Presentation is loading. Please wait.

Presentation is loading. Please wait.

DESY / XFEL – Tunnel layout, transport and handling solutions

Similar presentations


Presentation on theme: "DESY / XFEL – Tunnel layout, transport and handling solutions"— Presentation transcript:

1 DESY / XFEL – Tunnel layout, transport and handling solutions
I. Ruehl / EN-HE

2 European XFEL in a nutshell
Research facility of superlatives: Generation of ultrashort X-ray flashes— times per second and with a brilliance that is a billion times higher than that of the best conventional X-ray radiation sources. 3,4 km-long facility from Hamburg to Schleswig-Holstein Construction costs, including commissioning, amount to 1.22 Billion EUR (price levels of 2005), Germany covers 58%, Russia (27%), others between 1-3% At present 11 countries participating

3 The European XFEL.

4

5 Asset Management. Examples:
Superconducting accelerator modules for the European XFEL: 100 modules build over two years Components from different vendors Assembly in different countries Different CAD systems involved Safety documents required Documentation: Electronic Data Management System EDMS ‘If you want to hide a document, put it in the EDMS’

6

7


Download ppt "DESY / XFEL – Tunnel layout, transport and handling solutions"

Similar presentations


Ads by Google