Download presentation
Presentation is loading. Please wait.
Published byKelly Houston Modified over 7 years ago
1
ESTIMATION OF CROP WATER REQUIRMENT OFDIFFERENT CROPS GROWN IN KUMLUR
By, NISHIT AMAN BTE
2
GREEN GRAM Season – Rabi ( Starting Nov) Kharif ( Starting March)
Temperature – degree Celsius Soil Type - Loamy soil
3
HOW TO CALCULATE CWR? Calculate reference Evapotranspiration
Find out crop coefficient of the green gram during different stages of growth. Multiply both to get actual evapotranspiration.
4
DATA COLLECTED FOR CALCULATION
Date of sowing – 1st march Date of harvest – 8th June Altitude of Kumulur – 78 m Latitude of Kumulur - 10°8’ Relative humidity – 80% Mean Max. temperature during March, April May and June are 32.4°C,36.3°C 38.0°C and37°C Mean Min. temperature during March, April May and June are 22.4°C, 24.7°C, 26.6°C, and 26.1°C
5
ESTIMATION OF ET0 Modified Penman method
Mean max. temperature for four month is 35.57°C. Mean min. temperature for the four month is 24.95°C. Mean air temperature will be 30.26 Mean sunshine Hour (n) 3.43 Maximum Possible Sunshine hour 12.3 n/N will be 0.28
6
Cont.. Extra-terrestrial radiation(Ra) in mm/day (from the table). Wind speed = 6km/hr or 144km/day
7
AERODYNAMICS TERM ea = 42.41 mbr ( From the table) ed = RH/100 × ea
= ×42.41 = mbr ea – ed = ( ) mbr = mbr f(u) = 0.66 ( 1- W) = ( from the table)
8
RADIATION TERM Rns = Ra× 0.292 = 12.74 ×0.292 = 3.72
= 3.72 Rnl = f(t) × f(e) × f(n/N) = ×0.1 ×0.354 = 0.59 Rn = Rns – Rnl = = 3.13
9
Cont… W = 0.781 ET0 (Unadjusted) = W Rn + (1-W).f(u)(ea - ed )
= (0.781 × 3.13) + ×0.66 ×8.49 = 3.66mm/day ET0 = c × ET0 = × 3.66 = mm/day
10
DETERMINATION OF CROP COFFICIENT
Initial Stage - 20days Development stage – 30 days Middle stage – 30 days Late stage – 20days
11
Initial Stage From 1st march to 20 march Kc = 0.5 ET0 = 3.99mm/day
ET = Kc × ET0 = 0.5 × 3.99 = 1.995mm/day = 39.9mm/stage
12
Development stage From21st march to 20th April Kc = 1.05
ET0 = 3.99mm/day ET = Kc × ET0 = × 3.99 = mm/day = mm/Stage
13
Middle stage From20st April to 19th May Kc = 1.02 ET0 = 3.99mm/day
ET = Kc × ET0 = × 3.99 = mm/day = mm/Stage
14
LATE STAGE From20st MAY to 10th May Kc = 0.9 ET0 = 3.99mm/day
ET = Kc × ET0 = 0.9 × 3.99 = mm/day = mm/Stage
15
Cont… Total water requirement from day of sowing to day of harvesting will be summation of all. 39.9mm mm mm mm = mm
16
Result Total water requirement of the green gram as calculated by Modified penmen method is mm.
17
THANK YOU
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.