Linear Programming Models: Graphical and Computer Methods
2
Using Excel’s Solver for LP
Flair Furniture Example Other Examples Examples provided in the Excel LPExamplesFile
3
Using EXCEL Solver Setup the problem Determine the variables
Determine the solution cells Objective function coefficients Define the objective function Constraint coefficiants Coefficient equations (Left-Hand Side, LHS) Coefficient signs Coefficient constraint values (RHS)
4
the Flair Furniture Example:
Max 7T + 5C (profit) Subject to the constraints: 3T + 4C < 2400 (carpentry hrs) 2T + 1C < 1000 (painting hrs) C < (max # chairs) T > (min # tables) T, C > 0 (nonnegativity) Go to LPExamplesFile.xls
5
Flair Furniture EXCEL Ex.
See the example in the Excel LPExamplesFile.
6
Linear Programming Modeling Applications
7
Linear Programming (LP) Can Be Used for Many Managerial Decisions:
Product mix Make-buy Media selection Marketing research Portfolio selection Labor planning Shipping & transportation Blending Multiperiod scheduling
8
For a particular application we begin with
the problem scenario and data, then: Define the decision variables Formulate the LP model using the decision variables Write the objective function equation Write each of the constraint equations Implement the model in Excel Solve with Excel’s Solver
9
Product Mix Problem: Fifth Avenue Industries
Produce 4 types of men's ties Use 3 materials (limited resources) Decision: How many of each type of tie to make per month? Objective: Maximize profit
10
Resource Data Labor cost is $0.75 per tie Material Cost per yard
Yards available per month Silk $20 1,000 Polyester $6 2,000 Cotton $9 1,250 Labor cost is $0.75 per tie
11
Product Data Type of Tie Silk Polyester Blend 1 Blend 2 Selling Price
(per tie) $6.70 $3.55 $4.31 $4.81 Monthly Minimum 6,000 10,000 13,000 Monthly Maximum 7,000 14,000 16,000 8,500 Total material (yards per tie) 0.125 0.08 0.10
12
Material Requirements (yards per tie)
Type of Tie Silk Polyester Blend 1 (50/50) Blend 2 (30/70) 0.125 0.08 0.05 0.03 Cotton 0.07 Total yards 0.125 0.08 0.10
13
Decision Variables S = number of silk ties to make per month P = number of polyester ties to make per month B1 = number of poly-cotton blend 1 ties to make per month B2 = number of poly-cotton blend 2 ties to make per month
14
Profit Per Tie Calculation
(Selling price) – (material cost) –(labor cost) Silk Tie Profit = $6.70 – (0.125 yds)($20/yd) - $0.75 = $3.45 per tie
15
Objective Function (in $ of profit)
Max 3.45S P B B2 Subject to the constraints: Material Limitations (in yards) 0.125S < 1,000 (silk) 0.08P B B2 < 2,000 (poly) 0.05B B2 < 1,250 (cotton)
16
Min and Max Number of Ties to Make 6,000 < S < 7,000 10,000 < P < 14,000 13,000 < B1 < 16,000 6,000 < B2 < 8,500 Finally nonnegativity S, P, B1, B2 > 0 Go to Fifth Ave Industries in LPExamplesFile
17
Portfolio Selection: International City Trust
Has $5 million to invest among 6 investments Decision: How much to invest in each of 6 investment options? Objective: Maximize interest earned
18
Data Investment Interest Rate Risk Score Trade credits 7% 1.7
Corp. bonds 10% 1.2 Gold stocks 19% 3.7 Platinum stocks 12% 2.4 Mortgage securities 8% 2.0 Construction loans 14% 2.9
19
Constraints Invest up to $ 5 million
No more than 25% into any one investment At least 30% into precious metals At least 45% into trade credits and corporate bonds Limit overall risk to no more than 2.0
20
