2017 AGC Summer Conference July 28, 2017
Todd Steagall, P.E., Director of Construction
2
Organizational Changes
3
Organizational Changes
DEA District 6 – Tim Henderson replaces Robert Clark DEA District 7 – Kevin Gantt Acting Deputy Secretary for Intermodal Planning – Jim Feda Chief Engineer for Project Delivery – Randall Young Director of Environmental – Chad Long Assistant Bridge Construction Engineer – Steve Nanney DEA District 1 – Robert Dickinson replaces Bryan Jones
4
Organizational Changes
RCE Changes: York (Jared Bragg replacing John Huskins) Chester/Fairfield (Mike Moss interim for Jeremiah Bradley) Charleston (Darlene Broughton replaces Rickie Green) Charleston (Sarah Gaffney replaces John Paulus) Charleston Bridge (Vacant – Jeff Rajabi) Colleton Bridge (Keith Green replaces Tony Ragos) Richland (Derek Frick replaces Chris Kelly)
5
Organizational Changes
RCE Changes: Greenville (Jack Valetti replaces Kimberly Bishop) Cherokee (Wes Spencer replaces Shane Parris) District 5 Travis Patrick replaces Jason Thompson (Jason left SCDOT for Horry County) Darlington (Philip Bethea replaces Heather Ford) Dillon (Trey Parnell replaces Scott Ward) Lexington (Joey McIntyre to HQ) Sumter (Jeffrey Wilkes moved to Lee Maintenance)
6
Upcoming Construction Retirements
DCE Lee Neighbors – District 2 RCE Tim Callenback - Pickens RCE John Huskins – York DCE Robbie Isgett – Military duty for 1 year
7
Current Contract Status
8
*Does not include ER or County projects
9
*Total Highway Construction Projects: 416
Total Current Contract Amount Total Value of Work Performed Contracts in Force *Total Highway Construction Projects: 416 Federal: State: Other: $1,609,993,021 $2,905,620,361 $ 388,208,408 $ 907,418,932 Federal: State: Other: $ 577,889,900 $882,435,313 $ ,398,283 $ ,147,130 Total Remaining Contract Value Federal: State: Other: $ 1,032,103,121 $2,023,185,048 $ ,810,125 $ ,271,802 As of 05/20/17 Source: DOC *Include only contracts in SCDOT’s name Includes through May 2017 letting, Wando DB, I85/385 DB, Bridge PKG E DB, US701 DB, I77 DB, I20DB, Port Access, I85DBPH1/2, and Volvo Does not include Emergency Recovery projects (ER). ER projects have a separate slide.
10
*ER contracts not included
12
Future Projects
13
Upcoming Bid Build Asphalt Projects (Tentative Dates)
I-26 MM Total Reconstruction (2018) I-26 MM Reconstruction (2019/2020) I-95 MM SB Overlay (2018/2019) I-95 MM (2017) I-26 MM (2017) I-95 MM (2017) I-95 MM (2020)
14
Upcoming Design Build Major Interstate Projects (Tentative Dates)
I-85 Widening MM (2017) - Asphalt I-26 Widening MM (2018) Carolina Crossroads (2019) I-85 Widening MM ( ) I-526 Widening MM11-18 Low Country Corridor (2020) I-26 Widening MM (2023) I-526 Widening MM (2024) I-26 Widening MM (2026)
15
Upcoming Low Country Projects
I-26 Widening MM (Summer 2018) Jedburg to Nexton Parkway US 17 – Jasper County (Late 2018) 4 miles of widening from 2 to 4 lanes w/divided median Berlin Myers Parkway (2019-Permit Dependent) I-26 Widening MM (Summer 2021) SC 27 to Jedburg
16
Upcoming Upstate Projects
Anderson – Browns Rd./Kings Rd. Roundabout (Nov. 2017) Anderson – Concord Rd./Harris Bridge Rd. Roundabout (Nov. 2017) Spartanburg – S-30 Roundabout (Nov. 2017) Spartanburg – Crescent Ave. Bridge Replacement (Nov. 2017) Pickens – S-153 Extension (Nov. 2017)
17
Upcoming Upstate Projects
Edgefield – S-68 Bridge Replacement over Turkey Creek (Dec. 2017) McCormick – S-823 Bridge Replacement over Little River (Dec. 2017) Greenville – Roper Mountain Road Ext. and Widening (Jan. 2018) Greenville – Batesville Road Widening (March 2018)
18
Upcoming Pee Dee Projects
Dillon - I-95 SB Rehab MM (Dec. 2018) Florence/Lee – US 76 Bridge Replacement over Lynches River (March 2019) Florence – Alligator Road Widening (June 2019) Williamsburg – Andrews By-Pass Phase II New Location (August 2019)
19
Upcoming Midlands Projects
Lexington – US 378 Bridge Replacements over Horse and Hollow Creeks (Nov. 2017) York – I-77 at Gold Hill Road Interchange Improvement (April 2018) Lexington - US 1 Widening (Summer 2018) Newberry - I-26 Reconstruction MM (Summer 2018)
20
Upcoming Midlands Projects
Laurens/Newberry - I-26 Rehab MM (Summer 2019) Richland – I-77 Rehab MM (Summer 2019) Lexington – Columbia Avenue Widening in Chapin (Fall 2019)
21
Specifications
22
Notable Specification Updates
Approved Muck Excavation – defined maximum limits and quantity if no bid item in contract Prompt Payment Clause – added a resolution clause Claims Procedure – added timeframe for decision acceptance In Progress Cement Modified Recycled Base SC-M-400 – Hot Mix Asphalt Quality Assurance
23
Program Challenges Manpower Project Management
Loss of institutional knowledge SCDOT Contractors CE&I Limited number of available bodies State forces reducing Reduced experience factor Increased reliance on consultant forces Qualified Labor Availability
24
Program Challenges Capacity Are contractors nearing capacity?
Plant production and laydown capabilities equal? New plants (new sites as well as silos at existing plants) Labor Pool Dwindling interest in career field Training Recruitment Retention Projects and Letting Size Scope Timing of letting
25
Bottom Line
26
Bottom Line SCDOT and AGC are in this together
We will not deliver this program without working side by side Trust and Communication are essential We will succeed or fail as a team
27
QUESTIONS ??