Western States Power Corporation
2
Western States Power Corp.
Total Funding: $660 Million (thru Sept 2016) By Purpose: Capital: $621 Million O&M: $21 Million PP&W: $18 Million
3
Western States Power Corp.
By Agency: WAPA $317 Million Reclamation $190 Million Corps $153 Million
4
Western States Power Corp.
FY 2016: Total Approved: $72.1 Million (without Reprogramming) - $61.8 million in New Funds Western (Reprogrammed Funds) $10.3 Million Reclamation $29.6 Million Corps $32.2 Million
5
Western States Power Corp.
Western-UGP: No New Funding Expected. Total Reprogramming Expected to be Approximately $9 Million Likely Projects for 2017 include Jamestown Control Bldg., Brookings Sub. Stage 9, Towner Sub., Ft. Thompson Crew Bldg., and Newell Transformer Expected to Use Keystone XL Advances or Other Carryover funds from Completed Projects.
6
Western States Power Corp.
Western-RMR: No New Funding Expected for FY Reprogramming Amounts Are Uncertain Construction for Already-Funded Projects Expected to Take Place – Estes-Flatiron 115kV & Granby-Windy Gap 69kV Rebuilds Possible New Projects for Reprogramming – Big George-North Cody Conversion, Alliance Dunlap 115kV Rebuild, and Badwater Reactors – Approx. $10 Million
7
Western States Power Corp.
Bureau of Reclamation: Top Projects for 2017 – Approx. $24 Million Mount Elbert Rehabilitation - $20.2 Million Guernsey Intake Gate Rehab. - $2.7 Million Green Mtn. Penstock Re-line - $310 Thousand (out of $14 million total) Yellowtail Afterbay Sluiceway Re-coat - $381 Thousand
8
Western States Power Corp.
Key Projects – Corps of Engineers: Major Projects for 2017–Approx. $10 Million Gavins Point-Excitation and Governor Upgrades Garrison – Repair Intake Crane/Design Intake Valves Replace Programmable Logic Controllers at Gavins Point/Oahe/Fort Randall Oahe – Intake Motor Controls/Design Outside S.S. Switchgear Fort Randall – Replace Neutral Breakers/Design Intake Crane Replacement
9
Western States Power Corp.
(Continued) Key Projects – Corps of Engineers: Pre-funding in 2017 for Corps Major Rehab. at Fort Randall Powerplant – Approx. $44 Million Design Work Planned for 2017/2018 Major Awards Starting in 2021
10
Western States Power Corp.
(Continued) Key Projects – Corps of Engineers: Total Funding Request- FY $54 Million Meeting on July 25th in Sioux Falls with Corps, WAPA-UGP, and WSPC Board