NATIONAL HYDROLOGY PROJECT.
1ST WORLD BANK MISSION ODISHA- GROUND WATER August 2017 BHUBANESWAR
2
DETAILS OF SPMU (IN POSITION),STAFF STRENGTH ETC.
SPMU Odisha has been formed vide notification no /WR dt. 10/06/2016 of DoWR, GoVT of Odisha. SPMU structure :- 1.Project Coordinator; EIC(P & D),WR 2.Project Director(NHP): Director, Costal Protection & River Training, BBSR. 3.Nodal Officer(SW): Director Hydrometry, BBSR. 4. Nodal Officer(GW): Supdt. Engineer,GWD,BBSR. PMU-OdishaGW has been constituted by the Project Coordinator(NHP Odisha) Vide order no dt. 06/08/2016. PMU[Odisha GW) Structure: 1.B.R. Padhee,SE, -Nodal Officer,Odisha-GW. 2.Er. Anup K. Das,EE -Hydrologist. 3.Er. S.K. Pattnaik AEE(C) -Hydromet Instrumentation Expert. 4.Sri B.K. Sahoo,Geologist -Hydrogeologist. 5.Er. Suparna Nayak,AEE(M) -Procurement specialist. 6.Sri B.P.Padhee,Geologist -GIS Expert. All are in position at present and working in addition to their routine responsibility. Moreover,this Directorate has suggested to appoint the following categories of manpower to work in PMU cell(Odisha-GW). a) Asst. Accountant-1 no.; b) Comp. Operator cum-Office Assistant-2 nos. c) Security Guard-1 no.; d) Office Attendant for PMU cell-1 no. Besides,the field Divisions have requested to engage security personel and office assistants for their Divisions which will be submitted to the higher authority for approval.
3
FUNDS RECEIVED(2016-17),(2017-18) & EXPENDITURE TILL DATE YEAR WISE
FY : INR Lakhs. FY : INR 0.0 Expenditure incurred so far “NIL”.
4
MAJOR PROCUREMENT ITEM IN PIP (ITEM CODE,ITEM AND AMOUNT):-
Sl No. Item Code Item Name Amt.(INR lakhs) 1 A1.2.01 DWLR with Telemetry 1000 2 A1.2.02 Medium Piezometers 600 3 A1.2.03 Deep Piezometers 130 4 A1.4.01 DWLR+WQProbe with Telemetry 250 5 A to A1.6.05 Water Quality Lab Equipment (5 Pkgs) 152.3 6 A1.8.06 Benchmark & RL Survey 75.0 7 A3.1.02 CIvil works for Construction of State data Centre (New) 270.0 8 A3.2.01 Renovation /Repair of existing Divisional data Centre 110.0 9 A3.3.01 Procurement of Office Furniture & Non ITC equipment for state data Centre 100.0 10 A to A3.4.15 IT Hardware & SoftWare(Desktop,printer,power supply and online UPS,scanner,OS etc.) 135.20 11 A to A3.5.04 Arc GIS,2D Modelling software,MS Office,Anti virus etc.) 62.25 12 C2.1.04 PDS1: Study on GW Pollution in Twin City of Cuttack- Bhubaneswar - COnsultancy 30.0 13 C2.2.04 PDS2: Determining measures suitable & effective for artificial Recharge to GW in hard rock tarrin of Kalahandi, Nuapada, sundergarh & malkanagiri districts Odisha - Consultancy 250.0 14 C2.2.05 PDS3: Identification of Freshwater zone in Coastal areas of Odisha - Consultancy 200.0 15 C2.2.06 PDS4: Impact assessment Study of Rooftop Rainwater harvesting & GW recharge in 5 Cities/ Towns of Odisha - Consultancy 125.0 16 D3.1.02 Inspection Vehicle (New) 40.0 17 D3.2.03 Hiring of Vehicles (8 yrs Operation) 150.0
5
MAJOR PROCUREMENT ITEM IN AWP 2016-17 & THEIR STATUS(ITEM CODE,ITEM AND AMOUNT):-
Sl No. Item Code Item Name Amt.(INR lakhs) 1 A3.4.01 Desktop Computers with OS 3.5 2 A3.4.03 Laptop with OS 3 A3.4.14 Power Supply & On-Line UPS for data centre 2.00 4 A3.5.02 Microsoft Office ( Multi User Lic) 1.00 5 A3.5.03 Antivirus 0.50
6
MAJOR PROCUREMENT ITEM IN AWP 2017-18 & THEIR STATUS(ITEM CODE,ITEM AND AMOUNT):-
Sl No. Item Code Item Name Amt.(INR lakhs) 1 A1.2.01 Medium Piezometers 120.00 2 A1.2.03 Deep Piezometers 26.0 3 A3.1.01 Consultancy for design, architecture etc for State Data Centre (New) 10.0 4 A3.2.01 Renovation /Repair of existing Divisional data Centre 11.0 5 A3.4.01 A3.4.03 A3.4.10 A3.4.11 IT Hardware & SoftWare(Desktop,printer,power supply and online UPS,scanner,OS etc.) 19.5 6 A3.5.02 A3.5.03 MS Office,Anti virus 4.25 7 D3.1.01 Cost of infrastructure & furnishing of SPMU 5.0
7
PHYSICAL PROGRESS-COMPLETED, PROCESS UNDERWAY,PROPOSED:-
COMPLETED: - Identification of 143 sites for installation of new Piezometers. PROCESS UNDERWAY:-Bid document for installation of 143 Piezometers under process. PROPOSED:-Procurement of IT hardware & software through bidding process.(since GEMS/DGS&D can not be followed at present in the state)
8
STATUS OF BID DOCUMENT-FLOATED,READY TO BE FLOATED,UNDER PREPARATION:-
FLOATED:- NIL READY TO BE FLOATED- NIL UNDER PREPARATION:- Bid document for installation of Piezometers is under preparation.
9
STATUS OF VARIOUS STUDIES/PDS ETC.:-
Various studies/PDS have been Programmed during FY
10
STATUS OF DATA ENTRY IN E-SWIS:-
Data entry in E-SWIS ; not related to Odisha-GW.
11
STATUS OF HYDROMET STATION (BOTH GW & SW), RECOINCILIATION WITH STATE, CGWB, CWC, IMD ETC.
Total existing piezometers: Total proposed Piezometers in PIP: 700. Piezometers Proposed during FY : 143. Reconciled with CGWB, Integrated by SER,CGWB. Identifying suitable locations for installation of telemetry systems in existing Piezometers under progress.
12
STATUS OF STATE WRIS Not yet started.
Requires advice & support from TAMC.
13
STATUS PUBLIC FINANCE MANAGEMENT SYSTEM(PFMS):-
Registered with PFMS. Expenditure not incurred till yet. PFMS guidelines will be followed.
14
ANY OTHER ISSUES:- TAMC support is required for preparation & finalizing bid documents (for DWLR,WQ equipments engagement of consultants & other procurements.
15
WAY FORWARD:- DoWR has communicated the approval of AWP amounting to Rs lakhs vide letter No /WR Bhubaneswar, dtd 03/08/2017 after which the funds will be utilized way forward.