Download presentation
Presentation is loading. Please wait.
1
Latency of EMIR in Multi-Tier Deployment
Shiraz Memon, Jülich Supercomputing Center EGI Technical Forum Prague,
2
TIS Workshop, EMI TF 2012, Prague
Outline Test Plan Network Deployment System Environment Latency Graphs 20/09/2012 TIS Workshop, EMI TF 2012, Prague
3
TIS Workshop, EMI TF 2012, Prague
Test Plan Four EMIR nodes, connected to form a four tier hierarchy Synchronised from single NTP Server Three tests with number of Registrations: 1K, 10K, 100K 25 Concurrent Clients Propagate POST event onto the root node Goal Latency Measurement of propagation of individual records between tiers For every registration request -> Latency = Time of the Request Sent – Current Time 20/09/2012 TIS Workshop, EMI TF 2012, Prague
4
TIS Workshop, EMI TF 2012, Prague
Network Deployment DSR emiregistry1.grid.niif.hu DSR vm-117.alamo.futuregrid.org DSR emiregistry2.grid.niif.hu DSR vm-116.alamo.futuregrid.org 25 Concurrent Clients 20/09/2012 TIS Workshop, EMI TF 2012, Prague
5
System Environment Details
vm-116 and vm-117 on FutureGrid CentOS 5 2 GB RAM 8 GB HDD JVM Heap Size 1 GB EMIR v1.2.0, MongoDB emiregistry1 and emiregistry2 on Hungarian Cloud SL5.5 497 MB JVM Heap Size 256 MB 20/09/2012 TIS Workshop, EMI TF 2012, Prague
6
Latency of 1K Registrations
20/09/2012 TIS Workshop, EMI TF 2012, Prague
7
Latency of 10K Registrations
20/09/2012 TIS Workshop, EMI TF 2012, Prague
8
Latency of 100K Registrations
20/09/2012 TIS Workshop, EMI TF 2012, Prague
9
TIS Workshop, EMI TF 2012, Prague
Questions? 20/09/2012 TIS Workshop, EMI TF 2012, Prague
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.