Download presentation
Presentation is loading. Please wait.
Published byJulia Davidson Modified over 6 years ago
2
Solaris status Wojciech Kitka, on behalf of CS&IT group and whole Solaris team Touluse,
3
Wojciech Kitka, 30th Tango Collaboration Meeting
Outline Solaris status People Control System at Solaris Summary 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting
4
Wojciech Kitka, 30th Tango Collaboration Meeting
The Machine Overview Solaris is a replica of the MAX IV 1.5 GeV Storage Ring. Injector: 550 MeV linear accelerator Thermionic electron gun 6 S-band normal conducting structures Storage Ring: Energy: 1.5 GeV Current: 500 mA 12 straight sections 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting
5
Wojciech Kitka, 30th Tango Collaboration Meeting
Beamlines BL-04BM – PEEM/XAS – advanced installation Bending magnet based In assembly EMITEC end-station XAFS endstation BL-05ID – UARPES - commissioning Turnkey delivery by Elettra Undulator ID Control system commissioning (Cosylab) PREVAC end-station PHELIX – new beamline I1011 – beamline from Max-Lab 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting
6
Wojciech Kitka, 30th Tango Collaboration Meeting
Solaris status (1) June 2015: - first turn, - electrons stored in Storage Ring – 5.2 mA, 490 MeV. 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting
7
Wojciech Kitka, 30th Tango Collaboration Meeting
Solaris status (2) November 2015: - nominal optics, - electrons in Storage Ring reached 100 mA and 1.5 GeV. 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting
8
Wojciech Kitka, 30th Tango Collaboration Meeting
Solaris status (3) May 2016: - first experiments on UARPES beamline. 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting
9
Wojciech Kitka, 30th Tango Collaboration Meeting
Solaris status (4) June 2016: - electrons in Storage Ring reached 400 mA and 1.5 GeV, - lifetime: 100 min 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting
10
Wojciech Kitka, 30th Tango Collaboration Meeting
People Krzysztof, Piotr Ga. Machine Protection System Personal Safety System Building Management System Michał, Piotr K. IT infrastructure and services Help-desk Łukasz Ż. (MAX-IV), Łukasz D. (50%), Wojciech (50%), Grzegorz (50%), Krystian (50%) Control system software Outsorced Tango and students software development coordination Julia (PhD. student in IT, 30% of time) General software development Database applications Ada, Arek, Maciek (CERN) (diagnostic group) High level software Diagnostic instumentation Tadeusz Information and data sources management Piotr Go. Coordination Virtual accelerator Students non-critical tasks GUIs helper tools 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting
11
Control System at Solaris (1)
3 instances of Tango: - one for a linac and a storage ring, - one per each of two beamlines. 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting
12
Control System at Solaris (2)
CS upgrade in December 2015 (only for the machine): - Tango 8 -> Tango 9 - CentOS 6.5 -> CentOS 7 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting
13
Control System at Solaris (3)
Tango Community tools in Solaris: Tango 9 (machine) / Tango (beamlines), Taurus, HDB/TDB/SNAP/Bensikin/Mambo, Sardana, Device servers, … 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting
14
Wojciech Kitka, 30th Tango Collaboration Meeting
Status summary Commisioning stage The machine is integrated Integration of beamlines Preparation for users Challenges: Small team Some technical issues: crashes of DS for Danfysik power supplies 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting
15
www.synchrotron.pl References: Thank you!
Special credits to Darren Spruce and the whole MAX-IV KITS group
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.