ELCITA UPDATE March 2017
2
Smart City Project Initiatives for Test bed
M/s Velankani (By Design) have provided 50 Nos of 5 MP Cameras. 14 have been installed & the balance installation is in progress.
3
Smart City Project Initiatives for Test bed
43 Nos of Modified Street light poles have been erected on Infosys Avenue & Pump house road.
4
Smart City Project Initiatives for Test bed
Smart Water Meter supplied by M/s GAIA has been installed in IFIM. TCL are providing the network Connectivity.
5
Smart City Project Initiatives for Test bed
M/s Tejas Network are providing Network design for entire EC & POE switches for the cameras on the test bed. M/s Multiproe have been finalized for supply & installation of Video wall at our command Centre. M/s Wipro Ltd are the integrated partner for Smart City Interface. M/s P Park E are providing parking sensors through LORA network.
6
LOCATION MAP FOR RELOCATING SKYWALK FROM HP to ELECTRONICS CITY SIGNAL (from West Phase to East Phase)
7
PROPOSAL FOR RELOCATING SKYWALK FROM HP to ELECTRONICS CITY SIGNAL (from West Phase to East Phase)
8
PROPOSED 400 KLD STP at KSSIDC COMPLEX
9
Estate Management Modification of existing street light poles with LED lights, Splitters, Camera, Advertisement Board, etc West Avenue 1 –Infosys avenue West Avenue 8 – Pump house Road E – Toilets 20 e-toilets Installed & Operational Estate survey Final Data check & Software Training work in progress
10
Footpath Works – Completed
Footpath Work along East Avenue 1 (TCS Road) Footpath Work along West Lane 1 (MSME Road)
11
Footpath & Drain Work along East Lane 1 (Hical Road)
Footpath Works – Completed Footpath & Drain Work along East Lane 1 (Hical Road)
12
Footpath Works – Completed
Footpath works near Erkadi Systems – West Avenue 2 RCC Culvert near Erkadi Systems – West Avenue 2
13
Footpath & Drain Works – Under Progress
West Avenue-9 (Petrol Bunk Road) West Avenue-8 (Police Station Side)
14
Footpath Works – Under Progress
Pavers Laying Work near C-dot (West Avenue – 1) Footpath works near Siemens – West Avenue 1
15
Sump Works – Under Progress
3KL Capacity UG Sump for E- Toilet (HP Avenue) 3KL Capacity UG Sump for E- Toilet (BWSSB)
16
Sump Works – Under Progress
3KL Capacity UG Sump for E- Toilet (Opp DMart) 3KL Capacity UG Sump for E- Toilet (Tech Mahindra)
17
Fabrication Work – Under Progress
Providing MS Railing for pedestrian safety – West Avenue 1 (Infosys Avenue)
18
Other Works – Completed
2 Nos of Cattle trap at 300KLD STP Sewer line works opp HICAL East Avenue 3 (Tech Mahindra Road)
19
Chain-link fencing for Siemens RMU Yard
Fabrication Work – Completed Chain-link fencing for Siemens RMU Yard
20
Estate Management Contract Awarded
Proposed construction of Drains, laying of Pavers, Kerb stones and Drain cover slabs from Xime Junction to Tata power rear gate & TCS Gate no 2 to Edizi Tools junction (East Avenue 2 & 4), East Phase Providing and laying of Asphalting using 60/70 grade bitumen from Edizi Tools to TCS gate no 3 via Y-Junction, (East Avenue 1& 4). East Phase Along Café Corner & JP IT Park Road
21
Estate Management Contracts on Anvil
Providing House Keeping Services to ELCITA within e-city Industrial Township Area. Modification of existing street light poles with LED lights, Splitters, Camera, Advertisement Board, etc Construction of Concrete Drains, laying of Pavers, Kerb stones and Drain cover slabs Erkadi System to Arvind Mills (West Phase) Construction of 400 KLD STP in KSSIDC Land, West Phase. Construction of 500 KLD STP in KIADB Land, East Phase.
22
Total E-waste Disposed – 4 Tons
SUSTAINABILITY Total E-waste Disposed – 4 Tons Total compost Sold and used – 6 Tons Total waste managed for last two years - Paper recycled 255.7 Tons Plastic recycled 370.8 Metal recycled 21.5 Glass recycled 87 Other Dry waste recycled 57.6 Total Dry Waste recycled 792 Average capacity use of ELCITA STP KLD