Download presentation
Presentation is loading. Please wait.
1
Trigger report from Run2009
D. Nicolò Pisa
2
Outlook New features Performance Run summary Todo’s for Run 2010
hardware firmware Performance event reconstruction observable resolution efficiency a novel trigger: a-calibration with beam on Run summary Todo’s for Run 2010 automatic gain adjustment dead time reduction Trigger report ... 1/30/2018
3
Hardware Optimization of FADC dynamic range
needed to be improved from Run 2008 further increase of XEC light yield towards nominal value construction of newly designed FE cards with (0÷2V) swing (used to be (0÷1V) beforehand) 400 brand-new cards mounted on XEC Type1 channels (inner PMT 1:1 + side&outer PMT 4:1 inputs) board reworking transmission of FADC selection bit operated from the beginning of CEX run (15/10/09) with all XEC channels in the extended range Resetting of active splitters CM voltage changed to fit FADC range linearity from a few up to 130 MeV Trigger report ... 1/30/2018
4
New FE scheme Low-pass filters (BW = 22 MHz) VOCM = VREF/2
Test and installation completed in October Trigger report ... 1/30/2018
5
Board modification User-programmable bit to select AD9218 gain
0 = [0:1V] Z = [0:2V] completed in September Trigger report ... 1/30/2018
6
Tuning of active splitters
used to be optimized to DRS2 range depending on the offset value the CM output might exceed the voltage swing of amplifiers only part of the current is integrated the gain is ~ 0.5 at low pulse height induced non linearity on the 4:1 output Trigger report ... 1/30/2018
7
Splitter tuning Completed thanks to Y.Yudin before offset correction
after offset correction Trigger report ... 1/30/2018
8
online vs offline, CEX Run 2008
Eγ, linearity in Run 2008… online vs offline, CEX Run 2008 ~4 MeV offset Trigger report ... 1/30/2018
9
Eγ-linearity in Run 2009 - p 0 n γ γ - p γ n 11B(p,γ)12C
offset < 150 keV int. non-linearity < 1% 7Li(p,γ)8Be Trigger report ... 1/30/2018
10
Online Eγ resolution 7.5% FWHM Trigger report ... 1/30/2018
11
Eg efficiency Gaussian smearing at threshold
Correlation with offline TRG energy 6% FWHM: compatible with 0 sR trgenetotalsum.energy (MeV) Trigger report ... 1/30/2018
12
Effect of saturation 2.5 MeV shift
ISAT = 0 ISAT = 1 2.5 MeV shift 23% of events with at least one saturated channel 55 MeV) threshold reduced by 3.5 MeV in the case of saturation Trigger report ... 1/30/2018
13
Todo use QEs for PMT calibration
XEC stable, but need to compensate for gain variation forced to reduce the threshold during Run 2009 Trigger report ... 1/30/2018
14
Δteγ |ΔT (LXe-TC)| expected to be flat (due to accidental background)
σ(ΔT) = (3.1±0.1) ns (used to be 3.8 in run 2008) Online offset changed during the run Both edges are > 2.8 σ out of the signal (as determined by the RMD peak) εΔT > 99.5% start end Δt (ns) Δt (ns) Trigger report ... 1/30/2018
15
zTC calibration z-positron obtained by using TC bars
based on λ log(Qu/Qd) need to equalize PMT use LUTs (one a bar) to implement the log function the absorption length was computed for each bar by using cosmic muons may differ significantly one each other (ranging from 0.5 to 1m) different LUTs for each bar been implemented since Dec 14 used to be the same beforehand same λ for all bars z-resolution improved from 7.1 to 5.5 cm (might be 2.5 cm by using TC APDs) Trigger report ... 1/30/2018
16
Cosmic muons common LUT individual LUTs s = 7.1 cm s = 5.4 cm DZ (cm)
Trigger report ... 1/30/2018
17
MEG events common LUT individual LUTs s = 7.1 cm s = 5.6 cm DZ (cm)
Trigger report ... 1/30/2018
18
TC inefficiency Wrong LVDS transmission TC Type1 board Type2 board 6 bits missing only te+ info got screwed TC acceptance loss 7/30 = 23.3 % in the data collected from 5th to 27th November Transmission check implemented data bus are recorded in memory buffers on both source and destination boards memory comparison operated on-line by the Event Builder check active on pedestal trigger (0.1 s-1) from then on 48 bits serialized by DS90CR481 on 8+1 LVDS connections 4.8 GBits/s Trigger report ... 1/30/2018
19
e+-γ direction based on a LUT to associate XEC PMT (φTC, zTC)
LUT generated by assuming σ(zTC) = 7.3 cm efficiency computation based on a sample of Michel’s a) search for “good quality” track candidates (χ2, matched extrapolation to TC) b) track a backward hypothetical γ from the decay vertex; c) γ hit position XEC PMT index; d) XEC PMT index search for hits on the TC in the LUT turns out to be (88 ± 1)% don’t expect significant variation with improved tracking improved resolution (σ(zTC) =2.5 cm) in Run 2010 should result in a significant efficiency improvement Trigger report ... 1/30/2018
20
Performances: 2008 vs 2009 Observable Run 2008 Run 2009 Run2010 (goal)
ΔEγ/Eγ (%) 8.9 ± 0.1 7.5 ± 0.1 7 %saturation 50 23 Eγ threshold (MeV) 40 ± 1 44 ± 1 eγ (%) > 99.5 δTeγ (ns) 3.8 ± 0.1 3.1 ± 0.1 ε(Teγ ) (%) δzTC (cm) 7.1 ± 0.1 5.5 ± 0.1 2.5 ε(Θeγ ) (%) 66 ± 2 88 ± 1 95 Trigger report ... 1/30/2018
21
-trigger /γ separation based on different scintillation decay time
= 22 ns, γ= 45 ns couldn’t be operated last year due to ionization quenching γ Trigger report ... 1/30/2018
22
On-line -rings -selection efficiency 90% with the beam on!
