Presentation is loading. Please wait.

Presentation is loading. Please wait.

Cluster Status & Plans —— Gang Qin

Similar presentations


Presentation on theme: "Cluster Status & Plans —— Gang Qin"— Presentation transcript:

1 Cluster Status & Plans —— Gang Qin
Feb

2 Power Supply & Consumption
Power supply and consumption in building 175: 32A total, 13A reserved for VME crates and UPS recharging, 19A left for valtical cluster, currently valtical cluster needs ~12A at full load, 7 A for new machines One 16 core machine needs ~1.5A at full load, ~0.8A at idle status (2)

3 New UI INTEL DUAL XEON 2U SERVER SuperMicro X8DTE-F mainboard
SuperMicro 2U server Chassis. 2 x Xeon E5645 CPU, 2.4GHz, 12MB, 6-core, 80W 48GB DDR3 ECC Reg memory (6 x 8GB) tri-channel 8 x 3.5" hot-swap HDD trays (8 cabled, 5 used, 2-free) 1 x WD5003ABYX, 500GB, 7200rpm, 64MB, 24/7 raid version (for OS) 4 x WD2003FYYS, 2TB, 7200rpm, 64MB, 24/7 raid version (8TB storage) 720W Redundent power supply, high-efficiency Assembled and Tested CERN Linux and Windows compatible Warranty: 3 years On-site repair Fr 5'156.- (3)

4 Service Reports PDU was installed between the UPS and the cluster, after that, valtical00 can’t start up due to connection problem with a hard disk which serves as /data5 This disk was removed and checked but no bad block was found, then it was reconnected to valtical00 via USB line, a new 2T hard disk was delivered and used to replace the previous /data5, data are transferred to this new hard disk but some problem happened during NFS mouting, fixed later. Unexpected power cut in the cluster room last Friday morning, recovered later (4)

5 Thank you 5


Download ppt "Cluster Status & Plans —— Gang Qin"

Similar presentations


Ads by Google