Presentation is loading. Please wait.

Presentation is loading. Please wait.

Agenda Introductions & Expectations from the group

Similar presentations


Presentation on theme: "Agenda Introductions & Expectations from the group"— Presentation transcript:

1 Lean@Hilti The way to operational excellence Mr Patrick O’Connell Kostas Kefalakis Hilti Corporation

2 Agenda Introductions & Expectations from the group
Why is fundamental to our strategy History of Global & Local Lean structure How we spread

3 Lean is 50% about Tools & 50% about Mindset
Both are required to reach operational excellence It takes Tools and Systems to create results and business impact It takes a Culture of Excellence (Mindset & Behaviors) to sustain results

4 Why Lean@Hilti & Link to our strategy
The elimination of waste and continuous improvement makes us Faster…in our processes Better…in the quality of our products and services More cost effective…in the way we do business

5 Eliminate non-value-adding activities
Eliminating waste = Reduced lead time Eliminate non-value-adding activities From the customer Value stream To the customer Reduce lead time

6 Examples of Wastes Inventory Motion Waiting
Transport/information transfer Unused potential Over processing/unsuitable methods Defects Over information/production

7 History of Lean @ Hilti Lean@Hilti next level 2016+ 2015
Value stream thinking 2014 Lean in R&D 2013 Lean Assessment 2012 Lighthouse projects in different areas 2011 initiated 2010 Cookbook, standards, methods 2009 Start of Lean journey in Manufacturing Various methods…

8 Local Lean is vital to support the Lean journey
Line organization: Local/ Regional LEAN organization: Global LEAN organization: Region Head/ Plant Manager Head of LEAN Global SC Warehouse/ Unit Manager LEAN Manager Local (60 – 100%) LEAN Manager Global SC Coach Jr. LEAN Manager Local (100%) Optional position, mandatory only at certain conditions Global LEAN community Change Agents within workforce (>10%) LEAN Exchange and best-practice sharing Solid line (direct report) Dotted line (Functional) Example from Supply Chain

9 How we spread Lean@Hilti: 4 Main Focus areas
Trainings & Workshops Support Projects Lean Assessment Gemba coaching

10 Management Kick-off & Buy-in
Experience visits Champions and unit Manager Lean Basic training Vision workshop Lean road map and target per function

11 Foundation of CI: Speedy Quality Circle
Method to rapidly tackle small problems and improvement ideas Foundation for creating a bottom-up inclusive culture Embeds mindset of PDCA, problem definition, 5-why etc

12 Kaizen Workshop – “our bread & butter”
3-5 day event that uses a cross-functional team empowered to solve problems and drive improvements in a rapid manner on the shop floor Key Roles: Sponsor, Lead, Facilitator, Core team, Supporting team Example of Kaizen Workshop:

13 Kaizen Workshop Example – Manufacturing
Topic: Transport Mgmt. Workshop Scope: Machine disturbance & Working space Team: 6 persons + Global lean facilitator Days: 3 days Impact: +20% pieces/shift | -50% walking

14 Kaizen Workshop Example – Transportation
Topic: North America Transport Management Scope: Reorganize Transport routes Team: 10 persons + Global lean facilitator Days: 4 days Impact: $

15 Kaizen Workshop Example – R&D
Topic: Shorten Development Loops Scope: Dev.  Prod.  Assy  Test Team: 8 persons + Global lean facilitator Days: 2.5 days Impact: -30% in development time Before After

16 Support for Projects - Value Stream Projects
1-4 month project that uses a cross-functional team empowered to improve the entire value chain of a product from customer to supplier Key Steps: As-is analysis  Target state  Solutions  Follow-up Example: Batteries VSP – 7 workshops over 4 months with a team of 6 Results: $500,000 savings

17 Gemba Coaching Lean tool used to;
Drive standardisation and sustainability Bring leaders closer to the ‘Gemba’ and to the team Drives continuous improvement Completed daily on different topics and all levels of the organisation Findings worked through the continuous improvement cycle

18 Lean Assessment 11-categories assessed over 2 days on-site global & local leadership to evaluate the lean maturity of a site to define next steps Maturity assessment in order to guide the site to the next level of Lean

19 Why Lean@Hilti & Link to our strategy
The elimination of waste and continuous improvement makes us Faster…in our processes Better…in the quality of our products and services More cost effective…in the way we do business


Download ppt "Agenda Introductions & Expectations from the group"

Similar presentations


Ads by Google