WELD POLYETHYLENE (PE) PIPE USING FUSION METHOD
James Langston south west Tafe page
2
James Langston south west Tafe page
What do I have to do • Prepare for work • Determine welding requirements • Weld and pressure test pipes • Clean up. James Langston south west Tafe page 293 and /1
3
James Langston south west Tafe page
Introduction Fusion welding requires the ends of the pipes to be heated until the plastic becomes molten, and holding the joints in contact as they cool and solidify. James Langston south west Tafe page /2
4
James Langston south west Tafe page
Polyethylene pipes • PE80B – MDPE (medium density polyethylene) • PE80C – HDPE (high density polyethylene) • PE100 – HPPE (high performance polyethylene) James Langston south west Tafe page /2
5
Thermal properties of polyethylene
Expansion Thermal conductivity Temperature effects on pipes James Langston south west Tafe page /1
6
Fusion welding methods
James Langston south west Tafe page /4
7
James Langston south west Tafe page
Butt welding /4 James Langston south west Tafe page
8
Electro fusion welding
James Langston south west Tafe page /4
9
Heated tool socket welding
James Langston south west Tafe page /4 and 298
10
James Langston south west Tafe page
General conditions Weather conditions will effect the weld Protect the weld area Check the temperature Clean the heating element Planning and subsequent checking James Langston south west Tafe page 299 1/1
11
Check the wall alignment and gap
misalignment on the outside must not exceed 10% of the thickness of the wall. James Langston south west Tafe page /3
12
Setting the fusion pressure
FA = Pressure to make joint FB = Pressure required to move the pipes together plus machine resistance FA + FB = jointing force James Langston south west Tafe page /3
13
James Langston south west Tafe page
Joint and cool Leave parts in the fusion jointing machine at fusion pressure until the end of the cooling period. James Langston south west Tafe page /3
14
Carrying out the pressure test
All fusion joints must be allowed to cool completely before pressure testing. Note All pipes to be tested as stated in AS3500 James Langston south west Tafe page /4
15
Heated tool socket fusion method
the pipe end is inserted into the socket The pipe end and fitting socket are heated to fusion temperature (276° C ± 5° C) and are then pushed together. James Langston south west Tafe page /4
16
James Langston south west Tafe page
Tools required James Langston south west Tafe page /4
17
Pipe peeling and chamfering tool
removes the oxidised layer built up as a result of UV radiation, James Langston south west Tafe page /4
18
Fusion jointing machine
James Langston south west Tafe page /2
19
Preparation for fusion jointing
The fusion temperature must be between 250°C and 270°C. Cut and deburr pipe Peel the pipe Clean the pipe with cleaner or trichoroethane James Langston south west Tafe page /2
20
Fusion jointing procedure
James Langston south west Tafe page /1
21
Butt fusion time cycles
James Langston south west Tafe page /1
22
James Langston south west Tafe page
Regulations Conforming with workplace operations and procedures. Understanding the operating principles of reticulation systems. Ensuring the quality of materials used. Controlling handling procedures. Using and maintaining equipment. Paying attention to specifications. James Langston south west Tafe page /2
23
James Langston south west Tafe page
Regulations Plumbers or gasfitters are required to use only approved materials They must comply with the installation requirements of AS3500 health hazards can result if their installation practices are outside the guidelines of AS 3200 James Langston south west Tafe page /2
24
James Langston south west Tafe page
OH&S • personal protective clothing and equipment • use of tools and equipment • workplace environment and safety • hazard control James Langston south west Tafe page Page307 to 311
25
Butt fusion welding process
• Clean pipe ends and heater faces • Square the two opposite pipe ends. • Check pipe end alignment in clamps. • Verify proper heater temperature. • Insert heater plate between opposite pipe ends use only enough force to maintain contact. James Langston south west Tafe page /1
26
Butt fusion welding process
• Heat as required, allowing for weather . • Remove heater plate and bring the heated pipe end together quickly, being careful not to slam, Apply sufficient pressure to form a ‘double rollback bead’. • Maintain pressure while allowing the joint to cool. • Allow joint to cool an additional five minutes prior to removing joint from fusion jig. • Inspect joint for quality. James Langston south west Tafe page /1
27
James Langston south west Tafe page
Questions 1 1. Name the group of plastics that polyethylene belongs to. James Langston south west Tafe page /3
28
James Langston south west Tafe page
Question 2 State three types of polyethylene pipe used for plumbing services. (a) (b) (c) James Langston south west Tafe page
29
James Langston south west Tafe page
Question 3 3. Name three types of fusion welding processes. (a) (b) (c) James Langston south west Tafe page
30
James Langston south west Tafe page
Question 4 Briefly describe butt welding of polyethylene pipe James Langston south west Tafe page
31
James Langston south west Tafe page
Question 5 Briefly describe socket fusion welding of polyethylene pipe. James Langston south west Tafe page
32
James Langston south west Tafe page
Question 6 State two minimum requirements for fusion jointing of polyethylene pipe. (a) (b) James Langston south west Tafe page
33
James Langston south west Tafe page
Question 7 7. When should you protect the fusion area when you are welding polyethylene pipe? James Langston south west Tafe page
34
James Langston south west Tafe page
Question 8 8. State the temperature that you complete fusion jointing of polyethylene pipe. James Langston south west Tafe page
35
James Langston south west Tafe page
Question 9 How do you clean the heating element of a fusion welding tool? James Langston south west Tafe page
36
James Langston south west Tafe page
Question 10 State five requirements for correct technique for fusion welding of polyethylene pipe. (a) (b) (c) (d) (e) James Langston south west Tafe page
37
James Langston south west Tafe page
Question 11 List two points for the inspection of a fusion weld. (a) (b) James Langston south west Tafe page
38
James Langston south west Tafe page
Question 12 State the temperature required for a successful socket fusion weld. James Langston south west Tafe page
39
James Langston south west Tafe page
Question 13 Outline the requirements after the fusion welding requirements are completed. James Langston south west Tafe page
40
James Langston south west Tafe page
Question 14 State where off cuts and leftovers should be placed on the site. James Langston south west Tafe page