High Energy High Intensity Hadron Beams
Network coordinated by W. Scandale and F. Zimmermann Input from L. Bottura, J.-P. Koutchouk, E. Laface, L. Rossi, D. Tommasini, K. Wittenburg, High Energy High Intensity Hadron Beams HHH, CARE Meeting, Paris, April 17-18, 2007
2
HHH, CARE Meeting, Paris. April 17-18, 2007
CARE-HHH network Coordinate and integrate the activities of the accelerator and particle physics communities in a worldwide context, towards achieving superior High-Energy High-Intensity Hadron Beam facilities for Europe road map for the upgrade of the European accelerator infrastructure (LHC and GSI accelerator complex) coordinate activities and foster future collaborations dissemination and outreach WP1: Advancements in Accelerator Magnet Technologies (AMT) WP2: Novel Methods for Accelerator Beam Instrumentation (ABI) WP3: Accelerator Physics and synchrotron Design (APD) Participating institutes: CEA, CERN, CSIC-CIEMAT, CCLRC, DESY, GSI, INFN, PSI, TEU, WUT Associated institutes: CRPP, ENEA, TUBE, ESRF, UPSA, FZK, TEMF, US-LARP (BNL,FNAL,LBNL,SLAC), JINR, IHEP, KEK Additional collaborations: Texas A&M U., U. Geneva, U. Bologna F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
3
activities since CARE’06
Events: 3 HHH workshops held + HHH-US-LARP coordination meetings 8 further workshops/symposia planned Dissemination and outreach: presentations at 2 LHC-detector upgrade workshops, at 3 CERN & INFN management meetings, 3 departmental/project seminars 3 HHH workshop proceedings close to completion 3 articles published in CERN Courier HHH web sites maintained & developed Exchanges and education: several Russian, 2 US, and 1 EU accelerator physicist plus 3 representatives of European industry supported for HHH workshops 1 EU scientist supported for 2-week visit to CERN 5 doctoral students recruited for summer 2007: 3 EU summer students F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
4
HHH, CARE Meeting, Paris. April 17-18, 2007
workshops since CARE’06 4th CARE-HHH-ABI workshop on Simulation of BPM Front-End Electronics and Special Mechanical Designs, Lüneburg, Germany, 30 November - 1 December 2006, Proceedings CARE-Conf HHH Joint CARE-HHH-APD, CARE-ELAN, and EUROTeV mini-workshop on E-Cloud Clearing (ECL2), CERN, Geneva, 1-2 March 2007 CARE-HHH-APD mini-workshop on Crystal Channeling for Large Colliders: Machine and Physics Applications (CC-2007), CERN, March 2007 F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
5
HHH, CARE Meeting, Paris. April 17-18, 2007
major presentations INFN CSN1 Meeting, Frascati, 28 November 2006 - “H8-RD22 Experiment to test Crystal Collimation for the LHC” W. Scandale LHCb Upgrade Workshop, Edinburgh, 11 January, 2007 - “LHC Upgrade Plan and Ideas - Scenarios and Constraints from the Machine Side,” invited talk, F. Zimmermann Joint AB & LHC Project Seminar, CERN, 18 January 2007 – “Baseline Scenario for the LHC Luminosity Upgrade, summary of the CARE-HHH LHC-LUMI-06 workshop” W. Scandale, F. Zimmermann ATLAS & CMS Detector Electronics Upgrade Workshop, CERN, March 2007 “Two Scenarios for the LHC Luminosity Upgrade” W. Scandale LHC Project Seminar, CERN, 15 March 2007 - “H8-RD22 Experiment to Test Crystal Collimation for the LHC” W. Scandale F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
6
deliverables & milestones compared with original plan (CARE’06)
Stones (MS) and Intermediate Deliverables (ID). deliverables & milestones compared with original plan (CARE’06) 2004: HHH & HHH-APD web site => OK 2005: creation of first web-based beam dynamics code repository => OK 2006: web based database for s.c. cables and magnets => OK, 40% complete milestones: web reference for IR optics => OK booster synchrotron optics => delayed to 2007 structured list of intensity limits => nearing completion scaling laws for magnet and cryogenic cost => 2007 2 summer students + 1 doctoral student 1 summer student F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007 The workshop on Coil Manufacturing Optimization was postponed to
7
Accelerator Magnet Technologies
WP1: Advancements in Accelerator Magnet Technologies (AMT) F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
