1 Livestock Waste Managerment Project in East Asia
Implementation of Project Report Bangkok, 17-19/6/2008

2 General operations 1. Steering Committee: - Meeting each 2 years
2. PMO: - Meeting each twice a week - Dealing working related plans and two sites. 3. PIUs: - Regular Exchanging; - Implement local activities.

3 General operations 4. Other operations:
Purchasing equipment for stage 1 plan activity and transfering to PIUs Auditing Regular activities. Bàn giao thiết bị cho thôn Tử Dương Bàn giao thiết bị cho huyện Vĩnh Cửu

4 Part 1: Technology demonstration in Hatay
1. Carry out a survey for technical design.

5 Part 1: Technology demonstration in Hatay
2. Organizing meeting to collect Tu Duong fammer’s comments to technical design.

6 Part 1: Technology demonstration in Hatay
3. Transfering working spaces

7 Part 1: Technology demonstration in Hatay
4. Carrying out building:

8 Part 1: Technology demonstration in Hatay
5. PIU’s supervision

9 Part 1: Technology demonstration in Hatay
6. PMO’s supervision

10 Part 1: Technology demonstration in Hatay
7. Survey to selecting new sites: Survey Interview

11 Part 1: Technology demonstration in Dong Nai
1. Survey to build mini PIP Exchange technical issue

12 Part 1: Technology demonstration in Dong Nai
2. Develop the technical in detail, to appraise and approval 3. Preparation documents for tender 4. No objection from WB 5. Tender 6. Construction

13 Part 2: Policy and Replication strategy development
Co-ordinate with MARD and MoH to make a related policy; Sign contract with consultants for policy and replication strategy development; Research to build the rules to protect environment in breading and livestock waste water standards; Hold a conference to collect experts’ comments about draft on policy and replication strategy.

14 Part 2: Policy and Replication strategy development
Some photos of meeting for policy and replication strategy development:

15 Part 3. Monitoring and Evaluation
1. Survey and choose place to take samples 2. Manage to take analysis sample Ground water

16 Part 3. Monitoring and Evaluation
To analyze in the laboratory Make analysis report Take underground water sample: Drill well Take underground water sample: Deep well

17 Organize Meetings and Workshops:
1. Organize Meetings and Workshops in Ha Tay and Dong Nai, including: The meeting about surveing livestock products (in Hatay 18/5/2007; in Dongnai 22/5/2007); The workshop about definition of setting environment protection and subtainable for livestock production (22/5/2007 in Hanoi); The workshops about exchanging information, capacity building and awareness raising (30/5/2007 in Hanoi).

18 Organize Meetings, workshops from PHRD fund:
Workshop on technology and experience to minimize carbon dioxide (11-12/5/2007) Workshop on setting national policy for developing energy reproducing market (4-5/6/2007)

19 Organize meetings, workshops from PHRD fund:
International workshop on approaching to the Carbon Finance (01/22/2008)

20 Part 4: Region Supporting Operation
Participate all the operation of FAO Meeting in Hanoi about DST (11/16-11/17/2007) Meeting to making policies in Thailand (6-7/12/2007) The third Steering committee Meeting in Thailand – RCG 3 (12/08/2007) Visiting and surveying Operation in Thailand Policy development Workshop in Bangkok, Thailand (17-19/6/2008) DST mini Workshop in Hanoi (24-27/6/2008)

21 WB supervisions Time 1 (April 2007) In Đồng Nai In Hà Tây

22 WB supervisions Time 2 (8-12 April 2008) In Hà Tây In Đồng Nai

23 Next steps

24 Next steps: Component 1- in HaTay
Finishing 3 technology demonstration in Tu Duong hamlet Testing to operate and adjust Surveying and designing technology in detail for new sites Organizing training courses to disseminate information about treating technology that are being set up and used; capacity building and awareness raising; Organizing study tours in the South provinces.

25 Next steps: Component 1: in Dong Nai
Finishing technology designing in detail Finishing Tender document about Project Construction Managing to execute the work Managing to survey, and choose some new places Organizing some training courses about domestic animal’s waste treating technology Organizing study tours in Ha Tay and some other regions.

26 Next steps: Component 2:
Continuing finishing drafts for environment protection policy and replication strategy; Organizing professional meetings to set up the drafts; Organizing workshops to take suggestions for policy and replication strategy development; Discussing about new policies applying and testing mechanism.

27 Next steps: Component 3:
Reporting, analysing about water sample indexes in Tu Duong hamlet; Preparing plans to take samples for the new sites; Taking and analysis sample for baseline at the 05 demonstration sites in Tan An commune and making reports.

28 Next steps: Component 4: Coordinating with FAO in general operation;
Providing information to DST software setting up; Other operations related to China and Thailand.

29 Next steps: About other operations
Organizing training course to disseminate new livestock waste treatment technology; Organizing study tour, field visit for farmer in two provinces (Ha Tay and Dong Nai); Organizing International study tour to survey experiences and environment protection operations in breeding.