Decision Variables T = $ invested in trade credit B = $ invested in corporate bonds G = $ invested gold stocks P = $ invested in platinum stocks M = $ invested in mortgage securities C = $ invested in construction loans
21
Objective Function (in $ of interest earned)
Max 0.07T B G P + 0.08M C Subject to the constraints: Invest Up To $5 Million T + B + G + P + M + C < 5,000,000
22
No More Than 25% Into Any One Investment T < 0
No More Than 25% Into Any One Investment T < 0.25 (T + B + G + P + M + C) B < 0.25 (T + B + G + P + M + C) G < 0.25 (T + B + G + P + M + C) P < 0.25 (T + B + G + P + M + C) M < 0.25 (T + B + G + P + M + C) C < 0.25 (T + B + G + P + M + C)
23
At Least 30% Into Precious Metals G + P > 0
At Least 30% Into Precious Metals G + P > 0.30 (T + B + G + P + M + C) At Least 45% Into Trade Credits And Corporate Bonds T + B > 0.45 (T + B + G + P + M + C)
24
Limit Overall Risk To No More Than 2.0
Use a weighted average to calculate portfolio risk 1.7T + 1.2B + 3.7G + 2.4P + 2.0M + 2.9C < 2.0 T + B + G + P + M + C OR 1.7T + 1.2B + 3.7G + 2.4P + 2.0M + 2.9C < 2.0 (T + B + G + P + M + C) finally nonnegativity: T, B, G, P, M, C > 0 Go to International City in LPExamplesFile
25
Labor Planning: Hong Kong Bank
Number of tellers needed varies by time of day Decision: How many tellers should begin work at various times of the day? Objective: Minimize personnel cost
26
Total minimum daily requirement is 112 hours
Time Period Min Num. Tellers 9 – 10 10 10 – 11 12 11 – 12 14 12 – 1 16 1 – 2 18 2 - 3 17 3 – 4 15 4 – 5 Total minimum daily requirement is 112 hours
27
Full Time Tellers Work from 9 AM – 5 PM Take a 1 hour lunch break, half at 11, the other half at noon Cost $90 per day (salary & benefits) Currently only 12 are available
28
Work 4 consecutive hours (no lunch break)
Part Time Tellers Work 4 consecutive hours (no lunch break) Can begin work at 9, 10, 11, noon, or 1 Are paid $7 per hour ($28 per day) Part time teller hours cannot exceed 50% of the day’s minimum requirement (50% of 112 hours = 56 hours)
29
Decision Variables F = num
Decision Variables F = num. of full time tellers (all work 9–5) P1 = num. of part time tellers who work 9–1 P2 = num. of part time tellers who work 10–2 P3 = num. of part time tellers who work 11–3 P4 = num. of part time tellers who work 12–4 P5 = num. of part time tellers who work 1–5
30
Part Time Hours Cannot Exceed 56 Hours
Objective Function (in $ of personnel cost) Min 90 F + 28 (P1 + P2 + P3 + P4 + P5) Subject to the constraints: Part Time Hours Cannot Exceed 56 Hours 4 (P1 + P2 + P3 + P4 + P5) < 56
31
Minimum Num. Tellers Needed By Hour
Time of Day F + P > 10 (9-10) F + P1 + P2 > 12 (10-11) 0.5 F + P1 + P2 + P3 > 14 (11-12) 0.5 F + P1 + P2 + P3+ P4 > 16 (12-1) F + P2 + P3+ P4 + P5 > 18 (1-2) F + P3+ P4 + P5 > 17 (2-3) F + P4 + P > 15 (3-4) F + P > 10 (4-5)
32
Only 12 Full Time Tellers Available F < 12 finally nonnegativity: F, P1, P2, P3, P4, P5 > 0
33
Vehicle Loading: Goodman Shipping
How to load a truck subject to weight and volume limitations Decision: How much of each of 6 items to load onto a truck? Objective: Maximize the value shipped
34
Data Item 1 2 3 4 5 6 Value $15,500 $14,400 $10,350 $14,525 $13,000 $9,625 Pounds 5000 4500 3000 3500 4000 $ / lb $3.10 $3.20 $3.45 $4.15 $3.25 $2.75 Cu. ft. per lb 0.125 0.064 0.144 0.448 0.048 0.018
35
Decision Variables Wi = number of pounds of item i to load onto truck , (where i = 1,…,6) Truck Capacity 15,000 pounds 1,300 cubic feet
