1 2012 Environmental Symposium Opening Address
Naval Air Station Jacksonville 2012 Environmental Symposium Opening Address 17 August 2012

2 Naval Air Station Jacksonville
Third largest naval installation in the United States OLF Whitehouse NAS Jacksonville Yellow Water Housing Rodman Lake George Pinecastle

3 2012 Recognitions Department of Defense Award for Best Naval Installation in the World Secretary of Navy and EPA Energy and Water Conservation Awards United Nations “Earth Trustee” Award

4 Wastewater Reuse Project
Purple pipe from dechlorination chamber to reuse pond Zero discharge to St Johns River by 2014

5 Florida Building Code Sound Attenuation Measures
First State in Nation to include sound attenuation measures in new construction around civilian and military airports based on Jacksonville ordinance change

6 P-8A Training Facility Project Description:
Contractor Whiting Turner Contracting Co. Award Date Sept 2009 Completion Date Aug 2011 Contract Value $47.7M % Complete 84% Project Description: Two story, 165,665 SF integrated training facility for P-8A State of the art facility: 10 Operational Flight Trainers, 8 Weapons Tactics Trainers, 4 Part Task Trainers, Instructional and administrative spaces. LEED Features: Projected, pre-certification (LEED Gold) Characteristics include: Rain harvesting for plumbing, High efficiency mechanical equipment, No potable water irrigation, Photo-voltaic panels over parking lot, plus many other energy saving features Slide owner: KL 6

7 Conservation Measures
Energy and Water Conservation Measures Old Lighting Status: Construction Ongoing Award Date Sep 2009 Completion Date Jun 2011 Contract Value $17.2M % Complete 99% New Lighting Project Description: Install new lighting, urinals and toilets, valves, pumps, etc. to provide energy improvements and reduce water usage. Total of 33 separate facilities. Slide owner: KL Status: Day lighting, Water conservation, UV Lighting, and Lighting installations are complete. Contractor is completing solar water system installation on five roofs. 7

8 Aviation Survival Training Center
Status: Complete Award Date Sept 2009 Completion Date Sept 2010 Contract Value $1.1M Project Description: Install Solar Thermal (168) Flat Plate Collectors. Installation of (6) Natural Gas Infrared Heaters for pool area. Demo Existing Heating Equipment. Status: Producing in excess of 1 Mbtu/hour, heating the pool and providing domestic hot water showers and sinks Pool, shop areas and drying room heaters are installed. Slide owner: KL 8

9 Solar Powered Vehicle Over 80 electric vehicles

10 Sustainability through Partnerships