Presentation is loading. Please wait.

Presentation is loading. Please wait.

EXPLORATION PROGRESS AND HYDROCARBON PRODUCTION DEVELOPMENT

Similar presentations


Presentation on theme: "EXPLORATION PROGRESS AND HYDROCARBON PRODUCTION DEVELOPMENT"— Presentation transcript:

1 EXPLORATION PROGRESS AND HYDROCARBON PRODUCTION DEVELOPMENT
INTERNATIONAL CONGRESS “ENERGY DAY” EXPLORATION PROGRESS AND HYDROCARBON PRODUCTION DEVELOPMENT PRIVATE SECTOR VISION PEDRO GRIJALBA JULY 2012

2 NEW PRODUCTION DEVELOPMENT
EXPLORATION PROGRESS NEW PRODUCTION DEVELOPMENT AGENDA PRIVATE SECTOR VISION JULY

3 BASIN DISTRIBUTION MAP
LOTS CONTRACTS OIL 39 1AB 8 64 ECUADOR COLOMBIA PERU BASIN DISTRIBUTION MAP TUMBES GAS – CONDENSATE 58 57 88 56 Z-1 MARAÑON TALARA GAS – CONDENSATE - OIL BRASIL SECHURA UCAYALI PACIFIC OCEAN MADRE DE DIOS ENE PISCO CANDAMO BOLIVIA CHILE JULY

4 BASINS UCAYALI– ENE– MADRE DE DIOS
CERTIFICATED RESERVES 11 TCF & MMBLS POTENTIAL RESOURCES 50 TCF & 2700 MMBLS UCAYALI ENE MADRE DE DIOS EXPLORATION DISCOVERED RESERVES DEVELOPED GAS UNDEVELOPED GAS PROSPECTS POTENTIAL RESOURCES

5 WORLDWIDE JULY

6 EXPLORATIONPROGRESS - WORLDWIDE
2000’s: Horizontal Tomography between wells / Wireless Seismic 1990’s: 4D Seismic/ Neural Networks 1980’s: 3D Seismic/ Imaging Technology 1970’s: Seismic stratigraphy / VSP 1960’s: Synthetic seismograms / Vibrator Trucks JULY

7 EXPLORATION PROGRESS - WORLDWIDE
SEISMIC FACIES BASIN PROGRESS VISUALIZATION SEISMIC RECORD WHILE DRILLING JULY

8 NEW PRODUCTIONDEVELOPMENT - WORLWIDE
TECHNOLOGY SMART FIELDS INTEGRATION DIGITAL CONNECTION OF OILFIELDS MULTILATERAL WELLS APPLICATION IMPROVED RECOVERY TECHNOLOGY APPLICATION GEOSCIENCES NEW CONCEPTS AND MODELS FOR MATURE FIELDS INTEGRATED GEOLOGICAL MODELS FOR MATURE FIELDS RESERVOIR MANAGEMENT TO OPTIMIZE MATURE FIELDS JULY

9 Source: BP Statistical
JULY

10 Source: BP Statistical
JULY

11 PERU JULY

12 EXPLORATION PROGRESS - PERU
TOTAL 2D SEISMIC PERIOD 222 km EXPLOITATION AREAS – PERU 2D SEISMIC (km) – Period TOTAL 3D SEISMIC PERIOD 2,712 km2 EXPLOITATION AREAS – PERU 3D SEISMIC (km2) – Period SOURCE: PERUPETRO - MINEM JULY

13 EXPLORATION PROGRESS - PERU
TOTAL 2D SEISMIC PERIOD 38,169 km EXPLORATION AREAS – PERU 2D SEISMIC (km) – Period AREAS IN EXPLOITATION – PERU 2D SEISMIC (km) – Between the year 2002 to 2011 TOTAL 3D SEISMIC PERIOD 14,518 km2 AREAS IN EXPLORATION – PERU 3D SEISMIC (km2) – Period SOURCE: PERUPETRO - MINEM JULY

14 EXPLORATION PROGRESS - PERU
EXPLORATORY DRILLING PROGRESS Exploratory Wells FOREST SOURCE: PERUPETRO - MINEM JULY

15 EXPLORATION PROGRESS - PERU
RATIO: 2D Seismic and Exploratory Wells for exploration contracts km/contract Wells/contract Kms / contract Wells / contract SOURCE: PERUPETRO - MINEM JULY

16 EXPLORATION PROGRESS - PERU
Magazine Zona Petrolera January 2011 Venture capital attraction constitutes a fairly complex and huge process EXPLORATION PROGRESS - PERU DISCOVERIES AND IMPLEMENTATIONS Discoveries charts Accumulations Discoveries Implementations SOURCE: PERUPETRO - MINEM JULY

