2 Contents Update Step IV Papers CM43
2 August 2015 Contents Update Step IV Construct/commission/operate/analyse Papers CM43

3 2 August 2015 Spokesman’s update Update

4 Step IV commissioning status
All instrumentation commissioned: Data taking interleaved w/ magnet commissioning Upstream solenoid: Commissioned to full current (+2%); Issue of earth leakage in dump trays addressed: Replaced electrical isolation/termal contact DL electrical team (S. Griffiths et al): Example of excellent support for MICE from DL Focus coil: Unexpected thermal behaviour close to operating temperature: Evidence of dependence of thermal load on vacuum conditions inside warm bore Warmed up to replace frozen gasses: Gas-cleaning carried out Now cooling down once more (Re)Engagement with TESLA: TESLA ready to engage with debugging of magnet in the channel Ideas (subset): Attempt to improve cooling performance by: (Re)Adjustment of pressure in cryocooler hoses; Increase in torque on cold-head bolts Will find out soon!

5 Downstream solenoid Failure of LTS lead serving M1 of SSU:
M1 open circuit: Break in LTS lead at fead-though to cold mass Damage to LTS-lead-protection resistor E1-C-E2 and M2 appear undamaged: Working towards putting current into M2: A critical test Step IV programme: Analysis Group: Optics derived to deliver principal aspects of Step IV: Albeit at reduced current Work in progress

6 Support for commissioning
Clear need to increase support for commissioning Team effort; access to all relevant skills Practical steps: Magnet support team: Lead: Josef Boehm (TD) Team: TB, VB, SW, MC, MT, SG, TH, ... and support from ISIS electrical Mechanical: Hall team Operations/commissioning: Strengthen liaison/coordination: Paul Hodgson/Victoria Blackmore

7 2 August 2015 Spokesman’s update Step IV

8 Cycles 2015/02 to end September
2 August 2015 Cycles 2015/02 to end September Excellent support for magnet training from shift crews Some data taking interleaved with magnet commissioning: Data sets to end September 2015

9 Event display Original version from V. Blackmore
Development from A. Dobbs Development of the MICE event display as an anlyis tool taken on by Belgrade Group: Has already proved valuable in debugging tracker geometry I believe will be essential tool going foward

10 10 Spokesman’s update Papers

11 Work organised; review progress at CM43
2 August 2015 EMR paper being prepared for submission to JINST Pion contam: paper draft circulated to the collaboration Work organised; review progress at CM43 Draft in preparation; Wise people: Ronald, Ryne Draft assembled! Draft under review in the EMR group Draft at advanced stage: issue in track-fit being debugged Draft being assembled. Completion of Step I in good shape. Pressure! Cooling demo paper …

12 2 August 2015 Spokespersons update CM43

13 2 August 2015