Presentation is loading. Please wait.

Presentation is loading. Please wait.

System Level Performance Spec System Level Performance Spec

Similar presentations


Presentation on theme: "System Level Performance Spec System Level Performance Spec"— Presentation transcript:

1 System Level Performance Spec System Level Performance Spec
Provided in Proposal Provided in RFP On Contract at Award Model Contract Model Contract Contract Sections A-K Section L Proposal Narratives/ Volumes Section M IMP/IMS IMP IMS SOO SDP (Annex to IMP) SDP (Annex to IMP) SOW Instructions Expand SOW SOW PWBS Expand CWBS CWBS Compliance & Ref. Docs Compliance & Ref. Docs Compliance & Ref. Docs Propose Additions CDRLs Add (optional) CDRLs CDRLs TRD System Level Performance Spec System Level Performance Spec Expand CLINs* Expand CLINs* CLINs* * The contract line items (CLINs) will be reflected in the structure of Sections B Supplies or services and prices/costs, D Packaging and marking, E Inspection and acceptance, and Deliveries or performance of the Model Contract and Contract.

2 CDRLs: Contract Data Requirements Lists
CLINS: Contract Line Item Numbers CWBS: Contract Work Breakdown Structure IMP/IMS: Integrated Master Plan/Integrated Master Schedule PWBS: Program Work Breakdown Structure Ref. Docs: Reference Documents RFP: Request for Proposal SDP: Software Development Plan SOO: Statement of Objectives SOW: Statement of Work Spec: Specification TRD: Technical Requirements Document


Download ppt "System Level Performance Spec System Level Performance Spec"

Similar presentations


Ads by Google