Presentation is loading. Please wait.

Presentation is loading. Please wait.

Hampden Township Stormwater Management Program

Similar presentations


Presentation on theme: "Hampden Township Stormwater Management Program"— Presentation transcript:

1 Hampden Township Stormwater Management Program
MS4 Program Plan Updates/Revisions

2 MS4 Program Plan Updates/Revisions
Agenda Introduction Description of MCMs Sample Plan Format Things to Consider Brief Description of Each Plan Questions

3 Six Minimum Control Measures
MCM # 1 Public Education and Outreach MCM # 2 Public Participation / Involvement MCM # 3 Illicit Discharge Detection and Elimination MCM # 4 Construction Site Runoff Control MCM # 5 Post-construction Stormwater Management in New and Re-Development Activities MCM # 6 Pollution Prevention / Good Housekeeping for Municipal Operations

4 Required Program Plans
MCM # 1 – Public Education and Outreach Program (PEOP) MCM # 2 – Public Involvement and Participation Program (PIPP) MCM # 3 – Illicit discharge Detection and Elimination Program MCM # 4 – Construction Site Runoff Control (Optional) MCM # 5 – Post Construction Stormwater Management Program MCM # 6 – MS4 Training Program for Municipal Employees MCM # 6 – Operation and maintenance Manual for Municipal Operations

5 Sample Plan Format Cover Table of Contents Goals List of Components
Description of Components Approval Appendices

6 Things to Consider Plans MUST meet your minimum permit requirements!
Plans should reflect how YOUR community does things. Consider other DEP/EPA programs outside of MS4 (such as: OSHA, Hazardous Waste). Don’t be hesitant to throw their own stuff back at them.

7 MCM # 1 - Public Education and Outreach Program (PEOP)
Components Target audiences Information dissemination Website improvements Educational activities Information and education materials Educational displays Evaluation of Effectiveness:

8 Cover

9 Table of Contents

10 Components

11 Evaluation & Approval

12 Appendix – A Portion of MS4 Permit
Appendices Appendix – A Portion of MS4 Permit

13 YOUR Permit Here!

14 Appendix – B Target audience groups
Appendices Appendix – B Target audience groups

15 Target Audience Groups

16 Appendices Appendix – d approvals

17 Approval

18 MCM # 2 – Public Involvement and Participation Program (PIPP)
Components Public Meetings for Stormwater Issues (MCM # 2, BMP # 3) Engage stakeholders to participate in local watershed and development clean up days and document activities. (MCM # 2, BMP # 3) Participate with Cumberland County MS4 Work Group Work with the Capital Region Council of Governments (CAPCOG) to have general stormwater educational meetings, on a regular basis. Update the Stormwater page. Yearly review of this program and suggestions for improvement. (MCM # 2, BMP # 1).

19 MCM # 3 – Illicit Discharge Detection and Elimination Program
Components Audit existing resources and programs Establish responsibility, authority and tracking Complete a desktop assessment of illicit discharge potential Develop program goals and implementation strategies Search for illicit discharge problems in the field Identifying priority areas Procedures for screening outfalls in priority areas Isolate and fix individual discharges Septic system discharges Prevent illicit discharges Annually evaluate the IDDE Plan

20 MCM # 4 – Construction Site Runoff Control
Components Memorandum of Understanding with the Cumberland County Conservation District. Provide educational material to citizens and contractors to inform them about environmentally sound construction practices. Perform construction site inspections as a part of the Township’s routine inspection program. Establish a reporting mechanism to process citizens’ complaints related to construction site practices. Annually evaluate the CSRC Plan.

21 MCM # 5 – Post Construction Stormwater Management Program
Components Establish criteria for the proper sizing of stormwater BMPs. Establish an inspection program to observe the installation of new BMPs. Require the implementation of stormwater BMPs that are appropriate to the community. Ensure that controls are in place to reduce water quality impacts. Methods to encourage Low Impact Development. Establish a mechanism to ensure proper operation and maintenance of installed BMPs. Develop an inventory of stormwater BMPs installed in the Township. Audit Existing Resources and Programs. Inspection of Township owned BMPs.

22 MCM # 6 Municipal Employees Training Manual
Components Specialized training for MS4 staff. Coordinated training program with other Townships. In-house training for Township maintenance and administrative staff. Evaluation of effectiveness

23 MCM # 6 – Operation and Maintenance Manual for Municipal Operations
Components Inventory of municipal facilities. Description of municipal operations. Description of practices and procedures to reduce pollution. Description of proper procedures to dispose of wastes. Evaluation of Effectiveness

24 Questions?


Download ppt "Hampden Township Stormwater Management Program"

Similar presentations


Ads by Google