Download presentation
Presentation is loading. Please wait.
Published bySabrina Weaver Modified over 6 years ago
1
Long-Term Planning Presented by: APP Site Visit Don Untch
Lead Long Range Asset Planner APP Site Visit October 30 – November 4, 2006
2
Strategic Tactical LONG-TERM PLANNING or
Fossil & Hydro Generation (F&HG) long-term planning can be either: Strategic or Tactical
3
LONG-TERM PLANNING FLOW HIGH LEVEL OVERVIEW
4
STRATEGIC PLANNING F&HG Ten Year Strategic Plan:
Develops an Asset Management Philosophy Lays the Foundation for a Working Plan that will Evolve with the Changes Associated with Our Industry Is Comprehensive, Giving Consideration to all Known Factors and Variables Incorporates a Environmental Compliance Plan Helps Improve Fleet Operational Performance Considers Yearly Fleet Expenditures Addresses Demographic Concerns with a Workforce Plan Suggests a Potential Fleet Portfolio
5
STRATEGIC PLAN CONTENTS
Summary of Fleet Historical Trends Performance Trends Energy Value and Contribution Equivalent Availability EFOR (Equivalent Forced Outage Rate) Maintenance and Forced Outage Summary Capital and O&M Spending Trends Workforce Plan (Demographics) Future Major Operating Liabilities Environmental Compliance Strategy Long Term Fleet Portfolio
6
STRATEGIC PLANNING PROCESS EXAMPLE WORKFORCE PLAN
PRIMARY GOALS SECONDARY GOALS INITIATIVES LABOR RELATIONS ISSUES DETERMINE OPERATIONAL ROLE OF THE PLANT DETERMINE OPTIMAL STAFFING LEVELS FOR THE PLANTS Review Results from Financial Models & Strategic Long Term Plan Determine Role of Shared Resources Review “Outsourcing” Review Layoff Allowance Consider Strike Impact on Staffing Benchmark Against Other Plants & Utilities “Outsourcing” Layoff & Recall Contract Provisions Layoff Allowance Policy Transferring Employees Between Plants
7
STRATEGIC PLAN – PROGRESSION
Follow-up Meetings with the Various Organizations to Continue Development of Strategic Long Term Plan Fuel Procurement & Fuel Logistics Human Resources Information Technology Market Operations Corporate Communications Environmental Regulatory Services
8
LONG TERM “TACTICAL” PLANNING
F&HG Ten Year Tactical Plan: Focuses on Details Focuses on Action Incorporated into an Executable Schedule or Timeline Focuses on Implementation Focuses on Results Tightly Integrated with the Annual Budget Process Turns Strategy into Reality
9
TACTICAL PLAN – TYPICAL YEARLY MEETING DISCUSSIONS TOPICS
Unit Role Environmental Compliance Market & Commercial Operation Objectives & Shortfalls Fuel Procurement & Handling Financial & Budget External Benchmarking Data Unit Value Assessment Study (if Applicable) Equipment Liabilities by Engineering Discipline Engineering Facility Health Report Health Reports from Previous Business Plans Equipment “GAP” Program (Expectation Shortfalls) Engineering Input & Comments Long Term Planned Outage Frequency and Scheduling
10
TACTICAL PLAN – OUTPUT & RESULTS
Long Term Planned Outage Schedule for each Unit Long Term Turbine, Generator, Boiler Feed Pump & Transformer Inspection Schedule with Spare Part Flow Basis for Input into: Financial Analysis Budgeting Systems Business Planning Process Long Term Plan Unit Long Term Liability Grid Sheet Summary Assigned Action Item List Meeting Minutes
11
TACTICAL PLAN – LONG TERM PLANNED OUTAGE SUMMARY - EXAMPLE
12
TACTICAL PLAN – LONG TERM MAJOR EQUIPMENT REPAIR SCHEDULE - EXAMPLE
13
TACTICAL PLAN – GOING FORWARD
Improve Long Term Plan Information Exchange All Fragmented & Pertinent Information Located in One Place Information is Very Accessible to Multiple Users Comprehensive Plan Used to Facilitate the Decision Making Process
14
Appendix
15
SIMPLIFIED LONG TERM FLOW PROCESS
16
TACTICAL PLAN – LONG TERM SPARE PART FLOW - EXAMPLE
17
TACTICAL PLAN – LIABILITY SUMMARY EXAMPLE FOR 2006
Liability Codes Defined Next Slide
18
TACTICAL PLAN – LIABILITY CODES
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.