residual contamination from beam-related background < 20% suppression by 3-orders of magnitude Trigger report ... 1/30/2018
23
After off-line cut Trigger report ... 1/30/2018
24
Physics Run Start Run 50180 2009-10-29 11:27:59
End Run :25:33 Total ‘wall clock time’ (WCT) s ~ 54 d ID DAQ # DAQ rate (s-1) Total 435761 6.36 MEG 387982 5.66 MEG lowQ 1 5613 0.08 MEG wide angle 2 2558 0.04 MEG wide time 3 1490 0.02 Radiative narrow 4 2445 XEC alone High Thr 9 3983 0.06 Alpha 12 4528 0.07 LED 14 5713 DC track 18 7294 0.11 TC alone 22 7288 XEC Cosmic 27 4150 Pedestal 31 2724 Trigger report ... 1/30/2018
25
DATA runs Physics run Period (#50180 - #64482)
Time fraction dedicated to different run types #run L.T. T.T. DT DT cor % of DT cor Total 13855 MEG 11111 84.7 LED 1279 122120 245900 247941 256692 6.5 CW 297 53211 93628 94047 96079 2.4 Xec cosmic 99 5303 24322 25101 25778 0.7 XEC alpha 243 7922 45443 46392 48055 1.2 XEC AmBe 71 1283 13887 13972 14458 0.4 XEC single 126 1063 9496 27509 28371 Michel 26 2143 3933 3968 4146 0.1 TC alone 150 826 11339 11451 12477 0.3 TC cosmic 233 7724 39578 40855 42449 1.1 NaI &BGO 149 32222 46684 46959 47978 Test 51 10445 18054 18307 18656 0.5 XEC calib 10.3% DC calib 0.1% TC calib 3.0% Trigger report ... 1/30/2018
26
DAQ summary Total ‘wall clock time’ (WCT) 4 669 056 s
Total ‘beam ON time’ (BOT) s (88% of WCT) Total of Stop-Start time (DT) s Total of Stop-Start time (MEGT) s Fractions: DT / WCT 84.8 % (running DAQ) MEGT / BOT 81.6 % (running MEG when beam on) other / BOT % (beam related calibrations) LT / BWCT % (DAQ livetime fraction) Leading to LT/BOT = 66 % LT/WCT = 59 % slightly increased w.r.t. Run 2008 LT/WCT = 49 % (55% if we exclude RMD runs) Trigger report ... 1/30/2018
27
How to improve? DAQ Digitizer read-out
reduce inter-run gap (6.8 s, 2.1% deadtime) and/or wake-up time (2.1 s, 0.6% deadtime) (alternatively) have longer runs larger filesize Digitizer read-out reduce read-out time new memory arrangement with multi-event buffering Deadtime 26 ms 15 ms 17% 10% demands for a major firmware upgrade Trigger report ... 1/30/2018
28
Outlook Hardware Firmware Further improvements
extended and programmable FADC range Firmware reconstruction improved w.r.t. Run 2008 Stronger background rejection Higher efficiency -trigger implemented efficiency > 80% (even higher in the case of side PMTs) 3-order of magnitude suppression of beam-related background don’t need dedicated runs any longer Further improvements zTC reco by TC-APDs periodical XEC PMT gain calibration reduce deadtime Trigger report ... 1/30/2018
29
Backup slides
30
TC equalization PMT equalization with cosmic muons, 2 factors
Assume ETC = sqrt(A0 * A1) and ZTC = ln(A0 / A1 ) Use of cosmic muons Equalize the landau distr. Center at 0 the Z distr. 1/30/2018 Offline TRG ETC (a.u.) Trigger report ... Offline TRG ZTC (a.u.)
31
Beam duty Beam ON Start 2009-10-29 11:27:57 End 2009-12-22 11:27:32
Total ‘proton time’ (PT) s Total ‘beam ON time’ (BOT) s (p-current>1500 mA) Fraction of ‘beam ON time’ (BOT/WCT) % Trigger report ... 1/30/2018
32
MEG run benchmark 216 contiguous MEG runs in December
Start run :58:20 End run :33:13 Benchmark ‘wall clock time’ (BWCT) of s Live Time (LT) s Total Time (TT) s Sum of Stop-Start time (DT) s Fractions: LT / TT % (event read out, coherent with DAQ rate) LT / BWCT % (event read out + DAQ) DAQ contribution to Dead Time DAQ wake up time (DT-TT)/ s DAQ inter run gap (BWCT-DT)/ s Trigger report ... 1/30/2018
33
Cyclic buffers Diff. driver Cyc. buff LVDS Tx Type1 FPGA Cyc. buff
FADC Cyc. buff Proces. Algor. LVDS Tx Type1 FPGA Type1 layer Analog inputs Cyc. buff Proces. Algor. LVDS Tx Type2 FPGA LVDS Rx Type2 layer Cyc. buff Proces. Algor. LVDS Tx Type2 FPGA LVDS Rx Final Type2 Trigger output Trigger report ... 1/30/2018
34
TC inefficiency TC trigger problem Direction match LUT OK Time match
New degrader Red TRG 22 Black TRG 0 Direction match LUT OK On Type2-0 MC generated Symmetric US/DS Time match On Type1-3 OK Transmitted through LVDS Error Type 1-3 Board replaced on Nov. 27th Efficiency loss 7/30 = 23.3 % Trigger report ... 1/30/2018
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.