Distributed Generation A Cooperative View
Greg White Old Dominion Electric Cooperative
2
Distributed Generation Cooperative History
1980’s CD Manufacturer Diesel 1980’s North Anna Hydro 1990’s Freddie Fix Hydro 2001 Fuel Cell 2002 Old Dominion Diesels
3
Fuel Cells $7,500 for a 2 KW unit $4,000 water purification unit
Equals $5,750 / KW 30 cents per kwh operating cost
7
Diesels $700 K for a 1,850 KW unit Equals $380 / KW
7 cents per kwh operating cost
9
Old Dominion Diesels Reliability Transmission Congestion
10
Interconnection Fundamentals
Safety Reliability
11
Interconnection Issues
The “Agreement” Commission proposed regulations Legislative policy