36
Objective Function (in $ of load value)
Max 3.10W W W W W W6 Subject to the constraints: Weight Limit Of 15,000 Pounds W1 + W2 + W3 + W4 + W5 + W6 < 15,000
37
Volume Limit Of 1300 Cubic Feet 0.448W4 + 0.048W5 + 0.018W6 < 1300
Pounds of Each Item Available W1 < 5000 W4 < 3500 W2 < W5 < 4000 W3 < 3000 W6 < 3500 Finally nonnegativity: Wi > 0, i=1,…,6 Go to Goodman Shipping in LPExamplesFile
38
Blending Problem: Whole Food Nutrition Center
Making a natural cereal that satisfies minimum daily nutritional requirements Decision: How much of each of 3 grains to include in the cereal? Objective: Minimize cost of a 2 ounce serving of cereal
39
Minimum Daily Requirement
Grain Minimum Daily Requirement A B C $ per pound $0.33 $0.47 $0.38 Protein per pound 22 28 21 3 Riboflavin per pound 16 14 25 2 Phosphorus per pound 8 7 9 1 Magnesium per pound 5 6 0.425
40
Decision Variables A = pounds of grain A to use B = pounds of grain B to use C = pounds of grain C to use Note: grains will be blended to form a 2 ounce serving of cereal
41
Total Blend is 2 Ounces, or 0.125 Pounds
Objective Function (in $ of cost) Min 0.33A B C Subject to the constraints: Total Blend is 2 Ounces, or Pounds A + B + C = (lbs)
42
Minimum Nutritional Requirements 22A + 28B + 21C > 3 (protein)
16A + 14B + 25C > 2 (riboflavin) 8A + 7B + 9C > 1 (phosphorus) 5A C > (magnesium) Finally nonnegativity: A, B, C > 0 Go to Whole Foods in LPExamplesFile
43
Multiperiod Scheduling: Greenberg Motors
Need to schedule production of 2 electrical motors for each of the next 4 months Decision: How many of each type of motor to make each month? Objective: Minimize total production and inventory cost
44
Decision Variables PAt = number of motor A to produce in month t (t=1,…,4) PBt = number of motor B to produce in IAt = inventory of motor A at end of IBt = inventory of motor B at end of
45
Sales Demand Data Month Motor A B 1 (January) 800 1000 2 (February)
700 1200 3 (March) 1400 4 (April) 1100
46
Production Data Motor (values are per motor) A B Production cost $10
$6 Labor hours 1.3 0.9 Production costs will be 10% higher in months 3 and 4 Monthly labor hours must be between 2240 and 2560
47
Max inventory is 3300 motors
Inventory Data Motor A B Inventory cost (per motor per month) $0.18 $0.13 Beginning inventory (beginning of month 1) Ending Inventory (end of month 4) 450 300 Max inventory is 3300 motors
48
Production and Inventory Balance
(inventory at end of previous period) + (production the period) - (sales this period) = (inventory at end of this period)
49
Objective Function (in $ of cost) Min 10PA1 + 10PA2 + 11PA3 + 11PA4
+ 6PB1 + 6 PB PB PB4 + 0.18(IA1 + IA2 + IA3 + IA4) + 0.13(IB1 + IB2 + IB3 + IB4) Subject to the constraints: (see next slide)
50
Production & Inventory Balance 0 + PA1 – 800 = IA1 (month 1) 0 + PB1 – 1000 = IB1 IA1 + PA2 – 700 = IA2 (month 2) IB1 + PB2 – 1200 = IB2 IA2 + PA3 – 1000 = IA3 (month 3) IB2 + PB3 – 1400 = IB3 IA3 + PA4 – 1100 = IA4 (month 4) IB3 + PB4 – 1400 = IB4
51
Ending Inventory IA4 = 450 IB4 = 300 Maximum Inventory level IA1 + IB1 < 3300 (month 1) IA2 + IB2 < 3300 (month 2) IA3 + IB3 < 3300 (month 3) IA4 + IB4 < 3300 (month 4)
52
Range of Labor Hours 2240 < 1. 3PA1 + 0
Range of Labor Hours 2240 < 1.3PA PB1 < 2560 (month 1) 2240 < 1.3PA PB2 < 2560 (month 2) 2240 < 1.3PA PB3 < 2560 (month 3) 2240 < 1.3PA PB4 < 2560 (month 4) finally nonnegativity: PAi, PBi, IAi, IBi > 0 Try to do this one on your own.