I-15 North Phase IV Project I-15 /CC-215 Northern System to System Interchange
2
Existing Interchange CC 215 Single bridge I 15
The project is located between Lamb Blvd and Speedway Blvd in the vicinity of North Las Vegas
3
Proposed Project Ends Begins Ends
4
Scope of Project 9 New Bridges Widening of Existing Bridge
Retention Walls New Ramps Detailed TC Drainage Analysis Geotechnical Study
5
Impacted Interchanges and Structures
I 15/I-215 Northern System to System Interchange Lamb Boulevard Speedway Boulevard UPRR Crossing
6
Executive Summary Recommendation
Complete the 60% Design Plans by the end of Summer 2013 and depending on funding continue work
7
Complete 60% Design Recommendation Advantages
Identify Funding for Construction Identify Funding for Utility Relocation Identify/Resolve Major Project Risks Define the Delivery Method Perform Geotechnical Analysis Provide Flexibility for Delivering small Packages
8
Project Status The EA was Approved by the FHWA on May 2007
Phase I was completed on 2010 though Design-Build Project from the Spaghetti Bowl to Craig Road Phase II is from Craig Road to Speedway Boulevard
9
Project Status Phase III is from Speedway Boulevard to Apex interchange This is the Phase IV of the I 15 North Corridor improvements. The project is currently at the 20% Design with an estimated cost between $135 M to $145 M.
10
Budget and Funding Fund Description Total (Million ) Federal (Million)
(95%) State (Million) (5%) HY1 High Priority, SAFETEA-LU $1.8 $1.7 $ 0.1 HY2 $ 0.4 $ 0.3 LY1 $ 1.8 $ 1.7 LY2 $ 2.6 $ 2.5 TBID To Be Identified $ 136.6 $ 129.8 $ 6.8 TOTAL $143.2 $136.0 $7.2
11
I-215 (exact start point) Northbound Southbound
12
US-95 (exact end point)
13
Schedule
14
Budget Total Cost is $80.5 million
Possible Safety Funds between 2 to 5 million