Download presentation
Presentation is loading. Please wait.
1
Fence Building Activity
In todays activity your assignment is to build one side of a 12 foot fence. In building your fence you will set your fence post 1 yard apart. You will be using Cedar fence posts and cedar rails. The cost of the fence posts is $10 apiece. The rails are $5 each.
2
In your project consider how many posts are needed as well as the number of rails. You will be using the Problem Solving Model that we have discussed in previous projects.
3
In your groups, gather information and data to answer the problem solving process. You will be preparing a PowerPoint presentation to share with the class, presenting your solution. The following information will be included in your presentation. Understanding the problem: What data or information do you need? What is unknown? What are the conditions? Plan the solution: Draw a diagram of the fence you are planning to build. Using your plan: Show your plan for solving this problem. Carry out your plan: Using your plan, show your work and your solution. Review and discuss your solution. Reflect on your solution.
4
Be Prepared to share your presentation with the class.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.