3 Innovative solution for the great lakes
Announcement in April 2015 Order for 12 BWTS for lakers under construction Why did we do this?

4 FEDNAV Incorporated in 1944 Privately held Headquartered in Montreal
Largest Canadian dry-cargo shipping group Leaders in ice-class international Handysize/Supramax bulk carrier ownership and operation 30% of ocean-going voyages in the Great Lakes (177 in 2015)

5 OWNED FLEET + 18 bulk carrier on long-term charter (+ 2 on order)
Ship Type and Size Current On Order Handysize Lakers (27,500 to 37,000 DWT) 41 6 Handysize (37,000 DWT) 8 -- Supramax (53,500 to 56,000 DWT) Icebreakers (25,000 to 32,000 DWT) 3 TOTAL OWNED by Fednav 58 + 18 bulk carrier on long-term charter (+ 2 on order) + 22 bulk carriers on short-term or voyage charter (as of 2017/05/17)

6 360 different ports visited each year
Top 10% of ports visited

7 Regulations in the great lakes: chaos in 2008

8 REGULATIONS in the great lakes: now
Harmonization of standards: IMO / USCG / EPA Some harmonization under the EPA’s Vessel General Permit 3 specific permits Michigan Minnesota Wisconsin Specific requirements, e.g.: Saltwater Chemicals

9 BW Treatment systems and METHODS
IMO Type-Approved 70 USCG Type-Approved 3 Ballast Water Management Methods Treatment Mechanical Physical Chemical Disinfectants Organic biocides Electrolytically generated copper and silver ions Manipulation of ambient conditions Filtration Cyclonic separation Thermal (Heat) Ultraviolet Ultrasound

10 OUR solution All about a process Began 15 years ago Multiple testing
Federal Yukon Copper ions Federal Welland Electrodialytic Disinfectant Federal Venture Chlorination Millions of dollars

11 Federal yukon – 2001

12 Federal welland – 2005

13 Federal Venture – 2012

14 federal biscay

15 JFE System Filtration Backwash design 1,500 m3/h Chlorination
Up to 20 ppm 12% liquid chlorine Ballast tank holding time 24 hours minimum Neutralization Sodium sulfite

16 INSTALLATION Timeline
October 2015 January to September 2016 January and May 2016 Delivery of Federal Biscay Delivery of 6 C-Class lakers Installation on 2 Supramax Installation on 5 B-Class lakers, pending USCG approval

17 Implementation going forward
New builds - Deliver with systems 4 Handysize (2017/2018) Announcement in April of an order for 4 BWTS from Optimarin, AS Optimarin AS, of Norway, is the first company (out of a current total of three) to have a BWTS approved by the US Coast Guard, a condition to operate in the waters of the United States The Optimarin system is based on filtration and high doses of UV irradiation for inactivation of marine organisms, viruses and bacteria. Ballast water is UV treated both during ballasting and de-ballasting to ensure the dual UV effect. The system is certified to operate in all salinities (freshwater, brackish and seawater).

18 Design Changes to new vessels

19 MOVING TOWARDS IMPLEMENTATION
Though a challenge, the current standards can be met in practice Many BWTS are installed, but very few are utilized Challenges remain: How may approved systems before the USCG removes the extension? Implementation timeline for new ships and retrofits will be challenging The severity of the financial crisis afflicting shipping

20 CONCLUSION This is a solution for Fednav, not necessarily for others
We are taking a calculated risk, by Moving before regulations Installing non-approved systems Dealing with the 72-hour retention time on UV systems We are doing it, because of: Environmental considerations, esp. in the Great Lakes Commercial considerations (availability, cost, etc.) This is the right thing to do