramps to SB I-35W and from SB I-35W will be closed. Also, the entrance ramps to NB I-35W will be closed. Stage 1 – Fall of 2017 Replace pier on Portland Avenue – up to 8 weeks of closure Replace Franklin Avenue Bridge – October 2017 through June 2018 Close 11th Street Exit ramp from WB I-94 – 8 to 12 Weeks in the fall of 2017 Rehabilitation of 38th Street Bridge. Stage 2 – Major impacts to freeway begin Traffic on I-35W reduced to 5 lanes TH 65 closed 26th, 28th, and 40th Street Bridges Replaced. Stage 3 TH 65 Re-opened – General Purpose NB and Transit and emergency Service SB Reconstruct 31st Street, Stage 4 Complete construction on SB I-35W Traffic 6 lanes on I-35W. Lake Street between 5th Street and Blaisdell Constructed in this stage. Stage 5 Construct NB I-35W from 43rd Street to 26th Street, Complete construction of WB I-94. Complete construction of NB 35W to WB 94 ramp. 3/15/17 mndot.gov/metro/projects/i35wminneapolis 16
18
I-35W/Lake Street Project Construction Schedule
Five construction stages Stage 1: August 2017 to June 2018 Stage 2: April 2018 to November 2018 Stage 3: April 2018 to November 2019 Stage 4: December 2019 to November 2020 Stage 5: December 2020 to November 2021 12/20/16 mndot.gov/metro/projects/i35wminneapolis 17
19
Stay Connected – West Metro 2017 Projects
Project websites and alerts Hwy 169 and Nine Mile Creek Bridge: mndot.gov/metro/projects/hwy169hopkins/index.html I-94 Minneapolis to Brooklyn Center: mndot.gov/metro/projects/i94brooklyncntr/ I-35W/Lake Street: mndot.gov/metro/projects/i35wminneapolis; Project alerts Hwy 169 and Nine Mile Creek Bridge: I-94 Minneapolis to Brooklyn Center: I-35W/Lake Street: mndot.gov/metro/projects.html 18
20
Stay Connected: West Metro 2017 Projects
Social media MnDOT Facebook: MnDOT Twitter: 511 Real-time travel info. anywhere in Minnesota: Traditional media Events and public meetings City and business websites 3/15/17 mndot.gov/metro/projects.html 19
21
MnDOT Contacts Hwy 169 and Nine Mile Creek Bridge
Andrew Lutaya, Project Manager: Dave Aeikens, Communications & Engagement: I-94 Minneapolis to Brooklyn Center Marcell Walker, Project Manager, I-35W/Lake Street Scott Pedersen, Project Manager: Denise Workcuff, Communications & Engagement: 3/15/17 mndot.gov/metro/projects.html 20
22
Major highway & road projects impacting
Downtown Minneapolis from 2017 to 2021
23
Hwy 169: CLOSED NOW - Completed Oct. 2017
Project Timelines Hwy 169: CLOSED NOW - Completed Oct. 2017 I-94 Resurfacing: Construction starts this Monday – Completion spring 2018 I-35W Rebuild: Construction starts late 2017 – Completion Est. 2021 Andrew shared the details of the projects. For a SOV commuter – Single Occupancy Vehicle – this is your worst nightmare! Your 40 minute drive turned into an 1 ½ ! On the bright side – PAIN IS A GREAT MOTIVATOR!
24
160,000 downtown Employees, 40,000 Residents
4 years of freeway construction projects 160,000 downtown Employees, 40,000 Residents Mission: Connect Employers, Commuters & Residents with our Transportation Partners Outreach and Education on Sustainable Options to improve commutes & reduce traffic congestion 4 years of freeway construction is going to impact a lot of people! Currently - Almost 40% of commuters use Transit or Carpooling! Bike commuting increased to 5 percent in Minneapolis, according to the American Community Survey. With the construction PAIN factor , Move Minneapolis is targeting the other 55% who will be more eager for OPTIONS!
25
Transit – Park & Ride, Express Lanes & Shoulders, Metropass
Carpooling – Express Lanes, Discounted Parking, Sharing Costs MNPASS – Pay By Usage, Express Lanes Bicycle Commuting – Expanding Bike Infrastructure & Facilities, Mpls Bicycle Coalition, Nice Ride, ZAP Twin Cities Flextime/Telework – Tool Kit Transit has a big advantage over SOV’s. Buses use Express Lanes and freeway shoulders. The Northstar commuter rail follows the same path as I-94 into downtown. The Blue Line parallels I-35W into Mpls. We are working with more employers to expand the Metropass program for their employees. Offering pre-tax, payroll deduction for a transit pass, AND many employers add a subsidy. We register carpools at Move Minneapolis. Carpoolers use the Express Lane and discounted parking for as little as $20 per month. For getting from the ramp to your office - Carpoolers are even being offered FREE Ramp & Ride downtown transit cards AND Nice Ride memberships! We register MNPASS users with flexible transponders. Pay when you ride alone but use the Express Lane for FREE with a passenger. Commuting downtown by bicycle is getting easier with each added bike lane or protected bikeway. Bike rooms for employees are becoming standard; Xcel Energy, 5th Street Towers, Wells Fargo are just a few of the new employee bike facilities. ZAP Twin Cities is a growing bike commuting incentive program that uses RFID technology to capture metrics, boost health and wellness programs and reward individual riders for biking to work. Finally, Telework eliminates the commute altogether. Working with employers on ways for their employees can get the job done without having to come into the office.
26
Expertise, Resources, Partnerships
Outreach & Education – 160+ Outreach Events Annually Communications – 275,000 Electronic Touches Annually Storefront – 50,000 Face to Face Connections Annually
27
Transportation Management Organization (TMO)
Move Minneapolis Transportation Management Organization (TMO) Moveminneapolis.org
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.