8
Superconductors Database (SDB)
database structure complete web interfaces complete since January’07 collaboration with FNAL and BNL on magnet & cable data sharing main work left to do: creation of automatic tools which import data from existing databases, e.g., for LHC, Tevatron and RHIC, to SDB core this last task will be completed with the help of two summer students in 2007 Courtesy E. Laface F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
9
HHH, CARE Meeting, Paris. April 17-18, 2007
SDB example Courtesy E. Laface F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
10
HHH, CARE Meeting, Paris. April 17-18, 2007
AMT activity OSOM design of 2 T pulsed superferric magnet, follow-up of ECOMAG cable and coil in the iron configured to minimize loss; conceptual design that dissipates less than 10 W/m in the superconducting coil, and a warm iron (i.e. negligible loss power); two variants: wide iron and compact version with correction coil, both suitable for a PS upgrade. other options also examined, such as transmission-line magnets using large current (typically 100 kA), and open gap magnets; these options were discarded because of practical issues (bending radius, magnet size); summary report within next few weeks [L. Bottura] also ongoing: comparison of s.c. and n.c. options for fast cycling “PS2” F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
11
HHH, CARE Meeting, Paris. April 17-18, 2007
AMT exchanges F. Broggi (Milano) visited CERN for 2 weeks in April to work on heat deposition in low-b region Primary goal: change of energy deposition versus distance between triplet and IP. First study showed little dependence. Question byh US-LARP. Present activity: consolidate the conclusions and explore other parts of the parameter space; collaboration with C. Hoa/CERN on precise FLUKA description of IR1 and IR5, including exact magnetic fields (well advanced); set up a few PC's running the latest version of FLUKA (done); switch to latest FLUKA source (DPMJET), used at CERN; confirm the Valencia results with the latest descriptions, source and FLUKA version; prepare a study program of study showing parameter regions still to be explored; investigate these (aperture, insertion length, crossing angle) [J.-P. Koutchouk] E. Laface visited FNAL & BNL for 1 week to coordinate work on s.c. database F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
12
HHH, CARE Meeting, Paris. April 17-18, 2007
planned AMT workshop 27-28 September: CARE-HHH-AMT workshop on Heat Generation and Heat Transfer in Superconducting Magnets (THERMOMAG’07), Paris, 2 days minimizing and evacuating heat in the next generation of superconducting magnets for high intensity particle accelerators, such as the IR magnet for the LHC luminosity upgrade and the fast cycling magnets for FAIR and for the LHC injector chain upgrade; identify the state of the art on (1) cooling techniques (fluids and regimes), (2) heat transfer mechanisms, (3) modeling of heat transfer from coils to cooling system, (4) heat transfer experiments; identify a common set of thermal design criteria F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
13
Accelerator Beam Instrumentation
WP2: Novel Methods for Accelerator Beam Instrumentation (ABI) F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
14
HHH, CARE Meeting, Paris. April 17-18, 2007
4th ABI workshop 27 participants: 6 CERN, 7 DESY, 5 GSI, 1 CEA, 2 RAL, 2 Globes Electronics, 3 Kyocera, 1 FNAL topics: BPM sensors, BPM electronics, cold BPMs proceedings almost ready, will be published as CARE-Conf HHH F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
15
HHH, CARE Meeting, Paris. April 17-18, 2007
planned ABI workshop End of 2007: HHH-ABI annual workshop on Tools for Diagnostic Systems at High-Intensity (Pre-) Accelerators; Emittance Preservation and Measurements in the Accelerator Chain, GSI, Germany F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
16
and synchrotron Design
WP3: Accelerator Physics and synchrotron Design (APD) F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
17
HHH, CARE Meeting, Paris. April 17-18, 2007
CERN Courier 2, 2007 F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
