Download presentation
Presentation is loading. Please wait.
1
Cost Projection Comparisons
Examples (except Wallace Creek) are derived from a 2005 Post-Construction Stormwater (PCSW) Ordinance Case Study Analysis. Urban Street Design Guidelines (USDG) have been added. Project Name PCSW and USDG Cost Projections Village of Windrow Original Lots: 24 Remaining Lots: 16 Traditions Original Lots: 83 Remaining Lots: 74 Woodland at Davidson Original Lots: 54 Remaining Lots: 54 Wallace Creek (Charlotte) Original Lots: 152 Remaining Lots: 127 $45,703 More Per Lot = $228,516 More Per Home $731,248 Total Additional Subdivision Costs $13,682 More Per Lot = $68,412More Per Home $1.1 Million Total Additional Subdivision Costs $18,750 More Per Lot = $93,750 More Per Home $1 Million Total Additional Subdivision Costs $23,311 More Per Lot = $116,557 More Per Home $2.3 Million Total Additional Subdivision Costs Tetra Tek Study completed in 2005 – old numbers. Essential Points: Area Housing Market Cannot Absorb These Home Price Increases Low or Negative Margin Profits = No New Construction/Redevelopment Eliminates The Ability to Provide Affordable Housing
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.