Presentation is loading. Please wait.

Presentation is loading. Please wait.

2 protos in MASER (One in Valencia, One sent to Nikhef)

Similar presentations


Presentation on theme: "2 protos in MASER (One in Valencia, One sent to Nikhef)"— Presentation transcript:

1 2 protos in MASER (One in Valencia, One sent to Nikhef)
6 prototypes produced: 2 protos in MASER (One in Valencia, One sent to Nikhef) 4 protos in PHOENIX Proposal to have: 2 Genova (One to Demokritos??) 1 Bologna 1 Nikhef Already under test FPGA programed properly! Flash programed after change of memory to one Spansion of 256 Mbits (The Micro 1Gb was not supported by Xilinx)

2 Footprint  U11 too narrow. Component soldered by hand and with some glue (Footprint to be corrected for the first preserie). Footprint SW3 too wide. Grounds soldered with a wire (Footprint to be corrected for the first preserie) Footprint U12 too wide. Soldered by hand (Footprint to be corrected for the first preserie) Pad of transistors (SOT23) not seen (Footprint to be widen for the first preserie). The same for the 0402 components (No so clearly observer there) Add label “+” and “-” near the power connector J2 Flash N25Q1024 (1 Gb) is not programmable with the existing  Impact version. Change for S25FL256 (256 Mb) was done for the prototypes. Other programmable flash 1 Gb to put in the new footprint?

3 Use proper tooling to assemble GBX connectors (see http://pi1222
Tooling for power connector, Molex partno : Tooling for backplane connector, Molex PartNo : The Nano beacon connector (J22) should be moved since there is a mechanical conflicts with the Octopus Large board ( Note also that “J22” is missing on the silkscreen. !!!Attention!!! The Power connector (J2) has a pin swap as compared to the CLBv1!

4

5

6 Present results of the derating excel file
Reliability: Present results of the derating excel file Check with sthephane how to procceed with the reliability analysis If spare time: Visit the Nikhef setup for the WR test on the CLBv2 Social dinner the 29 th Please contact Els de Wolf or Myself

7

8 The 25 160 T -2 for preserie-1 have already arrived!
Applying for funding for the prototypes at the IFIC -> In two weeks time resolution

9 CLBv2 PRR 4 and 5 March in Bologna?


Download ppt "2 protos in MASER (One in Valencia, One sent to Nikhef)"

Similar presentations


Ads by Google