26 – Wastewater Conveyance System Design 2
April, 25, 2013 Professor Doran CEE 410
2
CEE 410
3
CEE 410
4
Separate handling, treatment and reuse of: Blackwater Greywater
Yellow-water CEE 410
5
Learning goals for today are to improve understanding of:
Force Main Design Structural Considerations for Sewer and Force Main Construction Review of Drawing Notations for Sewer and Force Main Construction Team Design Time
6
Learning goals for today are to improve understanding of:
Force Main Design Structural Considerations for Sewer and Force Main Construction Review of Drawing Notations for Sewer and Force Main Construction Team Design Time
7
Learning goals for today are to improve understanding of:
Force Main Design Structural Considerations for Sewer and Force Main Construction Review of Drawing Notations for Sewer and Force Main Construction Team Design Time
8
Learning goals for today are to improve understanding of:
Force Main Design Structural Considerations for Sewer and Force Main Construction Review of Drawing Notations for Sewer and Force Main Construction Team Design Time for Design Project B
9
Key Force Main Design Concepts
Hydraulics Layout Installed Depth
10
Key Force Main Design Concepts
Hydraulics Layout Installed Depth Materials Utility Crossings Stream Crossings
11
Key Force Main Design Concepts
Static Head Normally Discharge Elev – Maximum Operating Level in Pump Station (not emergency) Force Main Hydraulics
12
Key Force Main Design Concepts
Static Head Normally Discharge Elev – Maximum Operating Level in Pump Station (not emergency) BUT – intermediate conditions (high point along route) may control Force Main Hydraulics
13
Key Force Main Design Concepts
Static Head Normally Discharge Elev – Maximum Operating Level in Pump Station (not emergency) BUT – intermediate conditions (high point along route) may control Design Velocity 2.0 – 5.0 ft/s (0.60 – 1.5 m/s) Force Main Hydraulics
14
Key Force Main Design Concepts
Use standard pipe sizes Long-radius bends, wyes preferred over standard bends and tees Hazen-Williams normally used C ~ 120 for Ductile Iron; C ~ 130 for PVC or HDPE Force Main Hydraulics
15
Key Force Main Design Concepts
Equivalent length normally computed to include pipe length together with bends, tees, valves Minor loss calculations normally only used for entrance (pump suction) and discharge (at end of main), and reduction and expansion fittings Force Main Hydraulics
16
Key Force Main Design Concepts
Force Main Hydraulics
17
Key Force Main Design Concepts
Force Main Hydraulics
18
Key Force Main Design Concepts
Force Main Hydraulics
19
Key Force Main Design Concepts
Air Release Valve at High Points in Force Main Force Main Hydraulics
20
Key Force Main Design Concepts
Air Release Valve at High Points in Force Main Force Main Hydraulics
21
Structural Considerations
16,000 lb (7,260 kg) Structural Considerations
22
Structural Considerations
Failure Load Allowable Load = LF(Failure Load) Structural Considerations
23
Structural Considerations
Marston’s “C” H/B For Flexible Pipes (DI, Plastic): W = C ω BD where, W = Dead load due to backfill (kN/m), C = A dimensionless coefficient, ω = Unit weight of the backfill soil (kN/m3), B = Width of the trench at the crown of the pipe (m), and D = Pipe Diameter (m) Structural Considerations
24
Structural Considerations
Need to add Live Load and Superimposed Load Marston’s “C” H/B For Flexible Pipes (DI, Plastic): W = C ω BD where, W = Dead load due to backfill (kN/m), C = A dimensionless coefficient, ω = Unit weight of the backfill soil (kN/m3), B = Width of the trench at the crown of the pipe (m), and D = Pipe Diameter (m) Structural Considerations
25
Structural Considerations
26
Structural Considerations
F = 2PAcos45° F = PA F = PA Structural Considerations
27
Structural Considerations
F = 2PAcos45° F = PA F = PA For 12-in Dia Pipe with P = 100 psi F = 2(100 lbf)π62(sq in)(0.707) (sq in) F = 16,000 lbf Structural Considerations
28
MH Numbering Drawing Nomenclature
29
MHA1a MHA1b 325 LF 8-in San 305 LF 8-in San MHA1c Drawing Nomenclature
30
Drawing Nomenclature Table of Manhole Gravity Sewer Connections MH No.
North East South West A1a NA 8-in IE A1b IE IE A1c IE IE A1d Note: Compass directions are approximate; see drawings. Drawing Nomenclature
31
Drawing Nomenclature 6-in FM c El 6472.50 L 806 LF 6-in FM
22 ½ deg EL c El L 6-in FM 45 deg EL c El L Drawing Nomenclature
32
H2S + 2 O2 H2SO4 Drawing Nomenclature
33
H2S + 2 O2 H2SO4 Drawing Nomenclature
34
Typical Submersible Pump Sta
35
Typical Submersible Pump Sta