18
LHC upgrade parameters
25 ns, smaller b* 50 ns, long transverse emittance 3.75 protons per bunch 1.7 4.9 bunch spacing 25 50 beam current 0.86 1.22 longitudinal profile Gauss Flat rms bunch length 7.55 14.4 beta* at IP1&5 0.08 0.25 full crossing angle 100 381 Piwinski parameter 0.60 2.5 peak luminosity 15.5 8.9 events per crossing 296 340 initial lumi lifetime 2.1 5.3 effective luminosity (Tturnaround=5 h) 3.6 3.5 4.6 6.7 e-c heat SEY=1.4(1.3) 1.04 (0.59) 0.36 (0.1) SR heat load K 0.36 image current heat 0.33 0.78 gas-s. 100 h (10 h) tb 0.06 (0.56) 0.09 (0.9) D0 + crab wire comp. two LHC upgrade scenarios developed at LUMI’06: 25 ns and 50 ns spacing F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
19
HHH, CARE Meeting, Paris. April 17-18, 2007
upgrade bunch structures 25 ns 50 ns nominal ultimate & 25-ns upgrade 50-ns upgrade, no 50-ns upgrade with 25-ns collisions in LHCb new alternative! new baseline! F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
20
HHH, CARE Meeting, Paris. April 17-18, 2007
luminosity evolution 25 ns spacing 50 ns spacing average luminosity initial luminosity peak may not be useful for physics F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
21
HHH, CARE Meeting, Paris. April 17-18, 2007
event pile up 50 ns spacing 25 ns spacing F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
22
HHH, CARE Meeting, Paris. April 17-18, 2007
25 ns, low b*, with leveling 50 ns, long bunches, with leveling events/crossing 300 run time N/A 2.5 h av. luminosity 2.6x1034s-1cm-2 150 14.8 h 2.9x1034s-1cm-2 75 9.9 h 26.4 h 1.7x1034s-1cm-2 assuming 5 h turn-around time F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
23
HHH, CARE Meeting, Paris. April 17-18, 2007
luminosity evolution with leveling 150 events / crossing 25 ns spacing 50 ns spacing average luminosity F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
24
HHH, CARE Meeting, Paris. April 17-18, 2007
dynamic b squeeze for 50-ns option DN150 F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
25
HHH, CARE Meeting, Paris. April 17-18, 2007
dynamic bunch length change for 50-ns option we might also reduce the charge/bunch and go for shorter bunches F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
26
HHH, CARE Meeting, Paris. April 17-18, 2007
IR upgrade optics “compact low-gradient” NbTi, b*=25 cm <75 T/m (Riccardo De Maria, Oliver Bruning) “modular low gradient” NbTi, b*=25 cm <90 T/m (Riccardo De Maria, Oliver Bruning) “low bmax low-gradient” NbTi, b*=25 cm <125 T/m (Riccardo De Maria, Oliver Bruning) standard Nb3Sn upgrade, b*=25 cm ~200 T/m, 2 versions with different magnet parameters (Tanaji Sen et al, Emmanuel Laface, Walter Scandale) + crab-waist sextupole insertions? (LNF/FP7) early separation with b*=8 cm, Nb3Sn includes D0; either triplet closer to IP or Q0; being prepared for PAC’07 (Jean-Pierre Koutchouk et al) compatible with 50-ns upgrade path F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
27
HHH, CARE Meeting, Paris. April 17-18, 2007
crab waist scheme initiated and led by LNF in the frame of FP7; first beam tests at DAFNE later in 2007 Hamiltonian minimizes b at s=-x/qc realization: add sextupoles at right phase distance from IP focal plane F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
28
HHH, CARE Meeting, Paris. April 17-18, 2007
phased LHC upgrade recent CERN management decision: early IR upgrade (“phase-1”): based on NbTi magnets, implemented ~2012 “low-gradient” large-aperture NbTi optics solutions developed by HHH are three good candidates IR optics selection by Lyn Evans in 2007; input from HHH studies more ambitious Nb3Sn upgrade and higher luminosity planned in a 2nd phase F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
29
HHH, CARE Meeting, Paris. April 17-18, 2007
ECL2 workshop 35 participants: 16 CERN (4 AB/ABP, 1 AB/OP, 7 AB/RF, 2 AT-VAC, 2 TS), 3 German enamel industry (Eisenwerke Dueker, Wendel ), 4 US (BNL, Cornell, LBNL & SLAC), 1 KEK, others from European institutes (Astec, LNF, DESY, ANKA, U. Rostock, CELLS, U. Sannio, ESRF) topics: CERN NEG coating facility, motivation, technological solutions, simulations, beam measurements, impedance, for PS2, SPS upgrade, LHC upgrade, CLIC & ILC F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
