Design and Construction of Composite Lined Landfills
By Blackstone Environmental
2
Site Survey
3
Site Survey
4
Grading Plan Cell Boundary- survey, topo, as builts of adjacent cells
Existing liner tie-in Match top of clay and top of rock elevations Sumps or Gravity Drain of Contact water Contact water removal plan for the site Side slopes Floor
5
Grading Plan
6
Grading Plan
7
AutoCAD 2014 Civil 3D Cut/fill volumes Stormwater calculations
DWGs for contractors
8
Typical Composite Liner Detail
9
Side Slopes Max 3:1 slopes on side walls
Anchor trench needed above slope to anchor liner down
10
Side Slopes
11
Anchor Trench
12
Sumps Collection and removal of contact water Risers and pumps
Gravity drained pipe system Contact water can be put back into the landfill
13
Sumps
14
Sumps
15
Risers
16
Risers
17
Pump on wheels
18
Contact Water Removal Lines
Perforated HDPE or PVC pipe in sump Non-perforated outside of cell Pressure test for tightness Measure and test contact water flow for use in post closure certification
19
Geomembrane HDPE QC by vendor QA by Blackstone
Seam verification testing every 500’ Seams are lab verified
20
Panel Diagram
21
Final Grading Plan
22
Final Grading
23
Final Design Construction Drawings
Professional survey (if applicable) Existing Conditions Proposed Site Layout Proposed Grading Plan Stormwater Management Plan Typical Liner Details Misc. Details Proposed Final Cover Layout and Grading
24
Landfill Features
25
Geosynthetic Clay Liner (GCL)
Bentonite encased in fabric that expands when wet; permeability of < 1x10-9 cm/sec Can replace up to 12” of compacted clay liner in Kansas Polymer encapsulated GCL now developed for CCB landfills to reduce cation exchange capacity potential
26
Clay Placement on Subgrade
27
Underdrain Construction
28
Clay Liner tie in to adjacent cell
29
Storm Water diversion berm
30
Leachate Rock Spreading
31
Liner Termination Berm
32
Completed Leachate Pond
33
Riser Penetration through FML
34
FML Installation
35
Leachate Collection line penetration
36
Riser and Sump
37
Sump for Pump on rollers
38
Fusion Seaming
39
Air Test on Fusion Seam
40
Welding
41
Welding
42
Leachate Pond