17 EXPLORATION PROGRESS - PERU
IINVESTMENT TOTAL PERIOD USD 6,469 MM EXPLOITATION INVESTMENTS – PERU Period INVESTMENT TOTAL PERIOD USD 2,754 MM EXPLORATION INVESTMENTS – PERU Period SOURCE: PERUPETRO - MINEM JULY

18 EXPLORATION PROGRESS - PERU
“INVESTMENT / No. CONTRACTS” PROGESS Contract Exploitation Exploration YEAR 2011 CURRENT EXPLOITATION CONTRACTS : 20 CURRENT EXPLORATION CONTRACT : 62 TOTAL CURRENT CONTRACTS: 82 YEAR 2011 No. OF LOTS WHERE INVESTMENTS WERE MADE OVER USD 50 MM, IN EXPLOITATION: 04 OVER USD 10 MM, IN EXPLORATION: 12 SOURCE: PERUPETRO - MINEM JULY

19 NEW PRODUCTION DEVELOPMENT
EXPLORATION PROGRESS NEW PRODUCTION DEVELOPMENT AGENDA PRIVATE SECTOR VISION JULY

20 NEW PRODUCTION DEVELOPMENT - PERU
PRODUCTION OF LOT X OIL PRODUCTION IN LOT X WAS DOUBLED New Old JULY

21 NEW PRODUCTION DEVELOPMENT - PERU
OIL PRODUCTION (NORTHWEST) + than 22,000 b/d IN 8 YEARS, PRODUCTION WAS DOUBLED JULY

22 NEW PRODUCTION DEVELOPMENT - PERU
TOTAL PERU SUPERVISED GAS PRODUCTION JULY

23 NEW PRODUCTION DEVELOPMENT
EXPLORATION PROGRESS NEW PRODUCTION DEVELOPMENT AGENDA PRIVATE SECTOR VISION JULY

24 NO INVESTMENT, NO NEW PRODUCTION
RELATION BETWEEN NEW PRODUCTION – INVESTMENT AND DRILLING - NORTHWEST Wells and USD MM BLS/year PRODUCTION DRILLED WELLS INVESTMENT JULY

25 INVESTMENT AND OBJECTIVES
CONSERVATIVE SCENARIO OPTIMIST SCENARIO Source: Strategic Plan of Sustainable Energy and Strategic Environmental Assessment, as planning instruments– MEF-MINEM-BID / 2012 JULY

26 INVESTMENT AND OBJECTIVES
GDP Optimist Pesimist SOURCE: STRATEGIC PLAN OF SUSTAINABLE ENERGY AND STRATEGIC ENVIRONMENTAL ASSESSMENT, AS PLANNING INSTRUMENTS– MEF-MINEM-BID / 2012 JULY

27 INVESTMENT AND OBJECTIVES
HYDROCARBONS TRADE BALANCE BACKGROUND AND STRATEGIC PLAN SOURCE: STRATEGIC PLAN OF SUSTAINABLE ENERGY AND STRATEGIC ENVIRONMENTAL ASSESSMENT, AS PLANNING INSTRUMENTS– MEF-MINEM-BID / 2012 JULY

28 INVESTMENT AND OBJECTIVES
OPTIMIST SUPPLY OF ADJACENT LOTS (NEW EXPLORATION) BASE SUPPLY OF ADJACENT LOTS (NEW EXPLORATION) SUPPLY OF BATCHES (ONGOING EXPLORATION) SUPPLY OF LOTS (NO EXPLORATION) INCREMENTAL SUPPLY PROGRESS ACCORDING TO EXPLORATORY PLAN (MMSCFD) SOURCE: STRATEGIC PLAN OF SUSTAINABLE ENERGY AND STRATEGIC ENVIRONMENTAL ASSESSMENT, AS PLANNING INSTRUMENTS– MEF-MINEM-BID / 2012 JULY

29 INVESTMENT AND OBJECTIVES
INVERSION Y OBJETIVOS Chart R.E.16: CAPEX + OPEX of Gas Plan Chart R.E.14: Exploration Program of Camisea Gas CURRENT VALUE SOURCE: STRATEGIC PLAN OF SUSTAINABLE ENERGY AND STRATEGIC ENVIRONMENTAL ASSESSMENT, AS PLANNING INSTRUMENTS– MEF-MINEM-BID / 2012 JULY

