Download presentation
Presentation is loading. Please wait.
1
Off-Site Construction
____________________________________________ Chris Goodier PhD MCIOB FICT FHEA School of Civil and Building Engineering Loughborough University 19th Jan 2017
2
Offsite construction Scene setting The need Types of offsite
Offsite vs traditional? How to decide
3
The need Opportunity – lots of civil engineering needs
4
The need New Civil Engineer, 30/09/15
We shouldn’t worry that we don’t need people More a case of, How will we deliver? New Civil Engineer, 30/09/15
5
The need We also have targets to meet Construction 2025
6
But we do need to start doing some things differently, which is INNOVATION
NCE Feb 2016, cover
8
So…… We have lots of infrastructure in the pipeline
We have less people to deliver it We have numerous targets to meet: costs, delivery, emissions, exports etc We need to deliver things differently Offsite can help……
9
But before we get excited……
10
How long is innovation innovative?
Gartner Hype Cycle Hype Peak of inflated expectations Plateau of productivity (ie acceptance of technology) Slope of enlightenment Trough of disillusionment 1999 Technology trigger Maturity / Time How long is innovation innovative? After Gartner, USA
11
NCE Feb 2016 ….. Gartner hype cycle
a branded graphical presentation developed and used by US research and advisory firm Gartner for representing the maturity, adoption and social application of specific technologies through five phases from concept to practical application. Advanced Infrastructure Manufacturing and Operation (AIMOC) UKCRIC 1st March 2016
12
AR v VR
13
What is Offsite? Manufacture and assembly before installation
Level 0 – Materials Level 1 - Component Sub-assembly Level 2 - Non-volumetric pre-assembly Level 3 – Volumetric pre-assembly Level 4 – Modular Building Different levels Pre-assembly is not new - accepted practice for structural frames, cladding panels and ductwork. Volumetric units create usable space, are finished internally and are installed within and onto an independent structural frame, e.g. toilet pods?, plant rooms, lift shafts. Modular building - volumetric units where each unit forms the structures fabric of the building, e.g. hotels, prison blocks, McDonalds.
14
Second Severn Crossing 1996
15
Level 2 - Pre-assembled services module for Brindley Place, Birmingham
Courtesy Crown House Engineering
16
Level 3 Packaged Plantrooms Courtesy Haden
17
Level 4 – Modular Building McDonalds
Courtesy Yorkon
18
But do we take full advantage?
We usually…… design as ‘stick-build’ traditional Then decide to ‘go offsite’
19
Or, we… DO decide early to ‘go offsite’ Then… forget about it…..
Sometimes for well thought-out, logical reasons Sometimes not Then… forget about it….. thinking that offsite, by definition, will solve all of our problems…..
20
Offsite or onsite or both?
Arup Global Research Challenge Innovative approaches to the modular construction of commercial buildings in transportation hubs
21
Arup – Future of Rail AIM (what): develop a global strategic vision and local business models
-virtual shopping mall -modules as cargo -tagging that will aid the improvement of the adaptability of platform-side commercial provision in transportation hubs.
22
But….. how much offsite? % offsite = Total Hours moved offsite .
Total construction Hours (Stick Built) Volume? Weight? In Malaysia, 70% has to be IBS…… Does it matter?
23
offsite.lboro.ac.uk 2014 1999 Started career as Engineer & Manager
Nuclear & Large commercial Jumped ship to academia early ‘90s Had to do research – what in? Prefabrication / modularisation Various research projects Wrote a book 20 years ago Included engineering construction – oil & gas, petro-chem Singapore Aromatics Plant What has changed? – Not much? offsite.lboro.ac.uk
24
Loughborough Offsite Projects
Team Loughborough Offsite Projects CIRIA S&P/Offsite Buildoffsite IMMPREST HASPREST Whittles Offsite CRISP NHS Estates CIMclad Cladd:ISS Offsite Skills Offsite Sustainability Concrete Printing Adaptable Futures Offsite Infrastructure
25
1999
26
offsite.lboro.ac.uk
27
Login cgoodier Uni password offsite.lboro.ac.uk offsite.lboro.ac.uk
28
Offsite construction Scene setting Types of offsite
The need Types of offsite Offsite vs traditional? How to decide tools available
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.