Download presentation
Presentation is loading. Please wait.
1
No Job is too Big for Servpro
Storm Teams and Large Loss Units History and Background Fire & Water – Cleanup & Restoration™
2
Ready Response Resource List
Who We Are Ready Response Resource List SERVPRO’s Large Loss Response Team has committed the following resources to immediately respond to your loss site. A vast supply of additional such resources are also available within 4 hours via our corporate headquarters in Nashville, Tennessee. Qualified Personnel Following is a list of SERVPRO trained business owners and managers with a combined 50 years of large loss restoration experience. This team is second to none in providing effective, cost efficient cleaning and restoration services on large losses regardless of size, scope or location. Large Loss Coordinators 5 Large Loss Superintendents 10 Work Crew Supervisors 39 Production Technicians 186 Over 40 of providing large loss services Provide Well trained Technicians for every loss. We have over 1,500 Franchises in the United States All Work complies with IICRC standards
3
Equipment The following physical resources are warehoused and maintained in our restoration centers located throughout Georgia (and other equipment is located in the continental U.S.) At a moments notice, ALL of these resources will be on our moving vans and on their way to your loss site. High Velocity Air Movers (HVAMs) 5,373 Dehumidifiers 1,610 Negative Air/Air Scrubber Units 620 Truck mounted Extraction Units 112 Portable Extraction Units 49 Enclosed Utility Vehicles 266 HVAC Duct Cleaning Systems 22 Thermo-Fog Neutralization Units 48 Ozone Neutralization Units 65 Moving Vans 53 Self contained power generators 49 Upholstery Machine 48 Warehouse Space 347,516 SF
5
Storm Team Resources Servpro has a Distributor network that can call teams from all over the country in to respond Teams on the ground within 24 hours. Ga. Teams have responded to every hurricane over the past 20 years along with other national disasters
6
Pentagon 1.8 million gallons of water due to burst pipes
565,000 sq. ft. and 17 miles of hallway Dry in 7 days Post 9/11…fire clean up, mold, and extraction…90 days
7
The Pentagon
8
Wal-Mart Distribution Center
Summer inch water main burst and washed away part of foundation Happened at 10 am, access by 3am, full production in a few days Center services 6 states. Inventory storage area affected therefore filling orders was prevented.
11
Stone Mountain 3 storm teams
Floods affected the Park, Marina, and 17 other affected structures. Had park back up and running prior to huge revenue producer, October Fest Adjuster from job still recommends us based on expediency and documentation.
12
Water Line in Stone Mountain
13
Stone Mountain
14
Roosevelt Rehabilitation Center
Diabetes Rehab center that services patients from all over in Warm Springs Sewage backed up from storm Main floor where 90% of rehab occurs was affected Ready for full service in 7 days
17
Not too mention… Pinnacle Building Fox Theatre
Over 100 Churches in Georgia have been restored after fire and water disasters. The Capital Building in Atlanta The original Dwarf House Multiple high rises University of Louisville Over 150 flooded Base Housing units at Hanscom Air Force Base And Many More…….
18
Any Questions?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.