Download presentation
Presentation is loading. Please wait.
1
WLPT Phase 2 items. COP and ISC.
WLTP-10-39e WLPT Phase 2 items. COP and ISC. JAPAN 16/4/2015
2
Japan feedback on WLTP Phase2 questioner
COP/ISC Proposed discussion point at WLTP Phase2 Develop or clarify the test procedure when production / in-use vehicles are tested, not framework itself. For example; Clarification on which maintenance or adjustment are allowed before testing.(e.g. replacing tires, adjust alignment, etc) Which test method should be taken. RoadLoad determination Type approval ISC COP CO2 value Emissions R/L value
3
END
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.