Download presentation
Presentation is loading. Please wait.
1
Progress of GEM R&D in Lanzhou Univerity
Yi Zhang
2
Time properties of GEM-detector signal R&D of GEM detector
Contents Time properties of GEM-detector signal R&D of GEM detector R&D of GEM-Daq Future plan Aug. 11, 2016 Prog. of GEM R&D in LZU
3
Time properties of MPGD signals
Fast raising time Signal duration depends on the way of energy deposition Particle identification by cut on time The maximum duration is independent of incidental energy Correct the initial position Aug. 11, 2016 Prog. of GEM R&D in LZU
4
try to reduce the load of DAQ by clustering on hardware level (FPGA)
Goal reduce the local rates by rejecting γ signals according to the time information try to reduce the load of DAQ by clustering on hardware level (FPGA) Aug. 11, 2016 Prog. of GEM R&D in LZU
5
To demonstrate the conclusions, a test was done
Mean=89.4ns σ= 1.744 Mean=135.7ns σ= 22.8 SP-ADQ412: 1.8GHz Aug. 11, 2016 Prog. of GEM R&D in LZU
6
Garfield++ simulation of the double GEM + Mesh
Garfield++ simulation of the double GEM (reference) Edrift=1kV/cm EGem=58.33kV/cm gain=9032 Garfield++ simulation of the double GEM + Mesh Edrift=1kV/cm EGem=58.33kV/cm Eamp=40kV/cm gain=68930 Aug. 11, 2016 Prog. of GEM R&D in LZU
7
R&D of GEM detector Aug. 11, 2016 Prog. of GEM R&D in LZU
8
New readout panel To APV25 167 channels in 10 cm PANASONIC 130P
Aug. 11, 2016 Prog. of GEM R&D in LZU
9
New version of triple-layer GEM detector
Aug. 11, 2016 Prog. of GEM R&D in LZU
10
High voltage and trigger
MPD+V1218 HV drift electrode 5M 10M 6KV 103M 10M CF8000 discriminator }GEM I }GEM II }GEM III 6KV 103M 15M Trigger Aug. 11, 2016 Prog. of GEM R&D in LZU
11
Test result of new detector (55Fe)
σ~127um σE~19.5% σ~127um Aug. 11, 2016 Prog. of GEM R&D in LZU
12
x-ray imaging by new detector and Daq
10 cm detector & daq system Aug. 11, 2016 Prog. of GEM R&D in LZU
13
R&D of GEM-Daq Aug. 11, 2016 Prog. of GEM R&D in LZU
14
coincidence trigger to identify muon and photon
Aug. 11, 2016 Prog. of GEM R&D in LZU
15
Real signals recorded in Daq
55Fe cosmic μ- Aug. 11, 2016 Prog. of GEM R&D in LZU
16
comparing signal amplitudes of different particle
x-ray in 1 period x-ray in mutil period muon in 1 period muon in mutil period Aug. 11, 2016 Prog. of GEM R&D in LZU
17
Avalanche electrons collected on by detector (simulation)
Aug. 11, 2016 Prog. of GEM R&D in LZU
18
Steps of online track reconstruction
Divide signals into time slices (1 period for each) Segmentation in readout plane —— cut on signal amplitude Combine adjacent segment —— identify clusters of hits Process multi time slices Combine adjacent time slices —— distinguish if signal continues Integrate multi time slices —— identify the start and end of a signal Aug. 11, 2016 Prog. of GEM R&D in LZU
19
Forming hit clusters in one time slice (simulation)
Aug. 11, 2016 Prog. of GEM R&D in LZU
20
Development board: ARRIA GX FPGA toolkit
EP1AGX60DF780C6N Aug. 11, 2016 Prog. of GEM R&D in LZU
21
Forming hit clusters in 1 time slice
fake data test (27×27 chns) Aug. 11, 2016 Prog. of GEM R&D in LZU
22
Processing speed VS signal coverage ratio
Used FPGA periods Ratio of fired channels in 1 period (%) Aug. 11, 2016 Prog. of GEM R&D in LZU
23
Resources consumption budget (2048 chs)
from INFN : reports of our code: Iterms of resources Total Usage of current daq Usage of out code Combinational ALUTs 48,080 21,247 (44%) 14,092 (29%) Dedicated registers 13,382 (28%) 32,224 (67%) DSP 256 3(1%) Block Memory Bits 2,528,640 1,808,252 (72%) 73,216 (3%) Aug. 11, 2016 Prog. of GEM R&D in LZU
24
Combine few time slices, get the complete tracks (simulation)
Aug. 11, 2016 Prog. of GEM R&D in LZU
25
Identify the tracks (simulation)
Aug. 11, 2016 Prog. of GEM R&D in LZU
26
Try to identify signals of different particle (data)
period2/period1 period3/period1 period3/period2 Aug. 11, 2016 Prog. of GEM R&D in LZU
27
γ background in SoLID GEM
5 kHz/mm2 from SoLID PreCDR Aug. 11, 2016 Prog. of GEM R&D in LZU
28
primary electron-ion couples in triple GEM
Aug. 11, 2016 Prog. of GEM R&D in LZU
29
Signals induced by 1 track
FEE rising time (22ns) included Aug. 11, 2016 Prog. of GEM R&D in LZU
30
process multi time slices on FPGA test with real beam data?
Future plan process multi time slices on FPGA test with real beam data? communicate with INFN experts try to merge our code into current firmware Aug. 11, 2016 Prog. of GEM R&D in LZU
31
Thank you !
32
Aug. 11, 2016 Prog. of GEM R&D in LZU
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.