1 ROOFTOP SOLAR PHOTOVOLTAIC SYSTEM

2 GROUP OF COMPANIES Total group turnover – more than 10Bn INR in different sectors Magicrete Building Solutions Pvt. Ltd –Construction materials Mahati Industries Pvt. Ltd – Power sector Singhania Systems Technologists Pvt. Ltd –Engineering & Technology Sun Metallics & Alloys Pvt. Ltd. – Steel Raghukul Dyeing & Printing Pvt. Ltd - Textile Dropadi Fabrics - Textiles V.S. Industries - Textiles Nalanda Residency, Shree Hari - Real Estate Other - Shailja Tex Prints Pvt. Ltd, R.P. Fashion, Dropadi Apparels, Ambika Textiles, Gangotri Textiles, etc. - Textile firms

3 SERVICES Feasibility study Detailed Project Report System designing
System Installation Government Approvals/Clearances System integration

4 SOLAR PHOTOVOLTAIC EPC
Site Survey & Energy Mapping Site Analysis Equipment Supply Financial Modelling Installation & Commission-ing with O&M Services Power Evacuation Engineering and Design Liasion Services NET Metering ,RPO

5 RCC ROOF GI ROOF OR METAL SHEET ROOF ASBESTOS ROOF
TYPES OF ROOF RCC ROOF GI ROOF OR METAL SHEET ROOF ASBESTOS ROOF

6 DIFFERENT TYPES OF INSTALLATION ON ROOF

7 RCC ROOF INSTALLATION

8 GI ROOF INSTALLATION

9 ASBESTOS ROOF INSTALLATION

10 FIXED TILT GI ROOF INSTALLATION

11 ELEVATED STRUCTURE INSTALLATION

12 BALLAST TYPE INSTALLATION

13 TYPES OF SOFTWARE

14 GOOGLE EARTH

15 PV-SYST

16 AUTOCAD

17 GOOGLE SKETCHUP

18 TYPES OF STRUCTURE

19 MICRO ALUMINIUM RAIL

20 GI STRUCTURE

21 LIST OF SOLAR PV SYSTEM ELECTRICAL COMPONENTS
Modules MC4 Connector DC Cable DCDB Or AJB (Array Juntion Box) Inverter AC Cables SPD, MCCB AC Distribution Box kWh Energy Meter Lightening Arrestor Datalogger or Monitoring Devices DC,AC And LA Earth Pit GI Aluminium Earthing Strip

22 FACTORS AFFECTING GENERATION

23 IRONIES AT SITES Unqualified Contractor Roof Structure Strength
Proper Access For Material Supply over roof Working without any design Unalignment of Panel in each row Installation Of Inverter Mounting Area for Lightening Arrestor Leakages at roof Local Groups like Mathadi

24 NET METERING POLICY

25 NET METERING Net Metering Arrangement” means an arrangement under which a Roof-top Solar PV System with Net Meter installed at an consumption end in your premises & will deliver surplus energy after adjustment to MSEDCL ( Energy Credit ) The Final Electricity Bill of the Month = Units Consumed – Units Generated by Solar At the end of Financial Year the excess energy if any due to credit will be purchased by MSEDCL at Average Pooled Power Price

26 MODALITIES OF NET METERING
Capacity of Solar Rooftop : Should not exceed sanctioned load or contract demand Distribution Transformer : The SRT Capacity shall not exceed 40% of distribution transformer rated capacity. Distribution Licensee may allow Net Metering Exceeding 40% capacity upon detailed load study HT Consumers may install Rooftop system at LT bus bar system but Net meter to be installed at HT side of transformer

27 NET METERING – GRAPHICAL PRESENTATION

28 ELECTRICAL SYSTEM CHANGE
As per Policy the cost of Net Metering is to be borne by MSEDCL But Consumer may opt to change the metering as per approved Specification at own expenses. No change required in internal electrical systems

29 NET METERING GUIDELINES
Commercial circular 258 Application Form Net Metering Procedure Net meter connection agreement Net meter Specifications for 1phase LT, 3Phase LT, LT-CT operated, HT-CT Operated Etc. Approved makes for Net meters: Secure, L& T , Genus

30 NET METERING PROCEDURE
Application form with 1.Technical Specifications 2.SLD 3.Electricity Bill 4.Paid receipt. Where To submit? Application to be submitted to the office of the respective nodal officer/ authorities authorized for billing

31 NET METERING PROCEDURE
Processing fees SLD Verification Technical feasibility Report Letter for Testing of Meters. Test Reports from Testing division Plant Installation Testing No Objection Certificate after testing Agreement between consumer and MSEDCL. Net Meter Installation Verification Report

32 NET METERING INSTALLATIONS

33 NET METER BILL

34 COST OF SYSTEM (Per Wp) Module- Rs.28-30 Per Wp
Inverter Cost- Rs Per Wp BOS –Rs. 5-8 Per Wp Structure- Rs. 2.5 Per Wp (Elevated Rs Extra) Net Meter Liasoning – Rs. 1 Per Wp Total Overall Cost of System – Rs Per Wp (Approx.)