30
ECL2: solutions against electron cloud
slotted vacuum chamber (W. Bruns) New! enamel electrodes (F. Caspers) New! electrete inserts (F. Caspers) New! NEG coating (P. Chiggiato) slotted chamber enamel-based electrode F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
31
HHH, CARE Meeting, Paris. April 17-18, 2007
CC-2007 topics: critical review of experimental results crystal production technologies application of bent crystals to LHC collimation system assessment of new crystals through experiments at SPS and Tevatron use of crystals for diffractive physics co-sponsored by INTAS 45 participants: INFN Genova, U. Ferrara, INFN Legnaro, PNPI Gatchina, IHEP Protvino, FNAL, JINR Dubna, INFN Frascati, INFN Roma, U. Manchester, U. Texas, F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
32
HHH, CARE Meeting, Paris. April 17-18, 2007
PRL article on 2006 SPS experiments published last week! including CARE acknowledgement SPS crystal collimation test F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
33
HHH, CARE Meeting, Paris. April 17-18, 2007
2007 crystal experiments 7 weeks of SPS runs allocated to collaboration Goals: test multi-strip crystals check the effect on ions verify their fragmentation and e.-m. dissociation inside the crystal, test the effectiveness of crystal collimation for ILC Support: CARE-HHH , INTAS-CERN, INFN-NTA, Russian Foundation for Basic Research, CERN AB and AT Departments F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
34
HHH, CARE Meeting, Paris. April 17-18, 2007
APD exchanges R. De Maria (grad student) visited FNAL for 1 month in February-March to work on heat deposition in low-b region for NbTi “low-gradient” IR optics solutions Collaboration with N. Mokhov, US-LARP W. Scandale visited FNAL for 1 week in February to participate in Tevatron crystal experiment Two graduate students (U. Dorda, G. Sterbini) will participate in RHIC beam-beam compensation experiments for two weeks this June, in the frame of HHH/US-LARP collaboration F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
35
HHH, CARE Meeting, Paris. April 17-18, 2007
planned APD workshops CARE-HHH-APD CERN-GSI bi-lateral working meeting on Collective Effects–Coordination of Theory and Experiments, CERN, Geneva, Switzerland 1-5 October: CARE-HHH-APD event BEAM’07 , CERN - mini-workshop on LHC Injectors Upgrade & FAIR PS2, SPS enhancements, GSI upgrades - mini-workshop on LHC Beam Parameters Upgrade beam parameters and upgrade scenarios; e.g. bunch spacing, operation with large Piwinski angle, luminosity performance - Francesco Ruggiero Memorial Symposium (Oct. 3) 7-9 November: CARE-HHH-APD workshop on LHC IR Upgrade (LUMI'07), INFN Frascati, Italy new low-beta quadrupoles, detector-integrated dipoles and quadrupoles, crab cavities, wire compensation, experience with new DAFNE IR F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
36
Francesco Ruggiero Memorial Symposium
3 October 2007 during HHH-APD BEAM’07 Tentative speakers: S. Berg, C. Biscari, O. Bruning, W. Chou, M. Furman, K. Hirata, A. Mostacci, L. Palumbo, C. Petit-Jean-Genaz, S. Petracca, E. Picasso, W. Scandale, J. Thomashausen, F. Zimmermann ,… F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
37
Gantt chart for next 18 months AMT and ABI
F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
38
Gantt chart for next 18 months APD
F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007
39
HHH, CARE Meeting, Paris. April 17-18, 2007
Conclusions numerous high-impact workshops focused activities in many frontier areas - crystal collimation, slim magnets, e-cloud suppression, low-angle crab cavities, beam-beam compensation, novel optics design schemes, fast cycling s.c. magnets, new beam diagnostics results benefit global accelerator community - code repository, s.c. database, intensity limits enhanced dissemination & training effort - mutual visits between partner labs, publications, seminars, web pages, summer students and graduate students HHH is “high-return investment for Europe” F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007