Presentation is loading. Please wait.

Presentation is loading. Please wait.

ICANN60 Abu Dhabi – GAC Planning Timeline

Similar presentations


Presentation on theme: "ICANN60 Abu Dhabi – GAC Planning Timeline"— Presentation transcript:

1 ICANN60 Abu Dhabi – GAC Planning Timeline
GAC Travel Support Application closes for Abu Dhabi 1st week of Sept 15 July 5 Oct 7 Oct Agenda Setting calls 30 September 30 August 30 June ICANN59 Minutes circulated to GAC Draft agenda circulated to GAC Consolidation of documents and drafts reviewed by GAC Chair All briefing documents sent to the GAC 10 July 15 Sept 28 October to 3 November 2017 To adjust the length and width of the arrow, click on the arrow, grab a corner, and lengthen or shorten, depending on your preference. To add a bubble, click on the bubble, ensure it is fully highlighted, COPY and PASTE. Then drag the bubble to your preferred placement. To delete a bubble, click on the bubble, ensuring it is highlighted and click DELETE. If you make a mistake, go to your top bar on PP and click EDIT, UNDO Preparation for briefing documents


Download ppt "ICANN60 Abu Dhabi – GAC Planning Timeline"

Similar presentations


Ads by Google