1 ELCITA UPDATE JULY 2017

2 Smart City Project Initiatives for Test bed
77 Nos of Modified Street light poles have been erected on Infosys Avenue & Pump house road.

3 Smart City Project Initiatives for Test bed 2
Installation of OLT & FMS & Laying of 48 core cable with duct – Completed.

4 Estate Management Modification of existing street light poles with LED lights, Splitters, Camera, Advertisement Board, etc West Avenue 1 –Infosys avenue - 17 West Avenue 7 – Teknic to Wipro Gate West Avenue 8 – Pump house Road - 31 West Avenue 9 – Petrol Bunk Road – 18 E – Toilets 20 e-toilets Installed & Operational

5 Smart City Project Initiatives for Test bed
M/s Wipro Ltd are the integrated partner for Smart City Interface.

6 LOCATION MAP FOR RELOCATING SKYWALK FROM HP to ELECTRONICS CITY SIGNAL (from West Phase to East Phase)

7 DETAILED DRAWING FOR RELOCATING SKYWALK FROM HP to ELECTRONICS CITY SIGNAL (from West Phase to East Phase)

8 Asphalting - Pump house Road (West Avenue 8).
Road Work – Completed Asphalting - Pump house Road (West Avenue 8).

9 Construction of Concrete Road at Pump house
Road Work – Completed Construction of Concrete Road at Pump house

10 Asphalting – Kssiddc Complex Internal Road.
Road Work – Completed Asphalting – Kssiddc Complex Internal Road.

11 Road Marking (Electronics City)
Road Marking Work – Completed Road Marking (Electronics City)

12 West Phase Electronics City
Pot Hole Filling Work – Completed West Phase Electronics City

13 Supply & Fixing DG & RCC Bed Flooring for DG (300 KLD STP)
Supply & Fixing DG & CC Flooring – Completed Supply & Fixing DG & RCC Bed Flooring for DG (300 KLD STP)

14 Junction Improvement (West Avenue 8).
Electrical Work – Completed Junction Improvement (West Avenue 8).

15 Road Widening (West Avenue 6)
Road Widening Work – Completed Road Widening (West Avenue 6)

16 Road Widening Work – Under Progress
Y Junction (East Phase) Road Widening (East Avenue 1)

17 Kerbstone Painting– Under Progress
West Avenue 8 West Avenue 4

18 Footpath Works – Under Progress
RCC drain & Footpath– West Avenue 6 RCC drain & Footpath (BHEL side)– West Avenue 1

19 New Street Light Pole (East Avenue 1)
Street Light Fixing– Under Progress New Street Light Pole (East Avenue 1)

20 Fabrication Work – Under Progress
Barbide wire Fencing for Trespassers – West Avenue 1 (Near Toll Plaza) Providing MS Railing for pedestrian safety – West Avenue 1 (Near NTTF)

21 Footpath – Completed West Lane 12 (Arvind Mills)
HP Avenue (West Avenue 5)

22 Footpath & RCC Pedestal– Completed
RCC Drain & Footpath (East Avenue 2) RCC pedestal for Street light Pole (West Avenue 2)

23 Construction of 7KLD STP ESBR Technology at ELCITA office
7 KLD STP– Completed Construction of 7KLD STP ESBR Technology at ELCITA office

24 Contract Awarded Providing and laying of Asphalting using 60/70 grade bitumen from Edizi Tools to TCS gate no 3 via Y-Junction, (East Avenue 1& 4). East Phase

25 Tender Published Replacing Existing 6 Way old type MEI make conventional type RMU by 6 Way Compact type Schneider RMU DAS specification for F-5 Feeder Eminating from Keonics Muss near M/s BHEL Ltd, Electronics City West Phase, Bangalore Providing and Laying Asphalting grade bitumen from 3m Junction to Petrol Bunk Junction, West Lane 6 and West Avenue 9, Electronics City West Phase, Bangalore Providing & Laying Asphalting grade bitumen along West Lane 7, 8,9 and 10, West Avenue 11 Electronics City West Phase, Bangalore Providing & Laying Asphalting grade bitumen from Konar to KPTCL, West Avenue 3 and 5 Electronics City West Phase, Bangalore Providing & Laying Asphalting grade bitumen along East Avenue 5 Electronics City West Phase, Bangalore

26 Contracts on Anvil Providing House Keeping Services to ELCITA within e-city Industrial Township Area. Providing Services for Solid Waste Management  to ELCITA within e-city Industrial Township Area. Shifting of Pole, Erecting of Spun Pole, Relocation of Transformer & Raising of Transformer by installing new Spun Pole for Junction Improvements at 3m & BHEL Side, Electronics City West Phase, Bangalore 4.Construction of 400 KLD STP in KSSIDC Land, West Phase. 5. Construction of 500 KLD STP in KIADB Land, East Phase.

27 Thank You