30 E&P PROJECTS – LONG TERM AND RISK
RECOVERY GROWTH – MATURE FIELDS IN PERU, MORE THAN 90% OF OIL PRODUCTION COMES FROM MATURE FIELDS. IT IS IMPORTANT TO PLAN STRATEGICALLY TO INCREASE THE RECOVERY FACTOR FROM 15% TO 35%. IT IS NECESSARY TO EVALUATE (ECONOMIES OF SCALE) THE IMPLEMENTATION OF WELL PROJECTS "INFILL“, DEEP WELLS, HYDRAULIC FRACTURING OF DEEP PENETRATION AND MASSIVE, NEW POTENTIAL HORIZONS, FLUID INJECTION, EQUIPMENT DESIGN AND TOOLS MORE EFFICIENT AND LOW COST. WITHIN 8 YEARS ( ), OIL PRODUCTION NORTHWEST HAS ACHIEVED DOUBLE. CAN WE TRIPLE OIL PRODUCTION? IN HOW MANY YEARS? IT IS POSSIBLE ONLY WITH STRATEGIC PLANNING OF PRIVATE SECTOR OR STATE PLANNING IS REQUIRED? VISION: COMBINED WITH STRATEGIC PLANNING COMPANY - STATE (LONG TERM), INVESTMENT AND TECHNOLOGY, IT IS POSSIBLE TO TRIPLE OIL PRODUCTION. JULY

31 PROJECTS E&P – LONG TERM Y RISK
NEW PRODUCTION – NEW FIELDS PERU, REQUIRES IMPLEMENTING / EXECUTING NEW PROJECTS FOR DEVELOPMENT AND PRODUCTION OF OIL AND GAS. IT IS IMPORTANT THAT THE DISCOVERED GAS HAS BEEN MONETIZED FOR THE WELFARE SOCIETY AND BUSINESSES. NATURAL GAS DOMESTIC MARKET CONSUMPTION GROWS AT A RATE OF 23%, AND IT IS NECESSARY TO MAINTAIN A RATIO RESERVES/ MINIMUM CONSUMPTION OF 20. THE TOTAL CONSUMPTION IN THE COUNTRY IS APPROX. 0.4 TCF PER YEAR (YEAR 2011). IT IS NECESSARY TO CARRY OUT EXPLORATION EFFORTS FOR GAS AND OIL. WITHIN 8 YEARS (JUN 2004 – MAY 2012), PROVED NATURAL GAS RESERVES HAS BEEN CONSUMED 1.3 TCF. CAN WE INCREASE PROVED RESERVES OF NATURAL GAS AND OIL? IN HOW MANY YEARS? IS IT POSSIBLE ONLY WITH STRATEGIC PLANNING OF PRIVATE SECTOR OR STATE PLANNING IS REQUIRED? VISION: COMBINED WITH STRATEGIC PLANNING COMPANY - STATE (LONG TERM), INVESTMENT AND TECHNOLOGY, IT IS POSSIBLE TO INCREASE NATURAL GAS AND OIL RESERVES JULY

32 PILLARS OF BUSINESS STRATEGY
GROWTH SOCIAL AND ENVIRONMENTAL RESPONSABILITY SUSTAINABLE DEVELOPMENT PROFITABILITY JULY

33 INTER-RELATION BETWEEN PRIVATE AND DOMESTIC SECTOR
INFRASTRUCTURE INVESTMENT ENERGY – ROYALTIES - CANON DEVELOPMENT - SUSTEINABILITY EFFICIENT STATUS ON TIME PERMITS JULY

34 STRATEGIC BUSINESS DRIVERS
DISCOVER RESERVES / RESOURCES INCREASE OIL AND GAS RECOVERY JULY

35 INVESTMENT VALUE CHAIN
RESOURCES DISCOVERIES THROUGH EXPLORATION ACCESS TO DISCOVERED RESOURCES DISCOVERY THROUGH EXPLOITATION PROSPECTS INVESTMENT INFORMATION IN PRODUCTION PROVED RESERVES INFRASTRUCTURE INVESTMENT IN JULY

36 CHALLENGES AND OPPORTUNITIES – LONG TERM GROWTH
HUMAN RESOURCES, INFRASTRUCTURE AND LOGISTICS, AVAILABILITY OF INVESTMENTS, DOMESTIC INDUSTRY COMPETITIVENESS, COST OPTIMIZATION APPROVALS “JUST IN TIME” OPPORTUNITIES ECONOMIC GROWTH, MARKET GROWTH, ATTRACTIVENESS TO OTHER COMPANIES, ENHANCEMENT OF RESOURCES, INFRASTRUCTURE GROWTH HIGHER PRODUCTION AND ROYALTIES. JULY

37 THANK YOU JULY


Download ppt "EXPLORATION PROGRESS AND HYDROCARBON PRODUCTION DEVELOPMENT"

Similar presentations


Ads by Google