Download presentation
Presentation is loading. Please wait.
1
Northwest BeltLine Connector
Neighborhood Meeting July 11, 2017 KAIZENCOLLABORATIVE
2
PATH Foundation 501(c) 3 Non Profit
Public-private partnerships with State, Counties, and Cities Private Sector Partner facilitates fundraising and fast tracking
3
26 Years at PATH Built over 260 miles of greenway trails.
Raised over $80 Million from private sector for trail development. Caused $130 Million to be allocated from public sector for trails.
4
Centennial Olympic Park
PATH 2025 Vision PATH 400 Silver Comet BeltLine Peachtree Battle Eastside Trail Westside Trail System Stone Mountain Centennial Olympic Park BeltLine Westside Trail Arabia Mountain Old Towne Conyers South River + Rockdale River Southtowne
5
NW BeltLine Connector
6
NW BeltLine Connector
7
NW BeltLine Connector
8
NW BeltLine Connector
9
NW BeltLine Connector
10
NW BeltLine Connector
17
Timeline PATH Along Northside Drive Spring 2018
Bridge & Underpass (GDOT) Summer 2019 PATH Along Woodward Way & Dellwood Drive Spring 2018
18
KAIZENCOLLABORATIVE Contact Ed McBrayer
1601 W. Peachtree Street, Atlanta, Georgia 30329 (404) KAIZENCOLLABORATIVE Greta deMayo, PLA 2390 Main Street, Tucker, Georgia 30084 (404)
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.