Download presentation
Presentation is loading. Please wait.
1
A studio to shoot action movies
The Netherlands Free Electron Laser Infrastructure for Soft X-rays A studio to shoot action movies of the nanoworld Ronnie Hoekstra 1
2
launch platform @Science Park Amsterdam University of Groningen
Start October 2014 Research on EUV generation and its interaction with matter Co-funded by ASML, FOM/NWO, and the Amsterdam Universities University of Groningen national Top+ research institute Research on advanced materials nanophysics Only non-US institute in top 10 of nanophysics institutes collaborations/contacts/…. established within the initiative ( ) Oct 2016: FEL-NL on Large Scale Facilities Agenda of the KNAW Royal Netherlands Academy of Sciences
3
how to shoot molecular action movies
Pump = light, electron, chemical reaction hydrogenation, ….. action spectroscopy Gaffney and Chapman Science. 316 (2007) 1444 reconstruction single-shot image object coherent imaging probe pump
4
ultrastrong pulsed laser
generic “camera” specs ultrastrong pulsed laser in the soft-X-ray /XUV Free Electron Laser nanometer resolution ultrashort (fs) flashes ultrabright, coherent source LCLS / EU-XFEL / SwissFEL / SACLA /……….. FEL-NL FELIX EUV nanolithography water window / molecular biology absorption edges materials e.g. magnetism 4
5
Summary of FEL-NL specs
FEL-NL parameters and motivation 1 – 15 nm Soft X ray – EUV (photon interactions E-3) advanced materials, biophysics (water window), catalysis, light-matter interactions, ……….. spectroscopy, reaction microscopy, nanoscale coherent imaging 1 – 5kHz single-pulse pump-probe spectroscopy: 1-10 fs; maximum measurement rate 1 – maybe up to 5 kHz. external HHG seeding pulse-to-pulse stability, reproducibility and control tunable polarization magnetic and chiral systems X band accelerator + low emittance source compact < 100 m low bunch charges pC 5
6
time schedule Time schedule Yr 1 baseline design
organisational scaffolding Yr 2 sub-unit design building site Yr 3 full machine design building construction Yr 4 building infrastructure Yr 5 start commissioning infrastructure Yr 6 commissioning machine Yr 7 first soft-X-ray lasing Yr 8 user operation
7
The Netherlands X band perspective
team up with start Dutch X-band research cluster feasibility and limits of a X band accelerator driven soft X ray FEL Jom Luiten –TU/e tunable hard X-rays for material and medical applications dark matter VDL-ETG Eindhoven
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.